12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

m No. Short description Item Description Unit Quantity00 SV3 LAND ACQUISITION For SV-3 station @Ch: 92.699, Village: Qutubpur (Chainage tolerance of +/- 1000 mtrs) Sq.m 240001 SV4 LAND ACQUISITION For SV-4 station @Ch: 117.435, Village: Supawasa (Chainage tolerance of +/- 1000 mtrs) Sq.m 240002 SV5 LAND ACQUISITION For SV-5 station @Ch: 184.929, Village: Ghuncha (Chainage tolerance of +/- 1000 mtrs) Sq.m 240003 SV6 LAND ACQUISITION For SV-6 station @Ch: 227.706, Village: Rajnagar (Chainage tolerance of +/- 1000 mtrs) Sq.m 240004 SV station fill grad <strong>com</strong>pa05 SV const <strong>com</strong>pund wall06 SV approach roadFilling, grading & <strong>com</strong>paction of earth to finish grade level all <strong>com</strong>plete as per the specifications, approved drawings, directions of Engineerin-chargeand provisions of contract document all <strong>com</strong>plete for a depth of filling over and above 1.2 m and upto 3.0mConstruction of Compound wall for SV stations all <strong>com</strong>plete as per the specifications, approved drawings, scope of work ,directions ofEngineer-in-charge & provisions of contract document for a length over and above 180 mtrs (being paid under the earlier items). Paymentshall be made basis additional length of the <strong>com</strong>pound wall constructed over and above 180 mtrs.Construction of approach road (including bitumen topping) all <strong>com</strong>plete as per the specifications, approved drawings, scope of work,directions of Engineer-in-charge and provisions of contract document for Black top road surface over and above 50 Sq.m(being paid underearlier items)All related Civil and Structural works for scraper launcher ,receiver, pipe sleeper and miscellaneous pipe supports at Rewari, Bharatpur &Mathura station.SUPPORTS AND EQUIPMENT FOUNDATIONS :Design, detailed engineering, preparing construction and fabrication drawings, obtaining approval of drawings and designs from engineer-incharge,construction of supports and foundations, pipe sleepers, transportation, erection, fabrication, painting, finishing etc., all <strong>com</strong>plete forthe scraper launcher and receiving facilities of cross-country pipeline as indicated in the scope drawings, including supply of all labour,material, equipment etc. <strong>com</strong>plete as per specification, preliminary and conceptual drawings, design basis, approved drawings, codes andstandards and as per the directions of Engineer-in-charge.PRICE SCHEDULE (INDIAN BIDDERS)Schedule of Quantities for 18” dia Rewari - Kanpur Cross Country Pipeline ( Part I)Cu.m 12000Mtrs 400Sq.m 2500Unit Price inclusive of all cost towards Air/Rail fare, lodging,boarding, Traveling ,medical , localtransport, all insurances, in<strong>com</strong>e/corporate(as may be applicable) ,incidental chargesand all other expenses, taxes Itduties etc. but excluding service taxService Tax including cessapplicable onUnit Price(@ 12.36%)Total Price inclusive of all costtowards Air/ Rail fare, lodging,boarding, Traveling,medical , local transport, allinsurances, in<strong>com</strong>e/corporate (as maybe applicable),incidental charges and all otherexpenses , taxes It duties etc.including service tax(7) = (5 + 6) x 4Page 7 of 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!