Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Gross<br />

Net<br />

Estimated<br />

Simple<br />

Total Cost Estimated Utility Net Project Payback<br />

Savings ($/yr) Project Cost ($) Incentive ($) Cost ($) (yrs)<br />

$ 145,134 $ 376,752 $ 384,615 $ 75,350 0.5<br />

$ 9,332 $ 40,897 $ 24,902 $ 15,995 1.7<br />

$ 20,947 $ 115,534 $ 55,772 $ 59,762 2.9<br />

$ 5,379 $ 10,407 $ 14,441 $ 2,081 0.4<br />

$ 12,432 $ 41,969 $ 33,071 $ 8,898 0.7<br />

$ 5,988 $ 9,013 $ 16,330 $ 1,803 0.3<br />

$ 11,197 $ 45,552 $ 29,767 $ 15,785 1.4<br />

$ 12,122 $ 47,642 $ 32,257 $ 15,385 1.3<br />

$ 12,720 $ 74,077 $ 33,874 $ 40,203 3.2<br />

$ 17,733 $ 115,587 $ 48,363 $ 67,224 3.8<br />

$ 3,004,396 $ 27,552,281 $ 7,904,780 $ 19,647,501 6.5<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

Demand<br />

Savings (kW)<br />

23.0<br />

-<br />

1.0<br />

2.0<br />

1.0<br />

-<br />

-<br />

1.0<br />

1.0<br />

34.0<br />

1,148.0<br />

$ 4,805 $ 44,187 $ 13,104 $ 31,083 6.5<br />

-<br />

8.0<br />

$ 34,936 $ 286,838 $ 95,281 $ 191,557 5.5<br />

Total<br />

Purchased<br />

SEP<br />

Electricity<br />

Project Building<br />

Savings<br />

ID Key Building Name Project Name<br />

(kWh/yr)<br />

D3226 04C4594 REHAB CENTER Dual Duct Conversion to VAV (Cogent Report) 1,649,252<br />

D1001 04C515A COLLINS CTR AHU - 1 VIV to VAV SP Reset 106,041<br />

D1014 04C515B GOLD HALL AHU - 2, 7, 9 VIV to VAV SP Reset 238,032<br />

D1037 04C515C ENTREP HALL VFD + DCV for a CAV system 61,127<br />

D1036 04C515C ENTREP HALL AHU - 3 VIV to VAV SP Reset 141,268<br />

D6007 04C515D CORNELL HALL CW Reset 68,040<br />

D1057 04C515D CORNELL HALL AHU - 4 VIV to VAV SP Reset 127,238<br />

D1058 04C515E ROSNFLD LIBR AHU - 6 VIV to VAV SP Reset 137,755<br />

D1059 04C515F MULLIN CMNS AHU - 5 & 10 VIV to VAV SP Reset 144,543<br />

D6012 04CWIDE CAMPUSWIDE Pump VFDs 201,511<br />

Subtotal, State Funded, HVAC Projects 34,140,869<br />

Lighting Projects<br />

Retrofit gym HID fixtures with Pulse Start Metal Halide lamps<br />

D3210 04C4204 PAULEY<br />

w/electronic ballasts 54,600<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3203 04C4235 WOODEN/PS4<br />

and install photocell control where appropriate 397,003<br />

-<br />

45.0<br />

$ 653 $ 3,708 $ 1,782 $ 1,926 2.9<br />

-<br />

2.0<br />

$ 1,405,998 $ 23,858,410 $ 3,834,540 $ 20,023,870 14.2<br />

-<br />

4,590.0<br />

$ 18,480 $ 233,962 $ 50,400 $ 183,562 9.9<br />

$ 1,464,872 $ 24,427,106 $ 3,995,107 $ 20,431,999 13.9<br />

-<br />

-<br />

-<br />

4,645.0<br />

Retrofit kitchen fixtures from F40T12 lamps with magnetic<br />

D3194 04C4261 FACULTY CTR<br />

ballasts to F32T8 (28-watt) lamps with RLO electronic ballasts 7,425<br />

Retrofit all F32T8 fixtures with 28W F32 T8 lamps and RLO<br />

D3219 04CWIDE CAMPUSWIDE<br />

ballasts, and install additional occupancy sensors 15,977,250<br />

Replace 600 additional stairwell light fixtures with bi-level fixtures<br />

D3192 04CWIDE CAMPUSWIDE with occupancy sensors in campus buildings 210,000<br />

