<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1011 AHU 1 VIV to VAV & SP Reset<br />

D1012 AHU 2 Vivarium Aircuity<br />

D1013 Lab CAV to VAV with Aircuity<br />

D3035 Monitoring Based Commissioning<br />

MACDONALDLAB<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4348<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1991<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

9,792 -2.0 2 0 2,157 $1,009<br />

124,761 14.0 584 0 35,066 $16,408<br />

1,477,065 154.0 9,274 0 388,927 $205,550<br />

273,315 31.0 0 29,356 0 $40,172<br />

Basic Gross Area (sf): 144,611<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$46,015 $2,789 $43,226 42.8<br />

Committed Tier:<br />

Backup<br />

$495,153 $43,975 $451,178 27.5<br />

Committed Tier:<br />

Backup<br />

$4,023,619 $545,095 $3,478,524 16.9<br />

Committed Tier:<br />

Backup<br />

$244,525 $94,952 $149,573 3.7<br />

Totals 1,884,933 197.0 9,860 29,356 426,150 $263,138 $4,809,311 $686,811 $4,122,501 15.7<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,660,800 171,300 25.3 1.2<br />

377.7<br />

3,660,800 171,300 25.3 1.2<br />

377.7<br />

1,434,947 18,694 9.9 0.1<br />

114.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

69.7%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!