Table 11.1: SEP Projects by Funding Source and Project Type (Continued) Gross Net Estimated Simple Total Cost Estimated Utility Net Project Payback Savings ($/yr) Project Cost ($) Incentive ($) Cost ($) (yrs) $ 28,923 $ 86,096 $ 77,061 $ 17,219 0.6 $ 4,319 $ 30,759 $ 11,515 $ 19,244 4.5 $ 19,439 $ 81,053 $ 52,371 $ 28,682 1.5 $ 6,302 $ 30,085 $ 16,811 $ 13,274 2.1 $ 16,922 $ 96,194 $ 45,384 $ 50,810 3.0 $ 6,787 $ 46,817 $ 17,665 $ 29,152 4.3 $ 8,211 $ 44,343 $ 22,043 $ 22,300 2.7 $ 2,206 $ 19,798 $ 6,071 $ 13,727 6.2 $ 12,425 $ 46,563 $ 33,317 $ 13,246 1.1 $ 4,057 $ 48,385 $ 11,206 $ 37,179 9.2 $ 1,933 $ 36,901 $ 5,057 $ 31,844 16.5 $ 39,995 $ 301,401 $ 106,056 $ 195,345 4.9 $ 82,105 $ 2,503,946 $ 215,086 $ 2,288,860 27.9 $ 6,739 $ 58,784 $ 17,420 $ 41,364 6.1 $ 22,569 $ 117,329 $ 60,590 $ 56,739 2.5 $ 22,221 $ 113,025 $ 57,757 $ 55,268 2.5 $ 8,190 $ 26,664 $ 21,169 $ 5,495 0.7 $ 23,358 $ 219,224 $ 61,921 $ 157,303 6.7 $ 88,886 $ 452,102 $ 231,026 $ 221,076 2.5 $ 111,107 $ 565,127 $ 288,783 $ 276,344 2.5 $ 3,548 $ 26,360 $ 9,331 $ 17,029 4.8 $ 20,571 $ 317,011 $ 53,987 $ 263,024 12.8 $ 43,540 $ 121,465 $ 115,384 $ 24,293 0.6 $ 66,664 $ 339,076 $ 173,270 $ 165,806 2.5 $ 59,907 $ 263,726 $ 158,444 $ 105,282 1.8 $ 51,848 $ 263,726 $ 134,761 $ 128,965 2.5 $ 64,659 $ 161,132 $ 166,693 $ 32,226 0.5 $ 125,633 $ 358,186 $ 323,388 $ 71,637 0.6 $ 14,969 $ 9,013 $ 40,824 $ 1,803 0.1 $ 205,550 $ 4,023,619 $ 545,095 $ 3,478,524 16.9 $ 16,408 $ 495,153 $ 43,975 $ 451,178 27.5 $ 1,009 $ 46,015 $ 2,789 $ 43,226 42.8 $ 51,848 $ 263,726 $ 134,761 $ 128,965 2.5 $ 81,480 $ 414,427 $ 211,778 $ 202,649 2.5 $ 32,396 $ 49,351 $ 84,100 $ 9,870 0.3 $ 10,057 $ 185,171 $ 27,553 $ 157,618 15.7 $ 9,720 $ 45,550 $ 25,178 $ 20,372 2.1 $ 51,848 $ 263,726 $ 134,761 $ 128,965 2.5 $ 1,025 $ 7,599 $ 2,796 $ 4,803 4.7 $ 18,674 $ 352,860 $ 50,928 $ 301,932 16.2 $ 3,261 $ 156,646 $ 5,938 $ 150,708 46.2 $ 55,187 $ 3,048,573 $ 133,376 $ 2,915,197 52.8 Total Purchased Gas Savings (th/yr) - - - - - - - (0) - (0) - - - - - - - - - - - - - - - - - - - - - - - - - Demand Savings (kW) 24.0 1.0 4.0 1.0 1.0 - 4.0 5.0 7.0 10.0 1.0 - 32.0 - 1.0 3.0 - 12.0 13.0 16.0 1.0 9.0 7.0 10.0 - 7.0 2.0 15.0 - 154.0 14.0 (2.0) 7.0 12.0 1.0 11.0 - 7.0 2.0 72.0 - 21.0 Total Purchased SEP Electricity Project Building Savings ID Key Building Name Project Name (kWh/yr) D1005 04C4315 GONDA CENTER CV Rebalance 328,672 D1047 04C4317 LAW S-8 CAV to VAV 49,076 D1046 04C4317 LAW S-5 & 6 CAV to VAV 220,903 D1045 04C4317 LAW S-4 CAV to VAV 71,619 D1044 04C4317 LAW SF 3 & 7 VIV to VAV & SP Reset 192,296 D1043 04C4317 LAW SF 1 & 2 SP Reset 77,125 D1021 04C4318A POWELL LIB AH 20 CAV to VAV 93,311 D1020 04C4318A POWELL LIB AH 18, 38 & 39 CAV to VAV 25,070 D1019 04C4318A POWELL LIB AH-19 CAV to VAV 141,194 D1018 04C4318A POWELL LIB AH 1 to 4, 17 & 37 CAV to VAV with DCV 46,108 D1017 04C4318A POWELL