25.02.2015 Views

VOLUME I Multinational Maritime Tactical Instructions and Procedures

VOLUME I Multinational Maritime Tactical Instructions and Procedures

VOLUME I Multinational Maritime Tactical Instructions and Procedures

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MTP 1(D), Vol. I<br />

6345 WIDE-AREA LINK OPERATIONS<br />

When a Link 11 net is established on a wide area <strong>and</strong> involves several TF/TG operating<br />

independently or in support situation Bravo or Charlie, a link point of contact, the FTC-A, will be<br />

designated in each TF/TG. On behalf of the OTC, the FTC-A of each TF/TG will be authorized to provide<br />

information <strong>and</strong> requirements about the link net management with the DNCS, using RATT messages or<br />

the voice Link Coordination Circuit. Depending on the nature of the operation, the senior OTC will<br />

promulgate information or requirements about the net management, updating the current OPTASK LINK<br />

as necessary. During wide-area Link 11 operations, the DNCS should be the AEW aircraft (E-3 or E-2<br />

type) when on station.<br />

6346 NOT RELEASABLE<br />

6347 — 6349 SPARE<br />

6350 LINK MANAGEMENT UNITS<br />

Apart from track management on voice nets <strong>and</strong> data links, the links themselves need to be<br />

managed. Several duties describe the management task. These duties may be combined <strong>and</strong> are ideally<br />

vested in the FTC-A.<br />

6351 DATA NET CONTROL STATION (DNCS)<br />

The DNCS is the participating unit in a link organization for air, surface, <strong>and</strong> subsurface data<br />

compilation who performs the technical management of the net.<br />

a. The responsibilities are:<br />

(1) Advise the FTC-A on the use of frequencies <strong>and</strong> link parameters.<br />

(2) Initiate <strong>and</strong> terminate the data net, under the overall directives of the OTC.<br />

(3) Control the order in which units are called in Roll Call mode of operation (Link 11).<br />

(4) Monitor <strong>and</strong> analyze the data nets from link establishment to link termination (technical<br />

performance).<br />

b. The DNCS is chosen on the basis of:<br />

(1) Central location relative to other link-fitted units, which it must interrogate.<br />

(2) Radiation hazard <strong>and</strong> EMCON considerations.<br />

(3) State of equipment.<br />

6-25 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!