2006-2008 Partnership Projects<br />

<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

MOLECULR SCI<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4228C<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

<strong>Plan</strong>ned Electric <strong>Plan</strong>ned Gas<br />

Savings<br />

Savings<br />

Project Description<br />

(kWh/yr)<br />

(th/yr)<br />

Upgrade vent and controls and install ZP sensors on 194 fume hoods 0 167,232<br />

Upgrade vent and controls and install ZP sensors on 26 fume hoods 0 22,410<br />

D1015 AHU - 5 VIV to VAV & SP Reset<br />

D1016 AHU 1, 2, 3, 4 & 6 Aircuity<br />

D3009 Monitoring Based Commissioning<br />

1993<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

10,294 0.0 16 0 1,857 $1,111<br />

2,629,450 68.0 13,688 0 104,815 $313,196<br />

337,679 38.0 0 36,269 0 $49,632<br />

Basic Gross Area (sf): 178,666<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Cost<br />

($)<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$35,195 $3,027 $32,168 28.9<br />

Committed Tier:<br />

Backup<br />

$1,155,824 $822,292 $333,532 1.1<br />

Committed Tier:<br />

Backup<br />

$302,109 $117,312 $184,797 3.7<br />

Totals 2,977,423 106.0 13,704 36,269 106,672 $363,939 $1,493,128 $942,631 $550,497 1.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

6,784,350 423,400 38.0 2.4<br />

625.8<br />

6,784,350 233,758 38.0 1.3<br />

519.6<br />

3,721,589 26,189 20.8 0.1<br />

227.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

17.0%<br />

56.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th