42.0 COORDINATION WITH OTHER AGENCIESWork shall be carried out in such a manner that the work of other agencies operating at the site isnot hampered due to any action of the Contractor. Proper coordination with other agencies will beContractor's responsibility. In case of any dispute, the decision of Engineer-in-Charge shall befinal and binding on the Contractor.43.0 ISSUE OF EMPLOYER/CONSULTANT SUPPLIED MATERIAL43.1 The conditions for issue of material and reconciliation refer enclosed Appendix-VII to SCC.43.2 The reconciliation of material shall be applicable only for the material issued by Employer/Consultantas free issue to the contractor and monthly reconciliation will be submitted alongwith monthly RABill.44.0 DRAWINGS AND DOCUMENTS44.1 The drawings ac<strong>com</strong>panying the bid document (if any) are of indicative nature and issued forbidding purpose only. Purpose of these drawing is to enable the bidder to make an offer in line withthe requirements of the Employer/Consultant. However no extra claim whatsoever, shall beentertained for variation in the "Approved for Construction" and "Bid document drawings" regardingany changes/units. Construction shall be as per drawings/specifications issued/approved by theEngineer-in-Charge during the course of execution of work. Detailed construction drawings(wherever required) on the basis of which actual execution of work is to proceed will be preparedby the contractor.44.2 The drawings and documents to be submitted by the Contractor to Employer/Consultant after awardof the work as per the requirements enlisted in the bidding document shall be forEmployer/Consultant's review, information and record. The Contractor shall ensure that drawingsand documents submitted to Employer/Consultant are ac<strong>com</strong>panied by relevant calculations, dataas required and essential for review of the document/ drawings. WORLEYPARSONS shall reviewthe drawings/ documents within two weeks from the date of submission provided the same areac<strong>com</strong>panied by relevant calculations, data as required and essential for review.44.3 All documents and drawings including those of Contractors sub-vendor's manufacturer's etc. shallbe submitted to Employer/Consultant after having been fully vetted in detail, approved and cooptedby the Contractor & shall bear Contractor seal/ certifications to this effect. Alldocuments/drawings & submissions made to Employer/Consultant without <strong>com</strong>pliance to thisrequirement will not be acceptable and the delay & liability owing to this shall be to theContractor's account.44.4 The review of documents and drawings by Employer/Consultant shall not absolve Contractor fromhis responsibility to meet the requirements of specifications, drawings etc. and liabilities formistakes and deviations. Upon receiving the <strong>com</strong>ments on the drawing/documents reviewed byEmployer/Consultant, Contractor shall incorporate the <strong>com</strong>ments as required and ensure their<strong>com</strong>pliance.MH2145-C000-PS-RFQ-0020Page 138 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!