LIB S-1 CAV to VAV 21,971 D3223 04C4319 FRANZ HALL Dual Duct Conversion to VAV (Cogent Report) 454,484 D1010 04C4320 LIFE SCIENCE SF - 4 & 5 - Aircuity 933,010 D1009 04C4320 LIFE SCIENCE Vivarium - CV Rebalance 76,582 D1061 04C4325 DORIS STEIN AHU - 1, 2 & 3 VIV to VAV SP Reset 256,468 D3234 04C4329 REED RESRCH Dual Duct Conversion to VAV (Cogent Report) 252,517 D1042 04C4331 PUBLIC HLTH CV Rebalance - S-1 93,063 D1041 04C4331 PUBLIC HLTH CAV to VAV - AHU S-2 to S-9 265,427 D3228 04C4332B BRAIN RSCH Dual Duct Conversion to VAV (Cogent Report) 1,010,067 D3233 04C4332D HEALTH SCI Dual Duct Conversion to VAV (Cogent Report) 1,262,583 D1040 04C4332E M DAVIES CC AHU 1 CAV to VAV 40,321 D1039 04C4333 JULES STEIN S2, 3 & 4Aircuity 233,762 D1038 04C4333 JULES STEIN S-1, 5 & 6 CAV to VAV 494,776 D3229 04C4334 DENTISTRY Dual Duct Conversion to VAV (Cogent Report) 757,550 D3220 04C4335 SCHOENBERG Dual Duct Conversion to VAV (Cogent Report) 680,760 D3230 04C4336 FACTOR Dual Duct Conversion to VAV (Cogent Report) 589,184 D1053 04C4343 BOELTER HALL AH 4 to 7, 10 to 12 - SP Reset 734,759 D1052 04C4343 BOELTER HALL S-1 to 11 except 9 - CAV to VAV 1,427,651 D6008 04C4345 MED PLZA 300 CW Reset 170,100 D1013 04C4348 MACDONALDLAB Lab CAV to VAV with Aircuity 2,335,790 D1012 04C4348 MACDONALDLAB AHU 2 Vivarium Aircuity 186,450 D1011 04C4348 MACDONALDLAB AHU 1 VIV to VAV & SP Reset 11,470 D3232 04C4359 MATH SCIENCE Dual Duct Conversion to VAV (Cogent Report) 589,184 D3231 04C4363 KNUDSEN HALL Dual Duct Conversion to VAV (Cogent Report) 925,914 D1003 04C4374 FOWLER MUSM AHU 1 & 2 SP Reset 368,136 D1023 04C4375 ROYCE HALL AC 3, 4, 6 to 8 - CAV to VAV 114,281 D1022 04C4375 ROYCE HALL AC 1 & 2 - SP Reset 110,457 D3227 04C4403 BOYER HALL Dual Duct Conversion to VAV (Cogent Report) 589,184 D6011 04C4415 UNEX CT VFDs 11,650 D6005 04C4415 UNEX Replace Chiller 212,201 D6003 04C4415 UNEX Replace Boiler 37,053 D1035 04C4415 UNEX AHU 1 to 8 T-1 & T-2 CAV to VAV 627,124 SOUTHERN REGIONAL D6009 04C4562 LIBRARY FACILITY CW Reset 40,032 SOUTHERN REGIONAL D6004 04C4562 LIBRARY FACILITY Replace Chiller 264,354 SOUTHERN REGIONAL D1026 04C4562 LIBRARY FACILITY AHU 3 5 & SF-1 CAV to VAV with SP Reset 147,123 SOUTHERN REGIONAL D1025 04C4562 LIBRARY FACILITY AHU 1, 2 & 4 SP Reset 554,493 D3224 04C4577A MELNITZ HALL Dual Duct Conversion to VAV (Cogent Report) 106,630 D3222 04C4578 MACGOWAN Dual Duct Conversion to VAV (Cogent Report) 333,970 D3221 04C4579 PUBLIC AFFAIRS Dual Duct Conversion to VAV (Cogent Report) 350,601 D6013 04C4580 BUNCHE HALL TOD EF 8,081 D1060 04C4580 BUNCHE HALL Apply DDC controls, convert to VAV 1,861,221 D3236 04C4581 WARREN HALL Dual Duct Conversion to VAV (Cogent Report) 420,882 (0) - - - - - - $ 3,523 $ 9,013 $ 9,608 $ 1,803 0.5 - - $ 23,263 $ 387,408 $ 63,445 $ 323,963 13.9 - 80.0 $ 12,947 $ 132,983 $ 33,019 $ 99,964 7.7 - 4.0 $ 48,795 $ 72,370 $ 123,813 $ 14,474 0.3 $ 9,383 $ 75,350 $ 25,457 $ 49,893 5.3 $ 29,389 $ 301,401 $ 76,655 $ 224,746 7.6 $ 30,853 $ 339,076 $ 81,744 $ 257,332 8.3 $ 711 $ 2,253 $ 1,939 $ 451 0.6 $ 163,787 $ 3,634,425 $ 428,856 $ 3,205,569 19.6 $ 37,038 $ 188,376 $ 96,265 $ 92,111 2.5 - - - - - - - 5.0 1.0 - - - 67.0 5.0
