A Dutch case study. The Bijlmermeer, Amsterdam Zuidoost. Chapter 5<br />

---------------------------------------------------------------------------------------------------------------------<br />

different <strong>housing</strong> segments. The first<br />

action has the character <strong>of</strong> ‘corrective<br />

building measure’ in the prosecution <strong>of</strong><br />

the approach applied since the ‘80s.<br />

Different preservation levels <strong>of</strong> the initial<br />

urban and building configuration have<br />

been fixed per sub-areas. The characters<br />

<strong>of</strong> the G- and K- neighbourhood, <strong>for</strong><br />

example, that are high-rises in the socalled<br />

‘Bijlmermeer museum’ -area, have<br />

been substantially preserved.<br />

As said in the previous section, the Final<br />

Plan <strong>of</strong> Action is the most recent<br />

<strong>renovation</strong> programme under<br />

implementation in the Bijlmermeer. It is<br />

currently the largest Dutch restructuring<br />

project (Wassenberg, 2006) and based<br />

on a very radical approach. For what<br />

concerns the existing high-rise buildings,<br />

in fact, there is a very high demolition<br />

rate. In the end, almost 70% <strong>of</strong> the<br />

original blocks will be pulled down.<br />

Portion <strong>of</strong> <strong>for</strong>mer high-rise surrounded by new low-rise,<br />

Fside area – urban plan by Rein Geurtsen, 1997<br />

The Project Bureau Bijlmermeer is the <strong>of</strong>fice set up to co-ordinate and implement the entire<br />

plan. The board, directing the working group and deciding <strong>for</strong> the major directions <strong>of</strong><br />

<strong>intervention</strong>, is composed by three bodies that are the City <strong>of</strong> Amsterdam, the local<br />

municipality Amsterdam Zuidoost and the <strong>housing</strong> association Nieuw Amsterdam.<br />

DWELLINGS<br />

1992<br />

DEMOLITION NEW CONSTRUCTION<br />

2012<br />

HIGH-RISE 12.500 100% 6.550 0 5.950 44%<br />

LOW-RISE 0 0% 0 4.600 4.600 34%<br />

SINGLE-FAMILY 0 0% 0 2.850 2.850 21%<br />

12.500 100% 6.550 7.450 13.400 100%<br />

Most <strong>of</strong> the green lots have being substituted by new low rises. F side by Splineter, 2005<br />

The City <strong>of</strong> Amsterdam contributes <strong>for</strong> 50% <strong>of</strong> the costs, while the other half is financed by<br />

the Central Fund <strong>for</strong> Housing (CFV), the national fund created by fees paid by all the Dutch<br />

<strong>housing</strong> associations together. The 10 year investment (excluding <strong>intervention</strong>s within the<br />

ArenA-area) is € 1.6 billion, <strong>of</strong> which € 450 million won’t produce a financial return (the<br />

exploitation deficit is paid by the <strong>housing</strong> association).<br />

14. E<br />

FINAL PLAN<br />

THE BODIES