Conclusions of the empirical study<br />
Table 8.2 cont<strong>in</strong>ued Summary of the pip<strong>in</strong>g <strong>and</strong> equipment case-study.<br />
<strong>Ethical</strong> <strong>issues</strong>,<br />
questions <strong>and</strong><br />
problems<br />
Can the details on the<br />
draw<strong>in</strong>g be produced<br />
without too much<br />
difficulty or danger <strong>for</strong><br />
people on the<br />
construction site?<br />
K<strong>in</strong>d of <strong>issues</strong> Solution <strong>and</strong><br />
decision<br />
approaches<br />
Division or<br />
ascription of<br />
responsibility<br />
between<br />
eng<strong>in</strong>eer<strong>in</strong>g<br />
company <strong>and</strong><br />
contractor.<br />
Related to type of<br />
contract, less<br />
likely <strong>in</strong> turn-key<br />
contract.<br />
Discussion on<br />
assigned<br />
responsibilities of<br />
customer,<br />
eng<strong>in</strong>eer<strong>in</strong>g<br />
company <strong>and</strong><br />
contractor.<br />
Table 8.3: Summary of the bridge case-study.<br />
Normal, high to middle level <strong>design</strong><br />
<strong>Ethical</strong> <strong>issues</strong> K<strong>in</strong>d of <strong>issues</strong> Solution <strong>and</strong> decision<br />
questions <strong>and</strong><br />
problems<br />
approaches<br />
Assumption:<br />
<strong>design</strong><strong>in</strong>g by<br />
legislation <strong>and</strong><br />
codes leads to<br />
safe bridges.<br />
Choice between<br />
European code<br />
<strong>and</strong> NEN code<br />
Operationalisation Approval <strong>for</strong> build<strong>in</strong>g<br />
I of requirements permission, no disasters<br />
have occurred with<br />
bridges built accord<strong>in</strong>g to<br />
codes.<br />
Decision makers<br />
<strong>in</strong>volved<br />
Pip<strong>in</strong>g <strong>design</strong>er,<br />
eng<strong>in</strong>eer<strong>in</strong>g company,<br />
contractor, customer<br />
Decision makers<br />
Organisations<br />
<strong>for</strong>mulat<strong>in</strong>g the<br />
regulative framework,<br />
permission issu<strong>in</strong>g<br />
organisations,<br />
European Union,<br />
Governments,<br />
St<strong>and</strong>ardisation<br />
Institutes<br />
Operationalisation Fatigue loads better Customer will make<br />
I of requirements predicted <strong>in</strong> European choice based on advice<br />
code. Bridge probably not<br />
more expensive us<strong>in</strong>g<br />
European code. Less<br />
experience with European<br />
code, calculations will take<br />
more time.<br />
from IBA<br />
157