25.02.2015 Views

VOLUME I Multinational Maritime Tactical Instructions and Procedures

VOLUME I Multinational Maritime Tactical Instructions and Procedures

VOLUME I Multinational Maritime Tactical Instructions and Procedures

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MTP 1(D), Vol. I<br />

6352 GATEWAY UNIT<br />

In group working with more than one TDS system (i.e., Link 11) a gateway unit is assigned. A<br />

gateway unit is a participating unit that is operating on both links <strong>and</strong> is responsible for transfer of selected<br />

track data between the two link systems. The transfer can be manual or automatic.<br />

6353 LINK BROADCAST UNIT<br />

For Link 11 <strong>and</strong> Link 14, a broadcast unit may be assigned. This unit will transmit data from his TDS<br />

system to other units, who will only receive this data but not answer or retransmit. The receiving units will<br />

either plot this data manually or automatically.<br />

6354 GRID REFERENCE UNIT (GRU)<br />

The GRU is the unit designated by the OTC to maintain the OTC’s geographical reference point.<br />

a. The GRU is responsible for:<br />

(1) Carrying out general grid locks as ordered by the AAWC/FTC-A.<br />

(2) Acting as reference for individual grid locks where possible.<br />

(3) Monitoring the positional accuracy of transmitted data by link participating units.<br />

(4) Ensuring his data systems’ navigational input is both up-to-date <strong>and</strong> accurate.<br />

b. The GRU should be chosen by the OTC on the basis of:<br />

(1) Position in the force, ensuring:<br />

(a) Good link communications.<br />

(b) Greatest track density coverage.<br />

(2) Large <strong>and</strong> accurate track reporting capability.<br />

(3) Accurate navigational facilities.<br />

(4) Reliability of link participating unit.<br />

6355 — 6359 SPARE<br />

6360 PROCEDURES<br />

6361 GRID LOCK PROCEDURE<br />

a. Grid Locks. The GRU executes grid locks on completion of the insertion of the DLRP into the<br />

various TDS, or after changing the DLRP. Grid locks are also executed periodically to reduce errors in grid<br />

reporting.<br />

(1) Individual Grid Lock (Codeword RONSON). Individual grid locks are undertaken:<br />

(a) When a unit joins the force <strong>and</strong> enters the net.<br />

6-26 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!