Table 11.1: SEP Projects by Funding Source and Project Type (Continued) Gross Net Estimated Simple Total Cost Estimated Utility Net Project Payback Savings ($/yr) Project Cost ($) Incentive ($) Cost ($) (yrs) $ 145,134 $ 376,752 $ 384,615 $ 75,350 0.5 $ 9,332 $ 40,897 $ 24,902 $ 15,995 1.7 $ 20,947 $ 115,534 $ 55,772 $ 59,762 2.9 $ 5,379 $ 10,407 $ 14,441 $ 2,081 0.4 $ 12,432 $ 41,969 $ 33,071 $ 8,898 0.7 $ 5,988 $ 9,013 $ 16,330 $ 1,803 0.3 $ 11,197 $ 45,552 $ 29,767 $ 15,785 1.4 $ 12,122 $ 47,642 $ 32,257 $ 15,385 1.3 $ 12,720 $ 74,077 $ 33,874 $ 40,203 3.2 $ 17,733 $ 115,587 $ 48,363 $ 67,224 3.8 $ 3,004,396 $ 27,552,281 $ 7,904,780 $ 19,647,501 6.5 Total Purchased Gas Savings (th/yr) - - - - - - - - - - - Demand Savings (kW) 23.0 - 1.0 2.0 1.0 - - 1.0 1.0 34.0 1,148.0 $ 4,805 $ 44,187 $ 13,104 $ 31,083 6.5 - 8.0 $ 34,936 $ 286,838 $ 95,281 $ 191,557 5.5 Total Purchased SEP Electricity Project Building Savings ID Key Building Name Project Name (kWh/yr) D3226 04C4594 REHAB CENTER Dual Duct Conversion to VAV (Cogent Report) 1,649,252 D1001 04C515A COLLINS CTR AHU - 1 VIV to VAV SP Reset 106,041 D1014 04C515B GOLD HALL AHU - 2, 7, 9 VIV to VAV SP Reset 238,032 D1037 04C515C ENTREP HALL VFD + DCV for a CAV system 61,127 D1036 04C515C ENTREP HALL AHU - 3 VIV to VAV SP Reset 141,268 D6007 04C515D CORNELL HALL CW Reset 68,040 D1057 04C515D CORNELL HALL AHU - 4 VIV to VAV SP Reset 127,238 D1058 04C515E ROSNFLD LIBR AHU - 6 VIV to VAV SP Reset 137,755 D1059 04C515F MULLIN CMNS AHU - 5 & 10 VIV to VAV SP Reset 144,543 D6012 04CWIDE CAMPUSWIDE Pump VFDs 201,511 Subtotal, State Funded, HVAC Projects 34,140,869 Lighting Projects Retrofit gym HID fixtures with Pulse Start Metal Halide lamps D3210 04C4204 PAULEY w/electronic ballasts 54,600 Replace high pressure sodium fixtures with induction fixtures D3203 04C4235 WOODEN/PS4 and install photocell control where appropriate 397,003 - 45.0 $ 653 $ 3,708 $ 1,782 $ 1,926 2.9 - 2.0 $ 1,405,998 $ 23,858,410 $ 3,834,540 $ 20,023,870 14.2 - 4,590.0 $ 18,480 $ 233,962 $ 50,400 $ 183,562 9.9 $ 1,464,872 $ 24,427,106 $ 3,995,107 $ 20,431,999 13.9 - - - 4,645.0 Retrofit kitchen fixtures from F40T12 lamps with magnetic D3194 04C4261 FACULTY CTR ballasts to F32T8 (28-watt) lamps with RLO electronic ballasts 7,425 Retrofit all F32T8 fixtures with 28W F32 T8 lamps and RLO D3219 04CWIDE CAMPUSWIDE ballasts, and install additional occupancy sensors 15,977,250 Replace 600 additional stairwell light fixtures with bi-level fixtures D3192 04CWIDE CAMPUSWIDE with occupancy sensors in campus buildings 