Table 11.1: SEP Projects by Funding Source and Project Type Net Simple Payback (yrs) Net Project Cost ($) Gross Estimated Utility Incentive ($) Estimated Project Cost ($) Total Cost Savings ($/yr) Total Purchased Gas Savings (th/yr) Demand Savings (kW) Total Purchased Electricity Savings (kWh/yr) Building Key Building Name Project Name SEP Project ID State Funded Buildings MBCx Projects D3124 04C4200 MURPHY HALL Monitoring Based Commissioning 313,814 19.0 - $ 27,616 $ 186,161 $ 63,811 $ 122,350 4.4 D3003 04C4202 PERLOFF HALL Monitoring Based Commissioning 93,931 6.0 - $ 8,266 $ 55,723 $ 19,100 $ 36,623 4.4 D3004 04C4203 YOUNG LIBRY Monitoring Based Commissioning 435,993 27.0 - $ 38,367 $ 258,643 $ 88,655 $ 169,988 4.4 D3128 04C4227 SLICHTER Monitoring Based Commissioning 89,153 6.0 - $ 7,845 $ 52,890 $ 18,129 $ 34,761 4.4 D3008 04C4228A GEOLOGY Monitoring Based Commissioning 574,992 39.0 - $ 50,599 $ 307,998 $ 119,599 $ 188,399 3.7 D3131 04C4228B YOUNG HALL Monitoring Based Commissioning 939,408 64.0 - $ 82,668 $ 503,200 $ 195,397 $ 307,803 3.7 D3009 04C4228C MOLECULR SCI Monitoring Based Commissioning 563,998 38.0 - $ 49,632 $ 302,109 $ 117,312 $ 184,797 3.7 D3011 04C4235 WOODEN/PS4 Monitoring Based Commissioning 296,046 18.0 - $ 26,052 $ 175,619 $ 60,198 $ 115,421 4.4 D3013 04C4256A ENGR BLDG 4 Monitoring Based Commissioning 928,466 64.0 - $ 81,705 $ 497,340 $ 193,122 $ 304,218 3.7 D3014 04C4260 FACMGMT BLDG Monitoring Based Commissioning 269,646 17.0 - $ 23,729 $ 159,960 $ 54,830 $ 105,130 4.4 D3022 04C4315 GONDA CENTER Monitoring Based Commissioning 395,228 27.0 - $ 34,780 $ 211,707 $ 82,208 $ 129,499 3.7 D3023 04C4317 LAW Monitoring Based Commissioning 392,555 24.0 - $ 34,545 $ 232,872 $ 79,822 $ 153,050 4.4 D3024 04C4318A POWELL LIB Monitoring Based Commissioning 237,790 15.0 - $ 20,925 $ 141,062 $ 48,352 $ 92,710 4.4 D3143 04C4319 FRANZ HALL Monitoring Based Commissioning 751,470 51.0 - $ 66,129 $ 402,529 $ 156,306 $ 246,223 3.7 D3025 04C4320 LIFE SCIENCE Monitoring Based Commissioning 677,471 46.0 - $ 59,617 $ 362,894 $ 140,915 $ 221,979 3.7 D3026 04C4325 DORIS STEIN Monitoring Based Commissioning 297,709 20.0 - $ 26,198 $ 159,469 $ 61,924 $ 97,545 3.7 D3147 04C4329 REED RESRCH Monitoring Based Commissioning 218,371 15.0 - $ 19,217 $ 116,971 $ 45,421 $ 71,550 3.7 D3027 04C4331 PUBLIC HLTH HLTH Monitoring Based Based Commissioning Commissioning 443 443,716 716 30 30.0 0 - $ 39 39,047 047 $ 237 237,681 681 $ 92 92,293 293 $ 145 145,388 388 37 3.7 D3150 04C4332B BRAIN RSCH Monitoring Based Commissioning 273,300 19.0 - $ 24,050 $ 146,396 $ 56,847 $ 89,549 3.7 D3028 04C4332E M DAVIES CC Monitoring Based Commissioning 221,688 15.0 - $ 19,509 $ 118,751 $ 46,111 $ 72,640 3.7 D3030 04C4333 JULES STEIN Monitoring Based Commissioning 277,493 19.0 - $ 24,419 $ 148,640 $ 57,719 $ 90,921 3.7 D3154 04C4334 DENTISTRY Monitoring Based Commissioning 645,136 44.0 - $ 56,772 $ 345,573 $ 134,189 $ 211,384 3.7 D3156 04C4335 SCHOENBERG Monitoring Based Commissioning 174,661 11.0 - $ 15,370 $ 103,613 $ 35,516 $ 68,097 4.4 D3158 04C4336 FACTOR Monitoring Based Commissioning 630,893 43.0 - $ 55,519 $ 337,941 $ 131,226 $ 206,715 3.7 D3032 04C4343 BOELTER HALL Monitoring Based Commissioning 1,180,314 81.0 - $ 103,868 $ 632,242 $ 245,506 $ 386,736 3.7 D3033 04C4344 MORTON MED Monitoring Based Commissioning 1,157,990 79.0 - $ 101,903 $ 620,286 $ 240,863 $ 379,423 3.7 D3034 04C4345 MED PLZA 300 Monitoring Based Commissioning 319,127 22.0 - $ 28,083 $ 170,944 $ 66,379 $ 104,565 3.7 D3035 04C4348 MACDONALDLAB Monitoring Based Commissioning 456,496 31.0 - $ 40,172 $ 244,525 $ 94,952 $ 149,573 3.7 D3164 04C4359 MATH SCIENCE Monitoring Based Commissioning 707,352 48.0 - $ 62,247 $ 378,898 $ 147,130 $ 231,768 3.7 D3168 04C4363 KNUDSEN HALL Monitoring Based Commissioning 519,921 36.0 - $ 45,753 $ 278,497 $ 108,144 $ 170,353 3.7 D3038 04C4374 FOWLER MUSM Monitoring Based Commissioning 321,970 22.0 - $ 28,333 $ 172,464 $ 66,970 $ 105,494 3.7 D3039 04C4375 ROYCE HALL Monitoring Based Commissioning 263,198 16.0 - $ 23,161 $ 156,134 $ 53,519 $ 102,615 4.4 D3172 04C4403 BOYER HALL Monitoring Based Commissioning 419,979 29.0 - $ 36,958 $ 224,963 $ 87,356 $ 137,607 3.7 D3040 04C4415 UNEX Monitoring Based Commissioning 135,488 8.0 - $ 11,923 $ 80,373 $ 27,550 $ 52,823 4.4 SOUTHERN REGIONAL D3042 04C4562 LIBRARY FACILITY Monitoring Based Commissioning 325,381 20.0 - $ 28,634 $ 193,024 $ 66,163 $ 126,861 4.4 D3176 04C4577A MELNITZ HALL Monitoring Based Commissioning 88,117 5.0 - $ 7,754 $ 52,273 $ 17,918 $ 34,355 4.4 D3178 04C4578 MACGOWAN Monitoring Based Commissioning 184,623 11.0 - $ 16,247 $ 109,522 $ 37,541 $ 71,981 4.4 D3180 04C4579 PUBLIC AFFAIRS Monitoring Based Commissioning 287,416 18.0 - $ 25,293 $ 170,502 $ 58,443 $ 112,059 4.4 D3043 04C4580 BUNCHE HALL Monitoring Based Commissioning 326,724 20.0 - $ 28,752 $ 193,820 $ 66,436 $ 127,384 4.4 D3183 04C4581 WARREN HALL Monitoring Based Commissioning 322,635 22.0 - $ 28,392 $ 172,822 $ 67,108 $ 105,714 3.7 D3185 04C4594 REHAB CENTER Monitoring Based Commissioning 450,042 31.0 - $ 39,604 $ 241,068 $ 93,609 $ 147,459 3.7 D3045 04C515A COLLINS CTR Monitoring Based Commissioning 44,626 3.0 - $ 3,927 $ 26,473 $ 9,074 $ 17,399 4.4 D3046 04C515B GOLD HALL Monitoring Based Commissioning 78,876 5.0 - $ 6,941 $ 46,791 $ 16,039 $ 30,752 4.4 D3047 04C515C ENTREP HALL Monitoring Based Commissioning 103,456 6.0 - $ 9,104 $ 61,372 $ 21,037 $ 40,335 4.4 D3048 04C515D CORNELL HALL Monitoring Based Commissioning 102,237 6.0 - $ 8,997 $ 60,651 $ 20,789 $ 39,862 4.4 D3049 04C515E