12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

19.0 Mobilization Advance19.1 Contractor, if requested, shall be paid recoverable interest bearing Mobilization Advance up to amaximum of 10% (Ten Percent) of works portion of order value. The mobilization advance willattract an interest rate as SBI's PLR rate (prevailing at the time of payment) plus 1% to be<strong>com</strong>pounded quarterly. Mobilization Advance shall be paid to the Contractor in two installments aftersigning the Order agreement and submission of performance bank guarantee for 110% of totalmobilization advance amount, in the following manner:19.1.1 FIRST INSTALLMENTi) 5% (Five percent) of works portion of order value shall be payable as the firstinstallment of mobilization advance after fulfilling the following formalities by theContractor:a) Duly accepted & signed copy of Order by the Contractor.b) Submission of a separate bank guarantee towards Contract Performance from anyScheduled Bank in India other than Co-operative Bank in the Proforma approved byEmployer / Consultant towards due performance of contract equivalent to 10% ofawarded Order value which shall be kept valid till up to 3 Months after expiry ofdefect liability period.c) Submission of a separate Bank Guarantee towards advance payment by anyScheduled Bank in India other than Co-operative Bank in the proforma approved byEmployer/Consultant equivalent to 110% of mobilization advance which shall be keptvalid till scheduled <strong>com</strong>pletion of the work.d) The Bank Guarantee submitted against mobilization advance shall be released afterrecovery of full mobilization advance alongwith interest thereon.19.1.2 SECOND INSTALLMENTBalance 5% Mobilisation Advance shall be payable to the Contractor after Contractor hasconstructed site Office, storage shed, fabrication yard etc. and has physically mobilizedequipments as specified in tender document and is ready to start the work to the entiresatisfaction of Engineer -in-Charge and <strong>com</strong>mencement of work at site. This installmentshall be paid to the contractor after <strong>com</strong>pletion of initial mobilization. The contractor shallalso submit Utilization Certificate of advance received by him earlier.19.2 RECOVERY OF MOBILISATION ADVANCEThe Mobilization Advance together with the interest accrued, shall be recovered from eachMH2145-C000-PS-RFQ-0020Page 126 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!