12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the work as per standards and all code requirements. In case Engineer-in-Charge feels thatContractor's QA/QC Engineer(s) are in<strong>com</strong>petent or insufficient, contractor has to deploy otherexperienced Engineer(s) as per site requirement and to the full satisfaction of Engineer-In-Charge.38.6 In case contractor fails to follow the instructions of Engineer-in-charge with respect to aboveclauses, next payment due to him shall not be released unless until he <strong>com</strong>plies with theinstructions to the full satisfaction of Engineer-in-charge.38.7 The Contractor shall adhere to the quality assurance system & Quality Control Plan(QCP) asper WORLEYPARSONS Specification & QCP enclosed in the Bidding Document as Appendix-V(A) & Appendix-V(B) respectively to SCC.38.9 Quality, Workmanship, documentation of material to be supplied by the contractor shall be fromapproved manufacturer & duly inspected by <strong>WorleyParsons</strong>/Third party inspection appointed by<strong>WorleyParsons</strong>.39.0 HEALTH SAFETY AND ENVIRONMENT (HSE) MANAGEMENT39.1 The Contractor, during entire duration of the Order, shall adhere to HSE requirement as per spec.enclosed in the bidding document as Appendix-VI to SCC.39.2 HSE Management Plan is to be followed in letter & Spirit.39.3 Non-adherence / Lagging for carrying out any HSE Desired elements shall invite delay in start ofwork / Stoppage of work /Suspension of work / hiring of desired short fall equipments at the risk &cost of the contractor. No extension of the <strong>com</strong>pletion time shall be granted under therecircumstances.40.0 SITE CLEANING40.1 The Contractor shall clean and keep clean the work site from time to time to the satisfaction of theEngineer-in-Charge for easy access to work site and to ensure safe passage, movement andworking.40.2 If the work involves dismantling of any existing structure in whole or part, care shall be taken tolimit the dismantling up to the exact point and/or lines as directed by the Engineer-in-Charge andany damage caused to the existing structure beyond the said line or point shall be repaired andrestored to the original condition at the Contractor's cost and risks to the satisfaction of theEngineer-in-Charge, whose decision shall be final and binding upon the Contractor.40.3 The Contractor shall be the custodian of the dismantled materials till the Engineer-in-Chargetakes charge thereof.40.4 The Contractor shall dispose off the unserviceable materials, debris etc. to any area asdecided by the Engineer-in-Charge.MH2145-C000-PS-RFQ-0020Page 136 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!