24.07.2013 Views

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1054 S-1, 5, 9, 10 to 12<br />

D1055 S-1(Geophysics)<br />

D1056 Aircuity<br />

D3008 Monitoring Based Commissioning<br />

GEOLOGY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4228A<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1952<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

181,337 5.0 2,026 0 80,248 $32,167<br />

71,548 2.0 1,817 0 54,628 $19,735<br />

7,207 1.0 0 0 0 $634<br />

344,262 39.0 0 36,976 0 $50,599<br />

Basic Gross Area (sf): 182,149<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$176,117 $84,253 $91,864 2.9<br />

Committed Tier:<br />

Backup<br />

$45,741 $50,373 $9,148 0.5<br />

Committed Tier:<br />

Backup<br />

$48,656 $1,730 $46,926 74.0<br />

Committed Tier:<br />

Backup<br />

$307,998 $119,599 $188,399 3.7<br />

Totals 604,354 47.0 3,843 36,976 134,876 $103,136 $578,512 $255,955 $336,337 3.3<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

4,611,100 215,800 25.3 1.2<br />

377.7<br />

4,611,100 215,800 25.3 1.2<br />

377.7<br />

3,898,845 130,787 21.4 0.7<br />

291.0<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

23.0%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!