ROSNFLD LIBR Monitoring Based Commissioning 72,751 4.0 - $ 6,402 $ 43,159 $ 14,793 $ 28,366 4.4 D3050 04C515F MULLIN CMNS Monitoring Based Commissioning 48,393 3.0 - $ 4,259 $ 28,708 $ 9,840 $ 18,868 4.4 D3084 04CWIDE CAMPUSWIDE MBCx Central <strong>Plan</strong>t 1,124,400 86.0 - $ 98,947 $ 693,000 $ 240,000 $ 453,000 4.6 Subtotal, State Funded, MBCx Projects 19,184,439 1,289.0 - $ 1,688,231 $ 10,618,251 $ 3,976,161 $ 6,642,090 3.9
Table 11.1: SEP Projects by Funding Source and Project Type (Continued) Net Simple Payback (yrs) Net Project Cost ($) Gross Estimated Utility Incentive ($) Estimated Project Cost ($) Total Cost Savings ($/yr) Total Purchased Gas Savings (th/yr) Demand Savings (kW) Total Purchased Electricity Savings (kWh/yr) SEP Project Building ID Key Building Name Project Name New Construction Projects $ 42,141 $ 442,353 $ 100,842 $ 341,511 8.1 - 34.0 D3005 04C4203 YOUNG LIBRY SBD, New/Renov - Young Research Library Renovation 478,877 $ 109,358 $ 1,147,921 $ 261,688 $ 886,233 8.1 $ 10,360 $ 108,750 $ 24,792 $ 83,958 8.1 $ 170,545 $ 2,034,322 $ 408,105 $ 1,626,217 9.5 $ 76,198 $ 777,227 $ 191,988 $ 585,239 7.7 $ 8,637 $ 90,665 $ 20,668 $ 69,997 8.1 $ 9,194 $ 93,780 $ 23,165 $ 70,615 7.7 - - - - - - 90.0 8.0 140.0 76.0 7.0 9.0 $ 43,693 $ 445,671 $ 110,088 $ 335,583 7.7 - 44.0 $ 48,758 $ 511,810 $ 116,676 $ 395,134 8.1 - 40.0 D3006 04C4204 PAULEY SBD, New/Renov - Pauley Pavilion Renovation and Expansion 1,242,705 D3010 04C4230 POLICE STN SBD, New/Renov - Police Station Replacement Building 117,733 D3029 04C4332F SEMEL INST SBD, New/Renov - CHS South Tower Seismic Renovation 1,938,015 D3031 04C4333 JULES STEIN SBD, New/Renov - Jules Stein Eye Institute Seismic Repair 865,891 D3041 04C4451 CLARK LIB SBD, New/Renov - Clark Library Seismic Correction 98,149 D3051 04CTBD1 CNSI - BSL 3 LABORATORY SBD, New/Renov - CNSI-BSL3 Laboratory 104,475 TELEMEDICINE AND PRIME D3055 04CTBD5 FACILITIES SBD, New/Renov - Telemedicine and Prime Facilities Phase 2 496,511 LETTERS AND SCIENCE D3056 04CTBD6 EXPANSION SBD, New/Renov - Letters and Science Expansion 554,072 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 - 3.0 D3083 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 - 3.0 D3082 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 - 3.0 D3081 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 - 3.0 D3080 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 - 3.0 D3079 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 - 3.0 D3078 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 - 3.0 D3077 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 41,243 $ 9,401 $ 31,842 8.1 $ 550,316 $ 5,982,444 $ 1,333,220 $ 4,649,224 8.4 - - 3.0 472.0 D3076 04CWIDE CAMPUSWIDE SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 Subtotal, State