Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TIME SCHEDULESr No Description Completion Time12Mechanical Completion including pre<strong>com</strong>missioning.(for each part(s) )In addition to above, for the activitiesincluding Restoration of ROU andObtaining NOCs from land owners andstatutory authorities, Compensatoryafforestation, Commissioning of PCPand CP mitigation measures includingobtaining refund of deposit amountsheld with respective authorities fromwhom approvals to crossings areobtained in Each Part (s).10 ( Ten Months )6 (Six) months beyondthe above <strong>com</strong>pletiontimeNote:1. For Each Part, Mechanical <strong>com</strong>pletion shall be defined as <strong>com</strong>pletionof all Pipeline & associated works as mentioned hereunder:i. Laying of Pipelineii. Completion of Welding including all Tie-insiii. Radiography of all welded jointsiv. Field joint coatingv. Pipeline Crossings (Rivers, Rail, roads, canal etc.)vi. Lowering & Backfilling of Pipelinevii. Caliper / Gauge Pigging including Flushing / Cleaning,Swabbing, etc.viii. Hydro testingix. TCPx. Laying of Optical Fibre Cable and associated works includingEstablishing all fiber of OFC Continuity between respective SVs.xi. Installation of SV Valves, Pig launcher & receivers and associated worksMH2145-C000-PS-RFQ-0020Page 170 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!