11.07.2015 Views

1 - HKU Libraries - The University of Hong Kong

1 - HKU Libraries - The University of Hong Kong

1 - HKU Libraries - The University of Hong Kong

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.4 Under S. 41 (1) (aa) <strong>of</strong> the BO, the HA isexempted from the provisions <strong>of</strong> the BO which, under S.16(1) (b), requires building plans to be examined andapproved by the D <strong>of</strong> FS. Notwithstanding this statutoryexemption,the HD has drawn up its internal policy,practices and procedures in respect <strong>of</strong> EVAs and FSIs andequipment in the construction <strong>of</strong> the HA buildings and HOScourts.3.5 Under the HD's internal policy, the design <strong>of</strong>EVAs and FSIs and equipment for all new rental and HOSprojects are required to be submitted to the FSD forapproval prior to the commencement <strong>of</strong> construction work.<strong>The</strong>re are internal Technical Guides and Manuals on thedesign <strong>of</strong> estate roads, EVAs and FSIs and equipment forthe project teams to follow. <strong>The</strong>se guides and manualsare reviewed and revised periodically. Copies <strong>of</strong>Buildings Technical Guides-External Works 114, 115, 116showing the design practices to be adopted, are at AnnexIX(a)- (c) . In terms <strong>of</strong> the Private Sector ParticipationScheme (PSPS) projects, the developer concerned has tocomply with the prevailing legislative requirements underthe control <strong>of</strong> the BD and FSD as these are not regardedas HA property.Internal Policy, Practices and Procedures in Respect <strong>of</strong>EVAs and FSIs and Equipment3.6 According to the HD's practices and procedures,standard FSIs and equipment drawings for standard blocksare separately submitted by the department's Design andStandards Team to the FSD for comment/approval at thedetailed design stage. <strong>The</strong> approved drawings are used bythe Project Teams for individual projects which maymodify the design, if necessary, to suit the projectsituation.3.7 For each individual project, at the earlyplanning stage, the master layout plan showing theproposed EVAs is circulated to the FSD amongst othergovernment departments for their initial comments. Atthe detailed design stage, general building plans whichalso indicate the EVA layout are submitted to the FSD forapproval. Upon approval <strong>of</strong> the layouts, FSIs andequipment drawings based on the approved building plansare submitted to the FSD for reference and recordpurposes.- 13 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!