28.08.2013 Views

2 - Fagor Automation

2 - Fagor Automation

2 - Fagor Automation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8.7 Check the installation<br />

Check the installation:<br />

Mechanical fixtures for the whole system<br />

Distances<br />

Tighten all the mounting screws with their corresponding tightening<br />

torque.<br />

Electrical connections and wiring:<br />

Connection of protection wires<br />

Fuses, value and type<br />

Ends of the wires of the cables<br />

Cables and connectors installed correctly<br />

Mechanical latches of the connectors<br />

Control cables<br />

Necessary shielded connections according to EMC<br />

Compliance with electromagnetic compatibility measures<br />

Satisfactory covers and seals of the electrical cabinet to reach the<br />

necessary protection level.<br />

Installation<br />

INSTALLATION<br />

Check the installation 8.<br />

DDS<br />

HARDWARE<br />

Ref.1209<br />

311

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!