12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

expenses will not be borne by the Vendor unless inspection be<strong>com</strong>es infructuousdue to any omission or <strong>com</strong>mission on the part of the Vendor. Before shipping ordispatch, the equipment and or materials will have to be checked and stamped byinspectors who are authorized also to forbid the use and dispatch of any equipmentand / or materials which during tests and inspection fail to <strong>com</strong>ply with thespecifications, codes and testing requirements.The vendor shall inform Procurement Coordinators / Managers at least eight days inadvance of the exact place, date and time of rendering the equipment or materialsfor required inspection.Provide free access to inspectors during normal working hours to Vendor's or his/itssubVendor's works and place at their disposal all useful means of performing,checking, marking, testing, inspection and final stamping.Even if the inspections and tests are fully carried out, Vendor would not be absolvedto any degree from his responsibilities to ensure that all equipments and materialssupplied <strong>com</strong>ply strictly with requirements as per agreement both duringconstruction, at the time of delivery, inspection, on arrival at site and after itserection or start-up and guarantee period as stipulated in clause 29 hereof.The Vendor's responsibility will not be lessened to any degree due to any <strong>com</strong>mentsmade by Procurement Coordinators / Managers and Inspectors on the Vendor'sdrawings or by Inspectors witnessing any chemical or physical tests.In any case, the equipment and materials must be in strict accordance with theOrder and/or its attachments failing which the Owner shall have the right to rejectthe goods and hold the Vendor liable for non-performance of contract.7. OFFICIAL INSTITUTIONAL TESTINGIn addition to testing and inspection by Inspectors mentioned above, nominatedagencies or similar institutional agencies like Boiler Inspectorate may be assignedfor official testing of all coded equipment. The Vendor shall ensure that allProcedures for preparation and performance of tests prescribed by such Institutionsshall be <strong>com</strong>pleted scrupulously.The Vendor is required to send to such institutions as may be designed by theOwner at least three sets of construction drawings for each equipment andcalculations. All manufacturer's mill's tests certificates and analytical reports frommaterial laboratories in respect of all raw materials and <strong>com</strong>ponents employed shallhave to be presented to such institution's Inspectors in the number of copiesrequired. Vendor shall be responsible for any delay in submission of necessarycertificates. The Vendor shall maintain close liaison with Procurement Coordinatorsand Institution's Inspectors to maintain schedule and delay, if any in this process willnot be taken into consideration as a cause of Force Majeure.8. EXPEDITINGProcurement Coordinators / Managers have been assigned to expedite bothmanufacture and shipment of equipment and materials covered by the PurchaseOrder. The Procurement Coordinators / Managers shall have free access toVendor's shop and/or sub suppliers' shop at any time and they shall be provided allthe necessary assistance and information to help them perform their job.MH2145-C000-PS-RFQ-0020Page 97 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!