Funded, New Construction Projects 6,253,593 $ 14,073 $ 113,025 $ 38,180 $ 74,845 5.3 $ 20,070 $ 231,886 $ 56,783 $ 175,103 8.7 $ 8,912 $ 33,239 $ 24,071 $ 9,168 1.0 $ 82,063 $ 260,501 $ 216,698 $ 52,100 0.6 $ 32,145 $ 61,824 $ 82,093 $ 12,365 0.4 $ 29,627 $ 150,701 $ 77,005 $ 73,696 2.5 $ 634 $ 48,656 $ 1,730 $ 46,926 74.0 $ 19,735 $ 45,741 $ 50,373 $ 9,148 0.5 $ 32,167 $ 176,117 $ 84,253 $ 91,864 2.9 $ 44,443 $ 226,051 $ 115,513 $ 110,538 2.5 $ 313,196 $ 1,155,824 $ 822,292 $ 333,532 1.1 $ 1,111 $ 35,195 $ 3,027 $ 32,168 28.9 $ 17,134 $ 62,008 $ 47,476 $ 14,532 0.8 $ 4,359 $ 2,784 $ 11,303 $ 557 0.1 $ 3,847 $ 2,784 $ 10,012 $ 557 0.1 $ 5,922 $ 47,848 $ 15,355 $ 32,493 5.5 $ 20,419 $ 125,784 $ 56,290 $ 69,494 3.4 $ 9,066 $ 65,921 $ 24,120 $ 41,801 4.6 $ 3,667 $ 36,733 $ 9,748 $ 26,985 7.4 $ 9,208 $ 32,243 $ 23,860 $ 8,383 0.9 $ 103,530 $ 755,712 $ 293,908 $ 461,804 4.5 $ 49,169 $ 1,551,693 $ 129,310 $ 1,422,383 28.9 $ 51,915 $ 126,983 $ 136,824 $ 25,397 0.5 $ 8,811 $ 46,233 $ 22,944 $ 23,289 2.6 - - - - - - - - - - - - 2.0 4.0 2.0 63.0 1.0 4.0 1.0 2.0 5.0 6.0 68.0 - 50.0 - - - 57.0 1.0 - 4.0 143.0 22.0 3.0 - HVAC Projects D3225 04C4200 MURPHY HALL Dual Duct Conversion to VAV (Cogent Report) 159,915 D1051 04C4202 PERLOFF HALL CAV to VAV - AHU 1, 2, 5W and 5E & Add Economizer 228,070 D1050 04C4203 YOUNG LIBRY SAF 9 CAV to VAV 101,270 D1049 04C4203 YOUNG LIBRY SAF-3 to 8 CAV to VAV 932,532 D1048 04C4203 YOUNG LIBRY SAF-1 & 2 SP Reset 365,279 D3235 04C4227 SLICHTER Dual Duct Conversion to VAV (Cogent Report) 336,668 D1056 04C4228A GEOLOGY Aircuity 7,207 D1055 04C4228A GEOLOGY S-1(Geophysics) 224,261 D1054 04C4228A GEOLOGY S-1, 5, 9, 10 to 12 365,538 D3237 04C4228B YOUNG HALL Dual Duct Conversion to VAV (Cogent Report) 505,033 D1016 04C4228C MOLECULR SCI AHU 1, 2, 3, 4 & 6 Aircuity 3,559,048 D1015 04C4228C MOLECULR SCI AHU - 5 VIV to VAV & SP Reset 12,629 D1034 04C4235 WOODEN/PS4 AHU 4 CAV to VAV & DCV 194,701 D1033 04C4235 WOODEN/PS4 AHU 2 Pace) SP reset 49,533 D1032 04C4235 WOODEN/PS4 AHU 1 Pace) SP reset 43,721 D1031 04C4235 WOODEN/PS4 AHU 1 (Mcquay) SP reset 67,300 D1030 04C4235 WOODEN/PS4 CAV to VAV 232,032 D1029 04C4235 WOODEN/PS4 AHU 3 VIV to VAV & SP Reset 103,025 D1028 04C4235 WOODEN/PS4 AHU 1 VIV to VAV 41,673 D1065 04C4256A ENGR BLDG 4 ACS 9 - CAV to VAV 104,641 D1064 04C4256A ENGR BLDG 4 CF - 1 to 22 - VIV to VAV 1,176,481 D1063 04C4256A ENGR BLDG 4 ACS 8 (AHU-3) - Aircruity 558,742 D1062 04C4256A ENGR BLDG 4 ACS - 1 to 5 - SP Reset 589,949 D1002 04C4260 FACMGMT BLDG AHU 1 & 2 - SP Reset 100,125 (0) - - - (0) - - - - - - -
- Page 1:
UC STRATEGIC ENERGY PLAN University
- Page 4 and 5:
TABLE OF CONTENTS (CONTINUED) 12. E
- Page 7 and 8:
1. EXECUTIVE SUMMARY 1.1 Policy on
- Page 9 and 10:
Table 1.1: Summary of Baseline and
- Page 11:
The campus has reviewed a prelimina
- Page 14 and 15:
Construction costs of recommended p
- Page 16 and 17:
Campus Los Angeles Santa Monica Hos
- Page 18 and 19:
2.3 Campus Overview University of C
- Page 20 and 21:
Table 2.4: SEP Buildings (Continued
- Page 23:
3. HISTORICAL CAMPUS ENERGY USE 3.1
- Page 26 and 27:
4.2 Individual Building Metering Bu
- Page 28 and 29:
of UCSD buildings is shown in Figur
- Page 31:
5. UTILITIES 5.1 Providers & Tariff
- Page 35 and 36:
7. RENEWABLE ENERGY GENERATION 7.1
- Page 37 and 38:
8. RECOMMENDED ENERGY EFFICIENCY PR
- Page 39 and 40:
One campus, UC Santa Barbara, has c
- Page 41 and 42:
The controllers themselves are prog
- Page 43 and 44:
8.2.3 Air Handler Project 3. Demand
- Page 45 and 46:
standard control sequence. Temperat
- Page 47 and 48:
8.2.11 Laboratory Air Handler Proje
- Page 49 and 50:
The projected MBCx energy savings f
- Page 51 and 52:
The budget that each campus has to
- Page 53 and 54:
8.7 Other Projects 8.7.1 Swimming P
- Page 55 and 56:
8.8.3 UCLA Custom Project 3. TOD Co
- Page 57:
9. BUILDING OVERVIEW & PROJECTS The
- Page 60 and 61:
Strategic Energy Plan Projects SEP
- Page 62 and 63:
Strategic Energy Plan Projects SEP
- Page 64 and 65:
Strategic Energy Plan Projects SEP
- Page 66 and 67:
2006-2008 Partnership Projects Stra
- Page 68 and 69:
Strategic Energy Plan Projects SEP
- Page 70 and 71:
Strategic Energy Plan Projects SEP
- Page 72 and 73:
Strategic Energy Plan Projects SEP
- Page 74 and 75:
Strategic Energy Plan Projects SEP
- Page 76 and 77:
Strategic Energy Plan Projects SEP
- Page 78 and 79:
Strategic Energy Plan Projects SEP
- Page 80 and 81:
Strategic Energy Plan Projects SEP
- Page 82 and 83:
Strategic Energy Plan Projects SEP
- Page 84 and 85:
Strategic Energy Plan Projects SEP
- Page 86 and 87:
Strategic Energy Plan Projects SEP
- Page 88 and 89:
Strategic Energy Plan Projects SEP
- Page 90 and 91:
Strategic Energy Plan Projects SEP
- Page 92 and 93:
Strategic Energy Plan Projects SEP
- Page 94 and 95:
Strategic Energy Plan Projects SEP
- Page 96 and 97:
Strategic Energy Plan Projects SEP
- Page 98 and 99:
Strategic Energy Plan Projects SEP
- Page 100 and 101:
Strategic Energy Plan Projects SEP
- Page 102 and 103:
Strategic Energy Plan Projects SEP
- Page 104 and 105:
Strategic Energy Plan Projects SEP
- Page 106 and 107:
Strategic Energy Plan Projects SEP
- Page 108 and 109:
Strategic Energy Plan Projects SEP
- Page 110 and 111:
Strategic Energy Plan Projects SEP
- Page 112 and 113:
Strategic Energy Plan Projects SEP
- Page 114 and 115:
Strategic Energy Plan Projects SEP
- Page 116 and 117:
Strategic Energy Plan Projects SEP
- Page 118 and 119:
Strategic Energy Plan Projects SEP
- Page 120 and 121:
Strategic Energy Plan Projects SEP
- Page 122 and 123:
