25.02.2015 Views

VOLUME I Multinational Maritime Tactical Instructions and Procedures

VOLUME I Multinational Maritime Tactical Instructions and Procedures

VOLUME I Multinational Maritime Tactical Instructions and Procedures

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

g. Approach Corridor. The approach corridor is usually established on a line between the<br />

entry/exit gate <strong>and</strong> the force/disposition center. If the force center cannot be determined by the aircraft’s<br />

radar, the corridor will be on a line between the entry/exit gate <strong>and</strong> the PIM position. The inner boundary is<br />

determined by the ISR. The approach corridor width is normally 5 nm either side of the line. Depending on<br />

the mode of promulgation the corridor may be fixed geographically or move in the following manner (see<br />

Figure 6-3):<br />

1. If the entry/exit gate <strong>and</strong> ISR are established relative to force/disposition center, the corridor orientation<br />

<strong>and</strong> dimensions will not change but the entry/exit gate <strong>and</strong> the corridor will move with the<br />

force.<br />

There may be occasions when tactical considerations dictate deviation from the direct route from<br />

entry/exit gate to the force/PIM position. In which case, the routing must be included in the OTC’s<br />

OPGEN/OPTASK updates or agreed to between the shore ADC <strong>and</strong> the OTC. When establishing<br />

approach corridors, the OTC must consider the communications that will be available for joining <strong>and</strong><br />

marshalling, the direction of the friendly bases from which aircraft might come, threat axis, areas in which<br />

support aircraft will be employed once on patrol, location of TOMCAT <strong>and</strong> AEW pickets in a large<br />

disposition, <strong>and</strong> AAW coordination such as MEZ <strong>and</strong> FEZ.<br />

h. Identification Safety Point (ISP). When the gate is not within the radar cover of the ships or<br />

when two-way communications are not established between the ACUs, the ISP is the point at which<br />

aircraft on joining the force will attempt to establish two-way communications with the ships <strong>and</strong><br />

commence identification procedures. Unless otherwise promulgated the ISP will be a position at 150 nm<br />

from ZZ on a direct line between the in-use gate <strong>and</strong> ZZ. There may be occasions when tactical<br />

considerations dictate deviation from the direct route from gate to ZZ. In which case, an ISP may be<br />

included in the OTCs AAW update or agreed between the shore ADC <strong>and</strong> the OTC, otherwise the ISP need<br />

not be promulgated.<br />

6417 IDENTIFICATION/RECOGNITION PROCEDURES<br />

Tentative initial identification/recognition of friendly aircraft may be assumed when an aircraft,<br />

showing the proper IFF/SIF code, enters <strong>and</strong> settles down on the heading of the designated approach<br />

corridor or sector. Positive identification/recognition will be considered as established when an aircraft<br />

has been visually sighted <strong>and</strong> recognized by CAP, other known friendly aircraft, or a surface ship. If not<br />

sighted, positive identification/recognition may be assumed if at least one planned IFF/SIF change or<br />

identity maneuver has been made. The following self identification procedures are established:<br />

a. NOT RELEASABLE<br />

MTP 1(D), Vol. I<br />

6-41 CHANGE 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!