24.07.2013 Views

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$33,236 $38,449<br />

$2,742<br />

$4,317<br />

$40,295<br />

$4,029<br />

$13,754<br />

$4,585<br />

$5,502<br />

N/A<br />

$4,614<br />

$43,063<br />

$4,306<br />

Totals: $44,324 $47,369<br />

Total Project Cost: $115,534<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $115,534<br />

Rebate/Incentive*:<br />

$55,772<br />

Net Project Cost: $59,762<br />

Net Simple Payback Period (yrs): 2.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

238,032<br />

0<br />

$20,947<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!