11.07.2015 Views

Sustainable Building Technical Manual - Etn-presco.net

Sustainable Building Technical Manual - Etn-presco.net

Sustainable Building Technical Manual - Etn-presco.net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER 19E nv i ro n m e n t a lConstruction Gu i d e l i n e sGeneral Considerations★ S I G N I F I CA N C E .The construction process can have a significant impact on environmental resources.Environmentally conscious construction practices can markedly reduce site disturbance, thequantity of waste sent to landfills, and the use of natural resources during construction. Itcan also minimize the prospect of adverse indoor air quality in the finished building. Inaddition to yielding environmental benefits, all of these actions can lower project costs.AuthorGerard HeiberIn many cases, construction clears and disturbs the site’s existing natural resources—native vegetation and wildlife, natural drainage systems, and other natural features—andreplaces them with artificial systems such as non-native vegetation and artificial drainage.Waste generated from construction and demolition accounts for about 28 percent oflandfill volume. Emissions from new construction materials as well as dust, particulates,and other airborne contaminants generated during the construction process are suspectedof causing health problems. In addition, most construction projects today require the useof new virgin materials (adding to the depletion of limited natural raw materials if suchmaterials are not renewable), even when recycled-content, reused, or refurbished materialsare sufficient for the intended purpose.When approaching construction from a sustainable perspective, a builder should ensurethat the construction contract and specifications address the design and constructionteams’ environmental requirements for the construction process. Many of these issuesand practices are typically under the direct control of the construction contractor, whowas most likely selected by competitive bid.The construction professional’s responsibility is to fulfill the project objectives in accordancewith the construction contract, construction drawings and specifications, projectschedule, and project budget. The contractor’s goal is to build the project for the lowest

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!