Strategic Energy Plan Projects SEP
- Page 124 and 125:
Strategic Energy Plan Projects SEP
- Page 126 and 127:
Strategic Energy Plan Projects SEP
- Page 128 and 129:
Strategic Energy Plan Projects SEP
- Page 130 and 131:
Strategic Energy Plan Projects SEP
- Page 132 and 133:
Strategic Energy Plan Projects SEP
- Page 135 and 136:
PROJECT DETAIL REPORT SEP Project I
- Page 137 and 138:
PROJECT DETAIL REPORT SEP Project I
- Page 139:
PROJECT DETAIL REPORT SEP Project I
- Page 142 and 143:
City: Los Angeles City Index Materi
- Page 144 and 145:
PROJECT DETAIL REPORT SEP Project I
- Page 147 and 148:
PROJECT DETAIL REPORT SEP Project I
- Page 149 and 150:
PROJECT DETAIL REPORT SEP Project I
- Page 151 and 152:
PROJECT DETAIL REPORT SEP Project I
- Page 153 and 154:
City: Los Angeles City Index Materi
- Page 155 and 156:
PROJECT DETAIL REPORT SEP Project I
- Page 157 and 158:
PROJECT DETAIL REPORT SEP Project I
- Page 159 and 160:
PROJECT DETAIL REPORT SEP Project I
- Page 161 and 162:
PROJECT DETAIL REPORT SEP Project I
- Page 163 and 164:
PROJECT DETAIL REPORT SEP Project I
- Page 165 and 166:
PROJECT DETAIL REPORT SEP Project I
- Page 167 and 168:
PROJECT DETAIL REPORT SEP Project I
- Page 169 and 170:
PROJECT DETAIL REPORT SEP Project I
- Page 171 and 172:
PROJECT DETAIL REPORT SEP Project I
- Page 173 and 174:
PROJECT DETAIL REPORT SEP Project I
- Page 175 and 176:
PROJECT DETAIL REPORT SEP Project I
- Page 177 and 178:
PROJECT DETAIL REPORT SEP Project I
- Page 179 and 180:
PROJECT DETAIL REPORT SEP Project I
- Page 181 and 182:
PROJECT DETAIL REPORT SEP Project I
- Page 183 and 184:
PROJECT DETAIL REPORT SEP Project I
- Page 185 and 186:
PROJECT DETAIL REPORT SEP Project I
- Page 187 and 188:
PROJECT DETAIL REPORT SEP Project I
- Page 189 and 190:
PROJECT DETAIL REPORT SEP Project I
- Page 191 and 192:
PROJECT DETAIL REPORT SEP Project I
- Page 193 and 194:
PROJECT DETAIL REPORT SEP Project I
- Page 195 and 196:
PROJECT DETAIL REPORT SEP Project I
- Page 197 and 198:
PROJECT DETAIL REPORT SEP Project I
- Page 199 and 200:
PROJECT DETAIL REPORT SEP Project I
- Page 201 and 202:
PROJECT DETAIL REPORT SEP Project I
- Page 203:
PROJECT DETAIL REPORT SEP Project I
- Page 206 and 207:
City: Los Angeles City Index Materi
- Page 208 and 209:
PROJECT DETAIL REPORT SEP Project I
- Page 210 and 211:
PROJECT DETAIL REPORT SEP Project I
- Page 212 and 213:
PROJECT DETAIL REPORT SEP Project I
- Page 214 and 215:
PROJECT DETAIL REPORT SEP Project I
- Page 216 and 217:
PROJECT DETAIL REPORT SEP Project I
- Page 218 and 219:
PROJECT DETAIL REPORT SEP Project I
- Page 220 and 221:
PROJECT DETAIL REPORT SEP Project I
- Page 222 and 223:
PROJECT DETAIL REPORT SEP Project I
- Page 224 and 225:
PROJECT DETAIL REPORT SEP Project I
- Page 226 and 227:
PROJECT DETAIL REPORT SEP Project I