Subtotal, State Funded, Lighting Projects 16,646,278<br />

Other Projects<br />

$ 13,771 $ 75,954 $ 37,557 $ 38,397 2.8<br />

-<br />

-<br />

Future Million-Gallon Pool at Sunset Canyon: Variable Speed<br />

Circulation Pumps 156,488<br />

Sunset Canyon Diving & Family Pools: Variable Speed<br />

Circulation Pumps 71,539<br />

D3216 04CWIDE CAMPUSWIDE<br />

$ 6,295 $ 25,331 $ 17,169 $ 8,162 1.3<br />

-<br />

-<br />

D3215 04CWIDE CAMPUSWIDE<br />

$ 11,674 $ 64,507 $ 31,837 $ 32,670 2.8<br />

$ 4,760 $ 17,033 $ 12,981 $ 4,052 0.9<br />

$ 6,927 $ 113,913 $ 12,614 $ 101,299 14.6<br />

$ 3,239 $ 21,205 $ 8,834 $ 12,371 3.8<br />

$ 12,320 $ 145,530 $ 33,600 $ 111,930 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

$ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

-<br />

18.0<br />

35.0<br />

35.0<br />

35.0<br />

35.0<br />

$ 4,177 $ 27,990 $ 11,391 $ 16,599 4.0<br />

-<br />

6.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

D3214 04CWIDE CAMPUSWIDE Sunset Canyon Park Pool: Variable Speed Circulation Pumps 132,655<br />

D3213 04CWIDE CAMPUSWIDE North Pool: Variable Speed Circulation Pumps 54,089<br />

D3212 04CWIDE CAMPUSWIDE SAC Pool: Solar Pool Water Heater 78,711<br />

D3211 04CWIDE CAMPUSWIDE SAC Pool: Variable Speed Circulation Pumps 36,809<br />

D3122 04CWIDE CAMPUSWIDE Server Virtualization Phase 5 of 5: 5 VM Installations 140,000<br />

D3121 04CWIDE CAMPUSWIDE Server Virtualization Phase 4 of 5: 10 VM Installations 280,000<br />

D3120 04CWIDE CAMPUSWIDE Server Virtualization Phase 3 of 5: 10 VM Installations 280,000<br />

D3119 04CWIDE CAMPUSWIDE Server Virtualization Phase 2 of 5: 10 VM Installations 280,000<br />

D3118 04CWIDE CAMPUSWIDE Server Virtualization Phase 1 of 5: 10 VM Installations 280,000<br />

LCD Phase 9 of 9: 222 Verdiem (PC Power Management)<br />

D3117 04CWIDE CAMPUSWIDE<br />

Installations and 9 CRT Replacements 47,463<br />

LCD Phase 8 of 9: 1000 Verdiem (PC Power Management)<br />

D3116 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 7 of 9: 1000 Verdiem (PC Power Management)<br />

D3115 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 6 of 9: 1000 Verdiem (PC Power Management)<br />

D3114 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 5 of 9: 1000 Verdiem (PC Power Management)<br />

D3113 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 4 of 9: 1000 Verdiem (PC Power Management)<br />

D3112 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 3 of 9: 1000 Verdiem (PC Power Management)<br />

D3111 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

LCD Phase 2 of 9: 1000 Verdiem (PC Power Management)<br />

D3110 04CWIDE CAMPUSWIDE<br />

Installations and 40 CRT Replacements 213,796<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0<br />

$ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9<br />

-<br />

27.0