5. UTILITIES<br />

5.1 Providers & Tariffs<br />

In the baseline 2006-07 Fiscal Year, electricity at <strong>UC</strong>LA main campus was provided <strong>Los</strong><br />

<strong>Angeles</strong> Department of Water and Power, and by the cogeneration plant. The Santa Monica<br />

hospital is served by Southern California Edison (SCE), for both commodity and transmission<br />

and distribution.<br />

The campus purchases natural gas with the majority of the commodity for the cogeneration from<br />

the Department of General Services, and Southern California Gas (SCG) provides the<br />

transportation service. Approximately 8% of its natural gas is landfill gas provided by nearby<br />

Mountain Gate Landfill. SCG provides the natural gas for the remaining campus use, other than<br />

cogeneration.<br />

5.2 Procurement Options<br />

There are limited procurement options for the campus, but the campus is taking advantage of<br />

opportunities and should continue to explore other avenues if and when available.<br />

For electricity, current regulations do not allow for direct access, so electricity in excess of the<br />

campus’ self generating capacity is likely to remain with LADWP for the foreseeable future. For<br />

natural gas, the campus is already exercising its option to purchase gas commodity on the DGS<br />

rate schedule.<br />

2413.01/Reports/<strong>UC</strong> SEP Draft Report – <strong>UC</strong>LA.doc 5-1 December 31, 2008<br />