<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1062 ACS - 1 to 5 - SP Reset<br />

D1063 ACS 8 (AHU-3) - Aircruity<br />

D1064 CF - 1 to 22 - VIV to VAV<br />

D1065 ACS 9 - CAV to VAV<br />

D3013 Monitoring Based Commissioning<br />

ENGR BLDG 4<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4256A<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1990<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

283,121 3.0 3,127 0 155,143 $51,915<br />

242,891 22.0 3,191 0 162,129 $49,169<br />

743,261 143.0 0 0 601,695 $103,530<br />

25,138 4.0 815 0 39,788 $9,208<br />

555,894 64.0 0 59,707 0 $81,705<br />

Basic Gross Area (sf): 294,124<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$126,983 $136,824 $25,397 0.5<br />

Committed Tier:<br />

Backup<br />

$1,551,693 $129,310 $1,422,383 28.9<br />

Committed Tier:<br />

Backup<br />

$755,712 $293,908 $461,804 4.5<br />

Committed Tier:<br />

Backup<br />

$32,243 $23,860 $8,383 0.9<br />

Committed Tier:<br />

Backup<br />

$497,340 $193,122 $304,218 3.7<br />

Totals 1,850,305 236.0 7,133 59,707 958,755 $295,529 $2,963,971 $777,024 $2,222,185 7.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

7,445,800 348,400 25.3 1.2<br />

377.7<br />

7,445,800 348,400 25.3 1.2<br />

377.7<br />

4,828,491 199,531 16.4 0.7<br />

235.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

37.5%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th