12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.0 CERTIFICATION-QUALITY ASSURANCE AND QUALITY CONTROLAll material and equipment to be permanently incorporated in the project shall beduly quality controlled /inspected and certified for full <strong>com</strong>pliance with the “Laws-Rules-codes and standards “prevailing for the project and as per approvedquality assurance plan.Quality control, inspection and certification shall be as follows:4.1 BASIC PRINCIPLESEquipment vendors and subcontractors must be duly approved ,qualified andcertified for their ability to supply basic materials, assemble, erect, install, test<strong>com</strong>mission, proceed to <strong>com</strong>posite works and to fabricate the equipmentaccording to the codes and specifications.All basic materials, equipment in addition to shop fabrication anderection/construction shall be subject of 3.1 Certification before leaving the millsIn addition some activities may, as mandatory by law or at the discretion ofOwner/Owner’s representative, be audited and/or subjected to 3.2 certification4.2 QUALITY PLANVendor/Contractor shall, on due time ,establish and submit to approval ofOwner/Owner’s representative a <strong>com</strong>prehensive Quality Assurance Programand Quality plan stating clearly the organization it proposes to set up and theways it intends to organize the Certifications.4.3 Certifications specific to Hydrocarbon related facilitiesVendor/ Contractor shall assure the certification of its activities or works as wellas of any subcontractors as follows4.3.1 3.1 Certification4.3.2 3.2 CertificationOwner/WORLEYPARSONS reserves the right to nominate one or more TPIA toexecute in its name all inspection and certification it aims necessary or ismandatory by Law.Owner / Owner’s representative may also be nominated to act in name of Ownerfor the purpose and present for specific items or activities; in that case “Owner”shall also mean “Owner’s Representative” in the frame of its “Commitment”.Owner / Owner’s representative’s presence to certification events and / or finalissue of certificates shall in no way reduce the obligation of vendor / contractorfrom it’s duties, obligations and liabilities.Vendor / Contractor shall, in its Quality Assurance Plans (QAP), proposeprocedures to inform Owner / Owner’s Representative, on due time to allow for3.2 Certification.MH2145-C000-PS-RFQ-0020Page 201 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!