- Page 228 and 229:
PROJECT DETAIL REPORT SEP Project I
- Page 230 and 231:
PROJECT DETAIL REPORT SEP Project I
- Page 232 and 233:
PROJECT DETAIL REPORT SEP Project I
- Page 234 and 235:
PROJECT DETAIL REPORT SEP Project I
- Page 236 and 237:
PROJECT DETAIL REPORT SEP Project I
- Page 238 and 239:
PROJECT DETAIL REPORT SEP Project I
- Page 240 and 241:
PROJECT DETAIL REPORT SEP Project I
- Page 242 and 243:
PROJECT DETAIL REPORT SEP Project I
- Page 244 and 245:
PROJECT DETAIL REPORT SEP Project I
- Page 246 and 247:
PROJECT DETAIL REPORT SEP Project I
- Page 248 and 249:
PROJECT DETAIL REPORT SEP Project I
- Page 250 and 251:
PROJECT DETAIL REPORT SEP Project I
- Page 252 and 253:
PROJECT DETAIL REPORT SEP Project I
- Page 254 and 255:
PROJECT DETAIL REPORT SEP Project I
- Page 256 and 257:
PROJECT DETAIL REPORT SEP Project I
- Page 258 and 259:
PROJECT DETAIL REPORT SEP Project I
- Page 260 and 261:
PROJECT DETAIL REPORT SEP Project I
- Page 262 and 263:
PROJECT DETAIL REPORT SEP Project I
- Page 264 and 265:
PROJECT DETAIL REPORT SEP Project I
- Page 266 and 267:
PROJECT DETAIL REPORT SEP Project I
- Page 268 and 269:
PROJECT DETAIL REPORT SEP Project I
- Page 270 and 271:
PROJECT DETAIL REPORT SEP Project I
- Page 272 and 273:
PROJECT DETAIL REPORT SEP Project I
- Page 274 and 275:
PROJECT DETAIL REPORT SEP Project I
- Page 276 and 277:
PROJECT DETAIL REPORT SEP Project I
- Page 278 and 279:
PROJECT DETAIL REPORT SEP Project I
- Page 280 and 281:
PROJECT DETAIL REPORT SEP Project I
- Page 282 and 283:
PROJECT DETAIL REPORT SEP Project I
- Page 284 and 285:
PROJECT DETAIL REPORT SEP Project I
- Page 286 and 287:
PROJECT DETAIL REPORT SEP Project I
- Page 288 and 289:
PROJECT DETAIL REPORT SEP Project I
- Page 290 and 291:
PROJECT DETAIL REPORT SEP Project I
- Page 292 and 293:
PROJECT DETAIL REPORT SEP Project I
- Page 294 and 295:
PROJECT DETAIL REPORT SEP Project I
- Page 296 and 297:
PROJECT DETAIL REPORT SEP Project I
- Page 298 and 299:
PROJECT DETAIL REPORT SEP Project I
- Page 300 and 301:
PROJECT DETAIL REPORT SEP Project I
- Page 302 and 303:
PROJECT DETAIL REPORT SEP Project I
- Page 304 and 305:
PROJECT DETAIL REPORT SEP Project I
- Page 306 and 307:
PROJECT DETAIL REPORT SEP Project I
- Page 308 and 309:
PROJECT DETAIL REPORT SEP Project I
- Page 310 and 311:
PROJECT DETAIL REPORT SEP Project I
- Page 312 and 313:
PROJECT DETAIL REPORT SEP Project I
- Page 314 and 315:
PROJECT DETAIL REPORT SEP Project I
- Page 316 and 317:
PROJECT DETAIL REPORT SEP Project I
- Page 318 and 319:
PROJECT DETAIL REPORT SEP Project I
- Page 320 and 321:
PROJECT DETAIL REPORT SEP Project I
- Page 322 and 323:
PROJECT DETAIL REPORT SEP Project I
- Page 324 and 325:
PROJECT DETAIL REPORT SEP Project I
- Page 326 and 327:
