Design of a bridge<br />
Other stakeholders:<br />
The Rijkswaterstaat: The Rijkswaterstaat is a government organisation<br />
responsible <strong>for</strong> the Dutch waterways, dikes, dams <strong>and</strong> canals. The<br />
Rijkswaterstaat imposes rules <strong>for</strong> m<strong>in</strong>imis<strong>in</strong>g the radar disturbance caused by a<br />
bridge. Once a bridge is built there should still be enough vision <strong>and</strong> radar vision<br />
downstream. The Rijkswaterstaat also imposes limits on the amount of<br />
disturbance to shipp<strong>in</strong>g dur<strong>in</strong>g the construction of a bridge. One side of the<br />
bridge <strong>in</strong> the case will st<strong>and</strong> on a important dam controlled by the<br />
Rijkswaterstaat. Another part of the Rijkswaterstaat, the Civil Eng<strong>in</strong>eer<strong>in</strong>g<br />
Division (Rijkswaterstaat Bouwdienst), checks the calculations <strong>for</strong> the bridge.<br />
The IBA has hired the Rijkswaterstaat Civil Eng<strong>in</strong>eer<strong>in</strong>g Division as advisor.<br />
The Reliant Energy: This company has a power station near the bridge site. Road<br />
embankments are necessary between the bridge <strong>and</strong> the connect<strong>in</strong>g roads<br />
because of the height of the bridge. One of the road embankments will be on<br />
Reliant Energy’s l<strong>and</strong>, so permission is required to build on this l<strong>and</strong>. The<br />
Reliant Energy also has a dock that the contractor might want to use to transport<br />
materials to the build<strong>in</strong>g site, thus the construction company needs to obta<strong>in</strong><br />
permission from the Reliant Energy to use the dock.<br />
The TENET: There are high voltage transmission l<strong>in</strong>es above part of the bridge<br />
<strong>and</strong> part of the terra<strong>in</strong> needed to build the bridge. Build<strong>in</strong>g underneath high<br />
voltage l<strong>in</strong>es imposes specific hazards on people work<strong>in</strong>g on such a site. It will<br />
also make build<strong>in</strong>g the bridge upstream <strong>and</strong> shipp<strong>in</strong>g it to the site difficult. It<br />
will not be possible to load the already constructed bridge onto a ship <strong>and</strong><br />
transport it <strong>in</strong>to position because it is not possible <strong>for</strong> a ship with the bridge on it<br />
to pass under the power l<strong>in</strong>es. The TENET might be will<strong>in</strong>g to cut the power<br />
through the l<strong>in</strong>es if the power dem<strong>and</strong> is low dur<strong>in</strong>g certa<strong>in</strong> hours of the day or<br />
<strong>for</strong> some months. Whether or not this is possible has to be discussed with the<br />
TENET.<br />
The Municipality Diemen: Part of the bridge will be on l<strong>and</strong> owned by the<br />
municipality Diemen, so their permission to build is needed.<br />
The Architect: The customer has hired an architect <strong>for</strong> the architectural <strong>design</strong> of<br />
the bridge. The architect had already per<strong>for</strong>med a study <strong>for</strong> the DRO concern<strong>in</strong>g<br />
bridges <strong>in</strong> IJburg.<br />
The Groengebied: On one side of the Amsterdam-Rijnkanaal, (the Diemer side)<br />
there is a nature reserve. The Groengebied manages this area. The Groengebied<br />
has to give permission be<strong>for</strong>e the build<strong>in</strong>g can start. The Groengebied will<br />
amongst other th<strong>in</strong>gs, need to check whether animals can still get from one side<br />
of the earth embankment to the other.<br />
The Prov<strong>in</strong>cie North Holl<strong>and</strong>: The Netherl<strong>and</strong>s are divided <strong>in</strong> 12 prov<strong>in</strong>ces. A<br />
prov<strong>in</strong>ce has its own council <strong>and</strong> is responsible <strong>for</strong> spatial plann<strong>in</strong>g, <strong>for</strong> part of<br />