26.01.2015 Views

Department of Defence Annual Report 2008-2009

Department of Defence Annual Report 2008-2009

Department of Defence Annual Report 2008-2009

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

| Programme 1: <strong>Defence</strong> Administration |<br />

the limit to produce satisfactory results.<br />

The Division is trying to improve the<br />

situation by means <strong>of</strong> mentoring/<br />

coaching <strong>of</strong> current project <strong>of</strong>cers,<br />

maintaining close liaison with the<br />

Services (seconding project <strong>of</strong>cers to<br />

the Division), as well as increasing the<br />

number <strong>of</strong> Project Manager courses<br />

presented annually.<br />

• Due to a tight budget and many<br />

critical projects, projects are started<br />

and scheduled over too long a period.<br />

If these timescales cannot be reduced,<br />

obsolescence <strong>of</strong> systems becomes<br />

a critical factor, which can severely<br />

hamper system implementation and<br />

support. It is anticipated that the reprioritisation<br />

<strong>of</strong> the SCAMP will<br />

alleviate this situation to some degree.<br />

The Division will ensure that projects<br />

are scheduled according to operational<br />

priorities, and industry capacity.<br />

MATTERS UNDER OVERSIGHT<br />

The following matters are currently under oversight<br />

and decisions on the way forward will be taken in<br />

the next nancial year:<br />

• Contractual Review <strong>of</strong> the Airbus A400M<br />

Programme. Owing to the lengthy delay in the<br />

delivery schedule <strong>of</strong> the A400M aircraft, this<br />

programme has now entered in a contractual<br />

review. The contract has certain options open<br />

to the customer when conditions are not met,<br />

which have to be discussed, and the RSA way<br />

forward agreed upon internally. The launch<br />

nations have yet to nalise their way forward,<br />

and this decision is eagerly awaited as it could<br />

have a huge impact on the programme as a<br />

whole.<br />

• Closure <strong>of</strong> the Frigate Programme. The<br />

closure <strong>of</strong> the frigate project has been postponed<br />

to 31 March 2011, to nalise outstanding<br />

contractual requirements.<br />

Measurable Objective<br />

The Acquisition Services Subprogramme directs<br />

and manages the acquisition <strong>of</strong> DOD specied<br />

matériel and technology requirements by means <strong>of</strong><br />

competent personnel within the allocated budget,<br />

and in accordance with policies and prescripts.<br />

Output Detail<br />

Table 2.9 <strong>Defence</strong> Matériel Division Output for FY <strong>2008</strong>/09<br />

Output<br />

To full<br />

armaments<br />

requirements<br />

according to force<br />

design<br />

Performance<br />

Measure<br />

Shortened<br />

turnaround time<br />

<strong>of</strong> armaments<br />

and equipment<br />

acquisition<br />

for Services<br />

and Divisions<br />

that meet the<br />

specications for<br />

user requirements<br />

<strong>Annual</strong> Target<br />

Complete review<br />

<strong>of</strong> acquisition<br />

policy<br />

Table 2.9 below provides details on the <strong>Defence</strong><br />

Matériel Subprogramme’s output, performance<br />

measures and targets are specied in the DOD’s<br />

Strategic Business Plan FY <strong>2008</strong>/09.<br />

Actual Target<br />

Achievement<br />

Suggested changes have<br />

been incorporated to a<br />

large extent (90%)<br />

Reason(s) for<br />

Over/Under<br />

Achievement<br />

In-line with<br />

recommendations<br />

made by the<br />

<strong>Defence</strong> Policy<br />

Board, update<br />

policy to be<br />

compiled in a new<br />

format; revised<br />

target date<br />

31 December <strong>2009</strong><br />

Possible changes<br />

to the DOD’s<br />

macro-structure<br />

must be<br />

considered before<br />

amending the<br />

existing policy<br />

<strong>Annual</strong> <strong>Report</strong> FY <strong>2008</strong> - <strong>2009</strong><br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!