210,000 Subtotal, State Funded, Lighting Projects 16,646,278 Other Projects $ 13,771 $ 75,954 $ 37,557 $ 38,397 2.8 - - Future Million-Gallon Pool at Sunset Canyon: Variable Speed Circulation Pumps 156,488 Sunset Canyon Diving & Family Pools: Variable Speed Circulation Pumps 71,539 D3216 04CWIDE CAMPUSWIDE $ 6,295 $ 25,331 $ 17,169 $ 8,162 1.3 - - D3215 04CWIDE CAMPUSWIDE $ 11,674 $ 64,507 $ 31,837 $ 32,670 2.8 $ 4,760 $ 17,033 $ 12,981 $ 4,052 0.9 $ 6,927 $ 113,913 $ 12,614 $ 101,299 14.6 $ 3,239 $ 21,205 $ 8,834 $ 12,371 3.8 $ 12,320 $ 145,530 $ 33,600 $ 111,930 9.1 $ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1 $ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1 $ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1 $ 24,640 $ 291,060 $ 67,200 $ 223,860 9.1 - - - - - - - - - - - - - 18.0 35.0 35.0 35.0 35.0 $ 4,177 $ 27,990 $ 11,391 $ 16,599 4.0 - 6.0 $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 - 27.0 $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 D3214 04CWIDE CAMPUSWIDE Sunset Canyon Park Pool: Variable Speed Circulation Pumps 132,655 D3213 04CWIDE CAMPUSWIDE North Pool: Variable Speed Circulation Pumps 54,089 D3212 04CWIDE CAMPUSWIDE SAC Pool: Solar Pool Water Heater 78,711 D3211 04CWIDE CAMPUSWIDE SAC Pool: Variable Speed Circulation Pumps 36,809 D3122 04CWIDE CAMPUSWIDE Server Virtualization Phase 5 of 5: 5 VM Installations 140,000 D3121 04CWIDE CAMPUSWIDE Server Virtualization Phase 4 of 5: 10 VM Installations 280,000 D3120 04CWIDE CAMPUSWIDE Server Virtualization Phase 3 of 5: 10 VM Installations 280,000 D3119 04CWIDE CAMPUSWIDE Server Virtualization Phase 2 of 5: 10 VM Installations 280,000 D3118 04CWIDE CAMPUSWIDE Server Virtualization Phase 1 of 5: 10 VM Installations 280,000 LCD Phase 9 of 9: 222 Verdiem (PC Power Management) D3117 04CWIDE CAMPUSWIDE Installations and 9 CRT Replacements 47,463 LCD Phase 8 of 9: 1000 Verdiem (PC Power Management) D3116 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 LCD Phase 7 of 9: 1000 Verdiem (PC Power Management) D3115 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 LCD Phase 6 of 9: 1000 Verdiem (PC Power Management) D3114 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 LCD Phase 5 of 9: 1000 Verdiem (PC Power Management) D3113 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 LCD Phase 4 of 9: 1000 Verdiem (PC Power Management) D3112 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 LCD Phase 3 of 9: 1000 Verdiem (PC Power Management) D3111 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 LCD Phase 2 of 9: 1000 Verdiem (PC Power Management) D3110 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 - 27.0 $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 - 27.0 $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 - 27.0 $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 - 27.0 $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 - 27.0 $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 - 27.0
