<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1025 AHU 1, 2 & 4 SP Reset<br />

D1026 AHU 3 5 & SF-1 CAV to VAV with SP Reset<br />

D3042 Monitoring Based Commissioning<br />

D6004 Replace Chiller<br />

D6009 CW Reset<br />

SOUTHERN REGIONAL LIBRARY FACILITY<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4562<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1987<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

320,992 5.0 3,742 0 0 $48,795<br />

89,403 4.0 925 0 0 $12,947<br />

175,796 20.0 0 23,972 0 $28,634<br />

264,354 80.0 0 0 0 $23,263<br />

40,032 0.0 0 0 0 $3,523<br />

Basic Gross Area (sf): 228,306<br />

Building Type: BASIC<br />

Primary Asset Type: Library<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$72,370 $123,813 $14,474 0.3<br />

Committed Tier:<br />

Backup<br />

$132,983 $33,019 $99,964 7.7<br />

Committed Tier:<br />

Backup<br />

$193,024 $66,163 $126,861 4.4<br />

Committed Tier:<br />

Backup<br />

$387,408 $63,445 $323,963 13.9<br />

Committed Tier:<br />

Backup<br />

$9,013 $9,608 $1,803 0.5<br />

Totals 890,577 109.0 4,667 23,972 0 $117,162 $794,797 $296,048 $567,065 4.8<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,889,800 135,200 12.7 0.6<br />

188.8<br />

2,889,800 135,200 12.7 0.6<br />

188.8<br />

1,999,223 52,891 8.8 0.2<br />

112.8<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

40.2%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />