<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1007 AHU 1 SP Reset<br />

D1008 CAV to VAV - AHU 2<br />

D3021 Monitoring Based Commissioning<br />

KERCKHOFF<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4310<br />

Funding Source: HOUSING<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1930<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

31,578 0.0 451 0 18,206 $6,409<br />

29,236 1.0 226 0 12,178 $4,585<br />

54,531 6.0 0 7,436 0 $8,882<br />

Basic Gross Area (sf): 70,820<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Commons<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$2,784 $16,712 $557 0.1<br />

Committed Tier:<br />

Backup<br />

$28,262 $12,180 $16,082 3.5<br />

Committed Tier:<br />

Backup<br />

$59,875 $20,523 $39,352 4.4<br />

Totals 115,345 7.0 677 7,436 30,384 $19,876 $90,921 $49,415 $55,991 2.8<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

896,400 41,900 12.7 0.6<br />

188.8<br />

896,400 41,900 12.7 0.6<br />

188.8<br />

756,748 26,002 10.7 0.4<br />

146.1<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

22.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />