12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Order, or material of sub-standard quality or supplied in excess quantity (unless authorisedby the buyer), shall be rejected and the rejected goods if any shall be returned to Seller atSeller's cost and risk.74. CEMENT & STEELIn partial modification to clause no. 7.e and 7.f of GTC, unless until specified explicitly in the tenderdocument, supply of cement and steel shall be arranged by Contractor and the cost of the same shall bedeemed to be included in the quoted prices.75 CONSTRUCTION RIGHT-OF-USE AND PERMITS:75.1 The Owner shall allow to the Contractor the construction right-of-use for the pipeline acquired asper P&MP act 1962. Acquisition of land for CP/SV/IP stations, Anode bed locations including allnecessary liasoning with government authorities is in the scope of the contractor. Permissions forvarious crossings those are necessary and available with Owner to lay the pipeline. Please referAPPENDIX-XIV to SCC for list of crossing approvals available with owner. Balance of the crossingapprovals are to be obtained by Contractor to lay the pipeline.75.2 All other permissions, permits and licenses necessary for the performance of the work shall beobtained by the Contractor at his own cost and initiative. In so far as any such permission, permitor license required for the performance of the work by the contractor can only be granted at therequest or re<strong>com</strong>mendation of the Owner, the Owner shall at the request of the Contractor, providere<strong>com</strong>mendatory letters to the contractor to obtain or procure the same. The contractor shall not,however, be entitled to any additional <strong>com</strong>pensation over and above contracted rates of servicesfor any hardship or increased cost caused by any idleness, suspension or disruption of work or anyother account whatsoever as a result of the inability of the contractor to obtain the permission(s),permit(s), license(s) aforesaid to match with the progress of the work nor shall the same constitutea ground for extension of time.75.3 The Owner does not warrant that the right-of-use shall be suitable at all locations for use and/ormovement of vessels and mechanical and other equipment of the Contractor, and the Contractorshall be responsible at his own cost and initiative to innovate at site and adopt suitable means toperform the work in any particular circumstances as may be encountered. The Contractor shall notbe entitled to any <strong>com</strong>pensation beyond the price of services for any hardship or increased costcaused by the pipeline being routed in the tidal zone or adjacent to or across any pipeline,highway, road, dyke, lake, river, stream, land and other water channel or course, swamp or mash,telephones, telegraph and electric power lines, cables, poles and wires, sewers, drains,embankments, cliffs or other obstacles whatsoever which may be physically or otherwise, in anymanner restrict or limit the use of Contractor's vessels, machinery or equipment or necessitateadditional precautions and/or works to lay the pipeline or necessitate the use of special methods ofconstruction and/or employment of manual processes, all such contingencies and restrictivefeatures being deemed to have been recognized by the contractor and provided for in the price ofservices.75.4 The contractor shall notify the Owner the probable date of <strong>com</strong>mencement of work at ROU site atMH2145-C000-PS-RFQ-0020Page 152 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!