- Page 1:
UC STRATEGIC ENERGY PLAN University
- Page 4 and 5:
TABLE OF CONTENTS (CONTINUED) 12. E
- Page 7 and 8:
1. EXECUTIVE SUMMARY 1.1 Policy on
- Page 9 and 10:
Table 1.1: Summary of Baseline and
- Page 11:
The campus has reviewed a prelimina
- Page 14 and 15:
Construction costs of recommended p
- Page 16 and 17:
Campus Los Angeles Santa Monica Hos
- Page 18 and 19:
2.3 Campus Overview University of C
- Page 20 and 21:
Table 2.4: SEP Buildings (Continued
- Page 23:
3. HISTORICAL CAMPUS ENERGY USE 3.1
- Page 26 and 27:
4.2 Individual Building Metering Bu
- Page 28 and 29:
of UCSD buildings is shown in Figur
- Page 31:
5. UTILITIES 5.1 Providers & Tariff
- Page 35 and 36:
7. RENEWABLE ENERGY GENERATION 7.1
- Page 37 and 38:
8. RECOMMENDED ENERGY EFFICIENCY PR
- Page 39 and 40:
One campus, UC Santa Barbara, has c
- Page 41 and 42:
The controllers themselves are prog
- Page 43 and 44:
8.2.3 Air Handler Project 3. Demand
- Page 45 and 46:
standard control sequence. Temperat
- Page 47 and 48:
8.2.11 Laboratory Air Handler Proje
- Page 49 and 50:
The projected MBCx energy savings f
- Page 51 and 52:
The budget that each campus has to
- Page 53 and 54:
8.7 Other Projects 8.7.1 Swimming P
- Page 55 and 56:
8.8.3 UCLA Custom Project 3. TOD Co
- Page 57:
9. BUILDING OVERVIEW & PROJECTS The
- Page 60 and 61:
Strategic Energy Plan Projects SEP
- Page 62 and 63:
Strategic Energy Plan Projects SEP
- Page 64 and 65:
Strategic Energy Plan Projects SEP
- Page 66 and 67:
2006-2008 Partnership Projects Stra
- Page 68 and 69:
Strategic Energy Plan Projects SEP
- Page 70 and 71:
Strategic Energy Plan Projects SEP
- Page 72 and 73:
Strategic Energy Plan Projects SEP
- Page 74 and 75:
Strategic Energy Plan Projects SEP
- Page 76 and 77:
Strategic Energy Plan Projects SEP
- Page 78 and 79:
Strategic Energy Plan Projects SEP
- Page 80 and 81:
Strategic Energy Plan Projects SEP
- Page 82 and 83:
Strategic Energy Plan Projects SEP
- Page 84 and 85:
Strategic Energy Plan Projects SEP
- Page 86 and 87:
Strategic Energy Plan Projects SEP
- Page 88 and 89:
Strategic Energy Plan Projects SEP
- Page 90 and 91:
Strategic Energy Plan Projects SEP
- Page 92 and 93:
Strategic Energy Plan Projects SEP
- Page 94 and 95:
Strategic Energy Plan Projects SEP
- Page 96 and 97:
Strategic Energy Plan Projects SEP
- Page 98 and 99:
Strategic Energy Plan Projects SEP
- Page 100 and 101:
Strategic Energy Plan Projects SEP
- Page 102 and 103:
Strategic Energy Plan Projects SEP
- Page 104 and 105:
Strategic Energy Plan Projects SEP
- Page 106 and 107:
Strategic Energy Plan Projects SEP
- Page 108 and 109:
Strategic Energy Plan Projects SEP
- Page 110 and 111:
Strategic Energy Plan Projects SEP
- Page 112 and 113:
Strategic Energy Plan Projects SEP
