<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1017 S-1 CAV to VAV<br />

D1018 AH 1 to 4, 17 & 37 CAV to VAV with DCV<br />

D1019 AH-19 CAV to VAV<br />

D1020 AH 18, 38 & 39 CAV to VAV<br />

D1021 AH 20 CAV to VAV<br />

D3024 Monitoring Based Commissioning<br />

POWELL LIB<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4318A<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1930<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

7,870 1.0 143 0 7,191 $1,933<br />

44,410 10.0 -23 0 4,351 $4,057<br />

79,947 7.0 532 0 38,959 $12,425<br />

23,523 5.0 -3 0 2,409 $2,206<br />

45,021 4.0 396 0 32,750 $8,211<br />

128,471 15.0 0 17,519 0 $20,925<br />

Basic Gross Area (sf): 166,846<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$36,901 $5,057 $31,844 16.5<br />

Committed Tier:<br />

Backup<br />

$48,385 $11,206 $37,179 9.2<br />

Committed Tier:<br />

Backup<br />

$46,563 $33,317 $13,246 1.1<br />

Committed Tier:<br />

Backup<br />

$19,798 $6,071 $13,727 6.2<br />

Committed Tier:<br />

Backup<br />

$44,343 $22,043 $22,300 2.7<br />

Committed Tier:<br />

Backup<br />

$141,062 $48,352 $92,710 4.4<br />

Totals 329,242 42.0 1,045 17,519 85,660 $49,759 $337,051 $126,046 $211,006 4.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,111,900 98,800 12.7 0.6<br />

188.8<br />

2,111,900 98,800 12.7 0.6<br />

188.8<br />

1,714,130 68,219 10.3 0.4<br />

146.1<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

22.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th