erection only after obtaining approval of erection scheme by Engineer-in-charge.52.6.3 Grouting of equipment, anchor bolts, pockets and under base plates shall be carried out as pertechnical specifications.53.0 REPAIR OF PIPE DEFECTS53.1 Immediately prior to aligning pipe for welding, the beveled ends of each joint of pipe and the areaimmediately adjacent thereto (at least 25mm from the edge on the inside and outside of the pipe)shall be thoroughly cleaned of paint, rust, mill scale, dirty or other foreign matter by use of powerdrive wire buffing wheels, disc sanders, or by other methods approved by Employer/Consultant.This shall be done at no extra cost to Employer/Consultant.53.2 All damaged ends of pipe that are bent, cut or otherwise mutilated to such an extent that in theopinion of the Employer/Consultant, faulty alignment or unacceptable welding would result, shallbe repaired or cut-off and re-beveled to the correct angle with a beveling machine of a typeapproved by Employer/Consultant. No <strong>com</strong>pensation shall be allowed by reason of such recuttingor beveling, except when required because of the original bevel being damaged before thepipe is "taken over" by Contractor.53.3 Dents in bevels with a depth of less than 1 mm shall be removed by Contractor during cleaningand grinding, ahead of the welding in the field. Contractor shall re-bevel dented bevel ends with adepth between 1 and 3 mm. Dents over 3mm depth shall be repaired by cutting and re-beveling.54.0 LOCATION OF STORAGE YARD54.1 The Storage Yard is situated at the locations as mentioned in the scope of work.54.2 Items issued as Free Issue Material (FIM) shall be collected by the Contractor fromEmployer/Consultant's designated storage yard(s) as directed by Engineer-in-Charge. Contractorshall arrange for handling of FIM including crane etc for loading/unloading, transportation of FIM torequired site location free of cost.55.0 WORKING HOURSNormal working Hours ,in general shall be from 09:00 am to 05:30 pm, particularly for HPCLStations at Rewari, Bharatpur and Mathura. However, working hours for work within the Stationsshall be governed by the work Permits issued by HPCL.56.0 TESTS AND INSPECTION56.1 The Contractor shall carry out the various tests as enumerated in the technical specifications ofthis bid document and the technical documents that will be furnished to him during theperformance of the work.MH2145-C000-PS-RFQ-0020Page 143 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!