12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

own cost to Owner's stores. In case the Contractor fails to do so then recovery for suchquantity of pipes not returned by the Contractor at the penal rates shall be effected from theContractor’s bill(s) or from any other dues of the Contractor to the Owner.5.0 EQUIPMENTSVarious equipment/materials intended for the installation will be received by Owner inunpacked, skid mounted, crated, packed or loose condition and will be stored in thewarehouses and open yards. In general, materials will be issued to the Contractor in ‘asreceived’ condition. It will be the Contractor’s responsibility to draw, load and transport allmaterials from Owner’s designated places of issue to the point of installation and return allpacking materials like steel frames, wooden boxes/scrap etc. to Owner’s stores.All materials supplied by the Owner shall be duly protected by the Contractor at his own costwith appropriate preservative like primer, lacquer coating, grease etc. as required.6.0 CABLES & WIRES6.1 Appropriation of cables shall be done as follows:6.1.1 All the surplus and serviceable cables out of the cables returned by theContractor to the Owner's store in good condition and as directed by theEngineer-in-Charge.6.1.2 The Contractor shall be allowed a cutting/wastage allowanceof 1.5% for power cables and 3% for the control cables. Thiscutting/wastage allowance shall be <strong>com</strong>puted on the length of cablesactually laid, measured and accepted.6.1.3 All cables being returned to store should carry Aluminium sheet tagsindicating the size & type of cable. Cables of less than 15 meters length willbe termed as scrap. Cables of lengths 15M and above shall be termed asserviceable material & shall be returned size wise and category wise to theOwner's store in wooden drums. Cables of serviceable length being returnedto stores in drum(s) shall be accepted only after Megger value continuity testand physical measurement is carried out by the Contractor to thesatisfaction of Engineer-in- Charge. Empty cable drums and major packingmaterial (as decided by Engineer-in-charge) shall be Owner’s property andshall be returned to Owner’s Store/designated place without any additionalcost.6.1.4 While carrying out material appropriation with the Contractor, the abovepoints will be taken into account. All serviceable materials returned by theContractor (size wise & category wise) shall be deducted from the quantity(ies) issued to the Contractor for the respective sizes. Scrap generated forpower cable and control cable shall also be returned to Owner’s store on Lotbasis.6.1.5 Material appropriation shall be done & allowable scrap quantity calculated.The wastage generated by the Contractor in excess of the allowablepercentage shall be charged at the penal rates.7.0 WATER PROOFING COMPOUNDWater proofing <strong>com</strong>pounds shall be of makes approved by HPCL/WORLEYPARSONS.Bidder shall mix <strong>com</strong>pound in the presence of WORLEYPARSONS/HPCL and maintainMH2145-C000-PS-RFQ-0020Page 214 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!