Design of a bridge<br />

Completion: The eng<strong>in</strong>eer<strong>in</strong>g <strong>design</strong> company controls whether the build<strong>in</strong>g<br />

contractor has built an object that satisfies the requirements. Advice is given on<br />

payments.<br />

The prelim<strong>in</strong>ary <strong>design</strong> phase started <strong>in</strong> January 2004 <strong>and</strong> was f<strong>in</strong>ished by the<br />

end of April 2004. The phase resulted <strong>in</strong> a prelim<strong>in</strong>ary <strong>design</strong> report <strong>for</strong> the<br />

customer. Dur<strong>in</strong>g the prelim<strong>in</strong>ary <strong>design</strong> phase I attended the technical meet<strong>in</strong>gs<br />

<strong>and</strong> I <strong>in</strong>terviewed five eng<strong>in</strong>eers <strong>and</strong> the architect work<strong>in</strong>g on the project. I will<br />

expla<strong>in</strong> more about the context of the <strong>design</strong> process <strong>in</strong> the next section, there the<br />

stakeholders <strong>and</strong> the customer will be described.<br />

The bridge should be constructed <strong>and</strong> be ready <strong>for</strong> use <strong>in</strong> 2007. A document<br />

with the <strong>design</strong> requirements had already been written dur<strong>in</strong>g the research phase<br />

be<strong>for</strong>e the prelim<strong>in</strong>ary <strong>design</strong> phase. The IBA had participated <strong>in</strong> the research<br />

phase <strong>and</strong> the writ<strong>in</strong>g of the requirements. Other stakeholders <strong>in</strong>volved <strong>in</strong> the<br />

research phase were the architect <strong>and</strong> the DRO, the municipal organisation <strong>for</strong><br />

plann<strong>in</strong>g <strong>and</strong> urbanism. The prelim<strong>in</strong>ary <strong>design</strong> of this bridge is high to middle<br />

level <strong>design</strong>, it is somewhat lower <strong>in</strong> <strong>design</strong> hierarchy than the conceptual <strong>design</strong><br />

of the bridge but it is the first ef<strong>for</strong>t to make a <strong>design</strong> of the construction of the<br />

bridge based on the architect’s draw<strong>in</strong>gs of the desired shape of the bridge.<br />

Design<strong>in</strong>g this bridge is a normal <strong>design</strong> process. In this regard the bridge is<br />

just another arched bridge although it is a rather large one. The work<strong>in</strong>g<br />

pr<strong>in</strong>ciple, how arched bridges work, <strong>and</strong> normal configuration, what they look<br />

like, are well known. The architect tried to make the work<strong>in</strong>g pr<strong>in</strong>ciple of the<br />

arched bridge visible <strong>in</strong> its shape. In an arched bridge there are either strong <strong>and</strong><br />

heavy arches to support the mass or there are two strong beams at either side of<br />

the bridge deck that carry most of the loads. In this case the architect had chosen<br />

to use heavy arches. In short the <strong>design</strong> problem is: build a beautiful arched<br />

bridge that is not too expensive <strong>and</strong> that does not h<strong>in</strong>der ships dur<strong>in</strong>g<br />

construction or while <strong>in</strong> use. Take all legislation <strong>in</strong>to account <strong>and</strong> take care that<br />

no one gets <strong>in</strong>jured or killed dur<strong>in</strong>g construction.<br />

The difficulty <strong>in</strong> this <strong>design</strong> process is not <strong>in</strong> <strong>design</strong><strong>in</strong>g a new work<strong>in</strong>g<br />

pr<strong>in</strong>ciple or a new configuration; it is <strong>in</strong> comb<strong>in</strong><strong>in</strong>g <strong>and</strong> meet<strong>in</strong>g all<br />

requirements, <strong>in</strong> the coord<strong>in</strong>ation of all the different tasks <strong>and</strong> <strong>in</strong> ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the<br />

communication between all the stakeholders. A lot of stakeholders are <strong>in</strong>volved:<br />

among others two municipalities, a power station, an architect, the municipal<br />

service <strong>for</strong> urban development, <strong>and</strong> the Rijkswaterstaat. 2 All these stakeholders<br />

——————————————————————————————————<br />

2 The <strong>design</strong> process is at the time not f<strong>in</strong>ished. After the prelim<strong>in</strong>ary <strong>design</strong> phase the <strong>design</strong><br />

process was temporarily stopped. There were some f<strong>in</strong>ancial problems concern<strong>in</strong>g IJburg <strong>and</strong><br />

the customer needed to deal with them. The customer probably also needs to get the<br />

permission of the Amsterdam city council to exp<strong>and</strong> the budget <strong>for</strong> the bridge.<br />