12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Engineer-in-charge during execution of works.51.2 Contractor further agrees that Contract price is inclusive of all the associated costs, which he mayincur for actual mobilization, required in respect of use of mechanised construction techniquesand that the Employer/Consultant/Consultant in this regard shall entertain no claim whatsoever.52.0 GENERAL GUIDELINES DURING AND BEFORE ERECTION52.1 Contractor shall be responsible for organizing the lifting of the equipment in the proper sequence,that orderly progress of the work is ensured and access routes for erecting the other equipmentsare kept open.52.2 Orientation of all foundation, elevations, lengths and disposition of anchor bolts and diameter ofholes in the supports saddles shall be checked by contractor, well in advance. Minor rectificationsincluding chipping of foundations as the case may be shall be carried out at no extra cost by thecontractor after obtaining prior approval of the Engineer-in-Charge. The Contractor shall also beprovided with the necessary structural drawings and piping layouts etc., wherever required forreference. During the structural member need to be dismantled, to facilitate the equipmenterection, same shall be done by the contractor after ensuring proper stability of main structurewith prior permission of Engineer-in-Charge. All such dismantled members shall be put inposition back after the <strong>com</strong>pletion of equipment erection to satisfaction of Engineer-in-Charge.52.3 During the performance of the work the Contractor at his own cost, shall keep structures,materials and equipment adequately braced by guys, struts or otherwise approved means whichshall be supplied and installed by the Contractor as required till the installation work issatisfactorily <strong>com</strong>pleted. Such guys, shoring, bracing, strutting, planking supports etc. shall notinterfere with the work of other agencies and shall not damage or cause distortion to other worksexecuted by him or other agencies.52.4 Manufacturer's re<strong>com</strong>mendations and detailed specifications for the installation of the variousequipment and machines will be passed on to the contractor to the extent available during theperformance of work. The requirements stipulated in these clauses shall be fulfilled by theContractor.52.5 Various tolerances required as marked on the drawings and as per specifications andinstructions of the Engineer-in-Charge, shall be maintained. Verticality shall be maintained.Verticality shall be verified with the Theodolite.52.6 ERECTION OF EQUIPMENTS52.6.1 All the erection shall be carried out by Cranes of suitable capacity. Erection by derrick shall notbe permissible. The contractor shall arrange the crane of suitable capacity required for erectionand include cost for same in respective items without any liability on the part ofEmployer/Consultant.52.6.2 Bidder shall submit the indicative erection scheme for equipment and shall undertake theMH2145-C000-PS-RFQ-0020Page 142 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!