<strong>Ethical</strong> <strong>issues</strong> <strong>in</strong> eng<strong>in</strong>eer<strong>in</strong>g <strong>design</strong><br />

of the case-study is a large bridge connect<strong>in</strong>g IJburg to local highways. 1 The<br />

bridge will span the Amsterdam-Rijnkanaal, which at this po<strong>in</strong>t is about 130 m<br />

wide. The span of the bridge will be 150 m <strong>and</strong> on one side (Reliant Energy side)<br />

of the bridge 33 m of road lead<strong>in</strong>g to the bridge is <strong>in</strong>cluded <strong>in</strong> the project; on the<br />

other side (Diemen) 66 m is <strong>in</strong>cluded. Large ships must be able to pass under the<br />

bridge, there<strong>for</strong>e the bridge needs to be at least 9,30 m above water level.<br />

The <strong>design</strong> process <strong>and</strong> construction of this large bridge will take years.<br />

There<strong>for</strong>e only one of the phases of the <strong>design</strong> process was studied. The phase of<br />

the <strong>design</strong> process that I studied was the prelim<strong>in</strong>ary <strong>design</strong> phase. The IBA used<br />

a st<strong>and</strong>ard contract made by a Dutch professional association <strong>for</strong> eng<strong>in</strong>eers that is<br />

used mostly by eng<strong>in</strong>eer<strong>in</strong>g companies work<strong>in</strong>g with<strong>in</strong> civil eng<strong>in</strong>eer<strong>in</strong>g <strong>in</strong> the<br />

Netherl<strong>and</strong>s. In this contract the <strong>design</strong> process is divided <strong>in</strong>to the follow<strong>in</strong>g<br />

eight phases [KIvI, 2003]. The eng<strong>in</strong>eer<strong>in</strong>g company can be hired <strong>for</strong> one or more<br />

of the phases of the <strong>design</strong> process.<br />

Research: Research <strong>in</strong>to the feasibility, environmental effects, societal acceptation<br />

etc <strong>for</strong> mak<strong>in</strong>g a go, no go decision <strong>for</strong> the project. This research is also used to<br />

decide on <strong>design</strong> requirements.<br />

Prelim<strong>in</strong>ary <strong>design</strong>: Based on the <strong>design</strong> requirements a sketch <strong>design</strong> <strong>and</strong><br />

descriptions on how the object will function are made <strong>and</strong> used to <strong>in</strong><strong>for</strong>m the<br />

customer about the costs <strong>and</strong> the time necessary to build the <strong>design</strong>. The<br />

customer has to approve the prelim<strong>in</strong>ary <strong>design</strong> be<strong>for</strong>e the next phase is started.<br />

Def<strong>in</strong>ite <strong>design</strong>: The dimensions are fixed <strong>and</strong> the costs of materials <strong>and</strong><br />

apparatus <strong>in</strong>dicated <strong>for</strong> use <strong>in</strong> the prelim<strong>in</strong>ary <strong>design</strong> are calculated (us<strong>in</strong>g codes<br />

if necessary), drawn <strong>and</strong> specified. At the end of this phase there should be a<br />

clear idea about what the costs to build <strong>and</strong> operate the object will be <strong>and</strong> the time<br />

needed to build it.<br />

Tender specification <strong>and</strong> construction documents: The location, the amount <strong>and</strong><br />

quality of materials <strong>and</strong> processes used to construct the object are described <strong>in</strong><br />

the tender specifications. The tender specifications also <strong>in</strong>clude adm<strong>in</strong>istrative<br />

<strong>and</strong> legal requirements. The tender specifications are necessary <strong>for</strong> tender<strong>in</strong>g <strong>and</strong><br />

they will be used as part of the contract with the build<strong>in</strong>g contractor.<br />

Price <strong>and</strong> contract: Build<strong>in</strong>g contractors bid to obta<strong>in</strong> the contract.<br />

Detail<strong>in</strong>g: The <strong>design</strong> is further detailed by the build<strong>in</strong>g contractor <strong>in</strong> cooperation<br />

with the eng<strong>in</strong>eer<strong>in</strong>g company to ensure that it can be built accord<strong>in</strong>g<br />

to the tender<strong>in</strong>g specifications.<br />

Build<strong>in</strong>g: The eng<strong>in</strong>eer<strong>in</strong>g <strong>design</strong> company ensures that the <strong>design</strong> is built<br />

accord<strong>in</strong>g to the specifications <strong>in</strong> the tender<strong>in</strong>g specifications.<br />

——————————————————————————————————<br />

1<br />

For people who are familiar <strong>in</strong> the area, the bridge will connect IJburg with the A1 <strong>and</strong> A9<br />

highway near exit Diemen.<br />