- Page 114 and 115:
Strategic Energy Plan Projects SEP
- Page 116 and 117:
Strategic Energy Plan Projects SEP
- Page 118 and 119:
Strategic Energy Plan Projects SEP
- Page 120 and 121:
Strategic Energy Plan Projects SEP
- Page 122 and 123:
Strategic Energy Plan Projects SEP
- Page 124 and 125:
Strategic Energy Plan Projects SEP
- Page 126 and 127:
Strategic Energy Plan Projects SEP
- Page 128 and 129:
Strategic Energy Plan Projects SEP
- Page 130 and 131:
Strategic Energy Plan Projects SEP
- Page 132 and 133:
Strategic Energy Plan Projects SEP
- Page 135 and 136:
PROJECT DETAIL REPORT SEP Project I
- Page 137 and 138:
PROJECT DETAIL REPORT SEP Project I
- Page 139:
PROJECT DETAIL REPORT SEP Project I
- Page 142 and 143:
City: Los Angeles City Index Materi
- Page 144 and 145:
PROJECT DETAIL REPORT SEP Project I
- Page 147 and 148:
PROJECT DETAIL REPORT SEP Project I
- Page 149 and 150:
PROJECT DETAIL REPORT SEP Project I
- Page 151 and 152:
PROJECT DETAIL REPORT SEP Project I
- Page 153 and 154:
City: Los Angeles City Index Materi
- Page 155 and 156:
PROJECT DETAIL REPORT SEP Project I
- Page 157 and 158:
PROJECT DETAIL REPORT SEP Project I
- Page 159 and 160:
PROJECT DETAIL REPORT SEP Project I
- Page 161 and 162:
PROJECT DETAIL REPORT SEP Project I
- Page 163 and 164:
PROJECT DETAIL REPORT SEP Project I
- Page 165 and 166:
PROJECT DETAIL REPORT SEP Project I
- Page 167 and 168:
PROJECT DETAIL REPORT SEP Project I
- Page 169 and 170:
PROJECT DETAIL REPORT SEP Project I
- Page 171 and 172:
PROJECT DETAIL REPORT SEP Project I
- Page 173 and 174:
PROJECT DETAIL REPORT SEP Project I
- Page 175 and 176:
PROJECT DETAIL REPORT SEP Project I
- Page 177 and 178:
PROJECT DETAIL REPORT SEP Project I
- Page 179 and 180:
PROJECT DETAIL REPORT SEP Project I
- Page 181 and 182:
PROJECT DETAIL REPORT SEP Project I
- Page 183 and 184:
PROJECT DETAIL REPORT SEP Project I
- Page 185 and 186:
PROJECT DETAIL REPORT SEP Project I
- Page 187 and 188:
PROJECT DETAIL REPORT SEP Project I
- Page 189 and 190:
PROJECT DETAIL REPORT SEP Project I
- Page 191 and 192:
PROJECT DETAIL REPORT SEP Project I
- Page 193 and 194:
PROJECT DETAIL REPORT SEP Project I
- Page 195 and 196:
PROJECT DETAIL REPORT SEP Project I
- Page 197 and 198:
PROJECT DETAIL REPORT SEP Project I
- Page 199 and 200:
PROJECT DETAIL REPORT SEP Project I
- Page 201 and 202:
PROJECT DETAIL REPORT SEP Project I
- Page 203:
PROJECT DETAIL REPORT SEP Project I
- Page 206 and 207:
City: Los Angeles City Index Materi
- Page 208 and 209:
PROJECT DETAIL REPORT SEP Project I
- Page 210 and 211:
PROJECT DETAIL REPORT SEP Project I
- Page 212 and 213:
PROJECT DETAIL REPORT SEP Project I
- Page 214 and 215:
PROJECT DETAIL REPORT SEP Project I
- Page 216 and 217:
PROJECT DETAIL REPORT SEP Project I
- Page 218 and 219:
PROJECT DETAIL REPORT SEP Project I
- Page 220 and 221:
PROJECT DETAIL REPORT SEP Project I
- Page 222 and 223:
PROJECT DETAIL REPORT SEP Project I
- Page 224 and 225:
PROJECT DETAIL REPORT SEP Project I
- Page 226 and 227:
PROJECT DETAIL REPORT SEP Project I
- Page 228 and 229:
PROJECT DETAIL REPORT SEP Project I
- Page 230 and 231:
PROJECT DETAIL REPORT SEP Project I
- Page 232 and 233:
PROJECT DETAIL REPORT SEP Project I
- Page 234 and 235:
PROJECT DETAIL REPORT SEP Project I
- Page 236 and 237:
PROJECT DETAIL REPORT SEP Project I
- Page 238 and 239:
PROJECT DETAIL REPORT SEP Project I
- Page 240 and 241:
PROJECT DETAIL REPORT SEP Project I
- Page 242 and 243:
PROJECT DETAIL REPORT SEP Project I
- Page 244 and 245:
PROJECT DETAIL REPORT SEP Project I
- Page 246 and 247:
PROJECT DETAIL REPORT SEP Project I
- Page 248 and 249:
PROJECT DETAIL REPORT SEP Project I
- Page 250 and 251:
PROJECT DETAIL REPORT SEP Project I
- Page 252 and 253:
PROJECT DETAIL REPORT SEP Project I
- Page 254 and 255:
PROJECT DETAIL REPORT SEP Project I
- Page 256 and 257:
PROJECT DETAIL REPORT SEP Project I
- Page 258 and 259:
PROJECT DETAIL REPORT SEP Project I
- Page 260 and 261:
PROJECT DETAIL REPORT SEP Project I
- Page 262 and 263:
PROJECT DETAIL REPORT SEP Project I
- Page 264 and 265:
PROJECT DETAIL REPORT SEP Project I
- Page 266 and 267:
PROJECT DETAIL REPORT SEP Project I
- Page 268 and 269:
PROJECT DETAIL REPORT SEP Project I
- Page 270 and 271:
PROJECT DETAIL REPORT SEP Project I
- Page 272 and 273:
PROJECT DETAIL REPORT SEP Project I
- Page 274 and 275:
PROJECT DETAIL REPORT SEP Project I
- Page 276 and 277:
PROJECT DETAIL REPORT SEP Project I
- Page 278 and 279:
PROJECT DETAIL REPORT SEP Project I
- Page 280 and 281:
PROJECT DETAIL REPORT SEP Project I
- Page 282 and 283:
PROJECT DETAIL REPORT SEP Project I
- Page 284 and 285:
PROJECT DETAIL REPORT SEP Project I
- Page 286 and 287:
PROJECT DETAIL REPORT SEP Project I
- Page 288 and 289:
PROJECT DETAIL REPORT SEP Project I
- Page 290 and 291:
PROJECT DETAIL REPORT SEP Project I
- Page 292 and 293:
PROJECT DETAIL REPORT SEP Project I
- Page 294 and 295:
PROJECT DETAIL REPORT SEP Project I
- Page 296 and 297:
PROJECT DETAIL REPORT SEP Project I
- Page 298 and 299:
PROJECT DETAIL REPORT SEP Project I
- Page 300 and 301:
PROJECT DETAIL REPORT SEP Project I
- Page 302 and 303:
PROJECT DETAIL REPORT SEP Project I
- Page 304 and 305:
PROJECT DETAIL REPORT SEP Project I
- Page 306 and 307:
PROJECT DETAIL REPORT SEP Project I
- Page 308 and 309:
PROJECT DETAIL REPORT SEP Project I
- Page 310 and 311:
PROJECT DETAIL REPORT SEP Project I
- Page 312 and 313:
PROJECT DETAIL REPORT SEP Project I
- Page 314 and 315:
PROJECT DETAIL REPORT SEP Project I
- Page 316 and 317:
PROJECT DETAIL REPORT SEP Project I
- Page 318 and 319:
PROJECT DETAIL REPORT SEP Project I
- Page 320 and 321:
PROJECT DETAIL REPORT SEP Project I
- Page 322 and 323:
PROJECT DETAIL REPORT SEP Project I
