PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: Retrofit kitchen fixtures from F40T12 lamps with magnetic ballasts to<br />

F32T8 (28-watt) lamps with RLO electronic ballasts<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: FACULTY CTR<br />

Building Key: 04C4261<br />

Basic Gross Area (sf): 30,573<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D3194<br />

<strong>UC</strong>LA Faculty <strong>Center</strong> SEP Custom Calc.NAM.xls<br />

Project Description Reference(s): Lighting Project 1. Interior Linear Fluorescent Lighting.<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

7,425<br />

Equipment Description Qty<br />

2.0<br />

0<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

7,425<br />

0<br />

$1,782<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

Extended Bare<br />

Labor Cost ($)<br />

2L 2F32T8 (28-watt) retrofit 50 $17.80 $912 $25.00 $1,401<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$912 $1,401<br />

$75<br />

$119<br />

$1,106<br />

$111<br />

$441<br />

$147<br />

$177<br />

N/A<br />

$168<br />

$1,569<br />

$157<br />

Totals: $1,217 $1,726<br />

Total Project Cost: $3,708<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $3,708<br />

Rebate/Incentive*:<br />

$1,782<br />

Net Project Cost: $1,926<br />

Net Simple Payback Period (yrs): 2.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

7,425<br />

0<br />

$653<br />

Backup