City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$320,082 $140,339<br />

$26,407<br />

$41,579<br />

$388,067<br />

$38,807<br />

$89,966<br />

$29,989<br />

$35,986<br />

N/A<br />

$16,841<br />

$157,180<br />

$15,718<br />

Totals: $426,874 $172,898<br />

Total Project Cost: $755,712<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $755,712<br />

Rebate/Incentive*:<br />

$293,908<br />

Net Project Cost: $461,804<br />

Net Simple Payback Period (yrs): 4.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

1,176,481<br />

0<br />

$103,530<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.