UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

PERLOFF HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4202<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

D1051 CAV to VAV - AHU 1, 2, 5W and 5E & Add Economizer<br />

D3003 Monitoring Based Commissioning<br />

LOS ANGELES<br />

1952<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

104,141 4.0 304 0 145,777 $20,070<br />

50,750 6.0 0 6,920 0 $8,266<br />

Basic Gross Area (sf): 65,909<br />

Building Type: BASIC<br />

Primary Asset Type: Laboratory<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$231,886 $56,783 $175,103 8.7<br />

Committed Tier:<br />

Backup<br />

$55,723 $19,100 $36,623 4.4<br />

Totals 154,891 10.0 304 6,920 145,777 $28,336 $287,609 $75,883 $211,726 7.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

834,200 39,000 12.7 0.6<br />

188.8<br />

834,200 39,000 12.7 0.6<br />

188.8<br />

562,687 28,280 8.5 0.4<br />

130.3<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

31.0%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th