- Page 324 and 325:
PROJECT DETAIL REPORT SEP Project I
- Page 326 and 327:
PROJECT DETAIL REPORT SEP Project I
- Page 328 and 329:
PROJECT DETAIL REPORT SEP Project I
- Page 330 and 331:
PROJECT DETAIL REPORT SEP Project I
- Page 332 and 333:
PROJECT DETAIL REPORT SEP Project I
- Page 334 and 335:
PROJECT DETAIL REPORT SEP Project I
- Page 336 and 337:
PROJECT DETAIL REPORT SEP Project I
- Page 338 and 339:
PROJECT DETAIL REPORT SEP Project I
- Page 340 and 341:
PROJECT DETAIL REPORT SEP Project I
- Page 342 and 343:
PROJECT DETAIL REPORT SEP Project I
- Page 344 and 345:
PROJECT DETAIL REPORT SEP Project I
- Page 346 and 347:
PROJECT DETAIL REPORT SEP Project I
- Page 348 and 349:
PROJECT DETAIL REPORT SEP Project I
- Page 350 and 351:
PROJECT DETAIL REPORT SEP Project I
- Page 352 and 353:
PROJECT DETAIL REPORT SEP Project I
- Page 354 and 355:
PROJECT DETAIL REPORT SEP Project I
- Page 356 and 357:
PROJECT DETAIL REPORT SEP Project I
- Page 358 and 359:
PROJECT DETAIL REPORT SEP Project I
- Page 360 and 361:
PROJECT DETAIL REPORT SEP Project I
- Page 362 and 363:
PROJECT DETAIL REPORT SEP Project I
- Page 364 and 365:
PROJECT DETAIL REPORT SEP Project I
- Page 366 and 367: PROJECT DETAIL REPORT SEP Project I
- Page 368 and 369: PROJECT DETAIL REPORT SEP Project I
- Page 370 and 371: PROJECT DETAIL REPORT SEP Project I
- Page 372 and 373: PROJECT DETAIL REPORT SEP Project I
- Page 374 and 375: PROJECT DETAIL REPORT SEP Project I
- Page 376 and 377: PROJECT DETAIL REPORT SEP Project I
- Page 378 and 379: PROJECT DETAIL REPORT SEP Project I
- Page 380 and 381: PROJECT DETAIL REPORT SEP Project I
- Page 382 and 383: PROJECT DETAIL REPORT SEP Project I
- Page 384 and 385: PROJECT DETAIL REPORT SEP Project I
- Page 386 and 387: PROJECT DETAIL REPORT SEP Project I
- Page 388 and 389: PROJECT DETAIL REPORT SEP Project I
- Page 390 and 391: PROJECT DETAIL REPORT SEP Project I
- Page 392 and 393: PROJECT DETAIL REPORT SEP Project I
- Page 394 and 395: PROJECT DETAIL REPORT SEP Project I
- Page 396 and 397: PROJECT DETAIL REPORT SEP Project I
- Page 398 and 399: PROJECT DETAIL REPORT SEP Project I
- Page 400 and 401: PROJECT DETAIL REPORT SEP Project I
- Page 402 and 403: PROJECT DETAIL REPORT SEP Project I
- Page 404 and 405: PROJECT DETAIL REPORT SEP Project I
- Page 406 and 407: PROJECT DETAIL REPORT SEP Project I
- Page 408 and 409: PROJECT DETAIL REPORT SEP Project I
- Page 410 and 411: PROJECT DETAIL REPORT SEP Project I
- Page 413 and 414: 11. PROJECT LISTS & SUMMARY OF PROJ
- Page 415: Table 11.1: SEP Projects by Funding
- Page 419 and 420: Table 11.1: SEP Projects by Funding
- Page 421: Table 11.1: SEP Projects by Funding
- Page 424 and 425: educing growth adjusted electricity
- Page 426 and 427: step within the Strategic Energy Pl
- Page 429: Appendix A Field Data Forms (Electr
- Page 433: Appendix C Other Calculations and D