12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the Bidding document contractor shall furnish the details of makes and shall obtain prior approvalof Engineer-in-Charge of vendors/sub-vendors before placing order.66.0 PROJECT PLANNING, SCHEDULING AND MONITORING SYSTEMThe following schedules/documents/reports shall be prepared and submitted by theBidder/Contractor for review/approval at various stages of the contract.66.1 After the Award of Contracta) Time ScheduleThe Completion Time Schedule for the work (including mobilization period) as perAppendix- II to SCC of <strong>Tender</strong> in all respect, from the date of issue of Letter / Fax ofIntent (LOI/FOI)The Bidder is required to submit a Project Time Schedule in Primavera. The Scheduleshall cover all aspects like sub-ordering, manufacturing and delivery, indicated in the BidDocument. The Owner interface activities shall be clearly identified with their latestrequired dates. Owner reserves the right to disqualify the Bidder if the above Schedulesubmitted by the Bidder is not in line with the overall Project requirement.b) Scheduling & Monitoring SystemThe Bidders should describe their system of Project Scheduling and monitoring, the extentof <strong>com</strong>puterization, level of detailing, tracing methodology etc. with the name of <strong>com</strong>puterpackage and sample outputs.c) Overall Project ScheduleThe Contractor shall submit within 1 week of LOI/FOI, a sufficiently detailed overall ProjectSchedule in the activity network form, clearly indicating the major milestones,interrelationship/ interdependence between various activities together with analysis ofcritical path and floats.The network will be reviewed and approved by Engineer- in-Charge and the <strong>com</strong>ments ifany shall be incorporated in the network before issuing the same for implementation. Thenetwork thus finalized shall form part of the contract document and the same shall not berevised without the prior permission from Engineer-in- Charge during the entire period ofcontract.d) Progress Measurement MethodologyThe contractor is required to submit within 1 week of award of WORK, the methodology ofprogress measurement of sub-ordering, manufacturing/ delivery, sub- contractingconstruction and <strong>com</strong>missioning works and the basis of <strong>com</strong>putation of overallservices/physical progress informed. Owner reserves the right to modify the methodologyMH2145-C000-PS-RFQ-0020Page 147 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!