PROJECT DETAIL REPORT SEP Project I
- Page 328 and 329:
PROJECT DETAIL REPORT SEP Project I
- Page 330 and 331:
PROJECT DETAIL REPORT SEP Project I
- Page 332 and 333:
PROJECT DETAIL REPORT SEP Project I
- Page 334 and 335:
PROJECT DETAIL REPORT SEP Project I
- Page 336 and 337:
PROJECT DETAIL REPORT SEP Project I
- Page 338 and 339:
PROJECT DETAIL REPORT SEP Project I
- Page 340 and 341:
PROJECT DETAIL REPORT SEP Project I
- Page 342 and 343:
PROJECT DETAIL REPORT SEP Project I
- Page 344 and 345:
PROJECT DETAIL REPORT SEP Project I
- Page 346 and 347:
PROJECT DETAIL REPORT SEP Project I
- Page 348 and 349:
PROJECT DETAIL REPORT SEP Project I
- Page 350 and 351:
PROJECT DETAIL REPORT SEP Project I
- Page 352 and 353:
PROJECT DETAIL REPORT SEP Project I
- Page 354 and 355:
PROJECT DETAIL REPORT SEP Project I
- Page 356 and 357:
PROJECT DETAIL REPORT SEP Project I
- Page 358 and 359:
PROJECT DETAIL REPORT SEP Project I
- Page 360 and 361:
PROJECT DETAIL REPORT SEP Project I
- Page 362 and 363:
PROJECT DETAIL REPORT SEP Project I
- Page 364 and 365: PROJECT DETAIL REPORT SEP Project I
- Page 366 and 367: PROJECT DETAIL REPORT SEP Project I
- Page 368 and 369: PROJECT DETAIL REPORT SEP Project I
- Page 370 and 371: PROJECT DETAIL REPORT SEP Project I
- Page 372 and 373: PROJECT DETAIL REPORT SEP Project I
- Page 374 and 375: PROJECT DETAIL REPORT SEP Project I
- Page 376 and 377: PROJECT DETAIL REPORT SEP Project I
- Page 378 and 379: PROJECT DETAIL REPORT SEP Project I
- Page 380 and 381: PROJECT DETAIL REPORT SEP Project I
- Page 382 and 383: PROJECT DETAIL REPORT SEP Project I
- Page 384 and 385: PROJECT DETAIL REPORT SEP Project I
- Page 386 and 387: PROJECT DETAIL REPORT SEP Project I
- Page 388 and 389: PROJECT DETAIL REPORT SEP Project I
- Page 390 and 391: PROJECT DETAIL REPORT SEP Project I
- Page 392 and 393: PROJECT DETAIL REPORT SEP Project I
- Page 394 and 395: PROJECT DETAIL REPORT SEP Project I
- Page 396 and 397: PROJECT DETAIL REPORT SEP Project I
- Page 398 and 399: PROJECT DETAIL REPORT SEP Project I
- Page 400 and 401: PROJECT DETAIL REPORT SEP Project I
- Page 402 and 403: PROJECT DETAIL REPORT SEP Project I
- Page 404 and 405: PROJECT DETAIL REPORT SEP Project I
- Page 406 and 407: PROJECT DETAIL REPORT SEP Project I
- Page 408 and 409: PROJECT DETAIL REPORT SEP Project I
- Page 410 and 411: PROJECT DETAIL REPORT SEP Project I
- Page 413: 11. PROJECT LISTS & SUMMARY OF PROJ
- Page 417 and 418: Table 11.1: SEP Projects by Funding
- Page 419 and 420: Table 11.1: SEP Projects by Funding
- Page 421: Table 11.1: SEP Projects by Funding
- Page 424 and 425: educing growth adjusted electricity
- Page 426 and 427: step within the Strategic Energy Pl
- Page 429: Appendix A Field Data Forms (Electr
- Page 433: Appendix C Other Calculations and D