12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SR.No.A1234567BParticularsF13707 /C-2/NOC/3769/2012 -11/12/2012F13708/C-2/NOC/3760/2012 -11/12/2012F09127 C-4/NOC-669/12 -23/08/2012F09126 C-4/NOC-668/12 -23/08/2012F09123 C-4/NOC-671/12 -23/08/2012F09124 C-4/NOC-667/12 -23/08/2012F09125 C-4/NOC-670/12 -23/08/2012CommentsUttar Pradesh State Pollution Control Board1) Compliance report to be submitted upto 10th of every month.2) First take approval 2 months before intimation. Intimate 2months before start of week.3) Inspection before start of Transportation.4) Septic Tank, Soak Pit.5) MCE in a month report.6) Follow the P & N G rules.7) Fire Brigade readiness.8) River,road, canal,rail crossings by HDD.9) Restoration of land.10) Environmental rules to be followed.11) Copy of Central / GOI Environmental approval to be given.12) Gas Petroleum products not to be transported.13) Daily progress for application of all environmental rules.14) Residential ac<strong>com</strong>odation wherever constructed should havesoak pit / septic tank, etc.15) Green belt to be built. DG Set to have accoustic enclosure &suitable chimney be installed.1) Compliance report to be submitted upto 10th of every month.For transportation of petroleum products 2 months prior noticemust be given.2) Mock drill may be performed on regular basis.1) Exhaust of chimney at least 2 meter above the height point ofroof. DG set to be silent, no noise.2) Safety norms / incase of accidents reporting to be done toDMP.3) Actions to be taken to have the minimum loss to theproperties/assets/mankind.4) Environmental rules of 1986 to be followed.1) Mitigation of objections raised during public hearing on14.5.12 be carried in total.2) Readiness of Fire Brigade/Engines in suffient quantity bedone.1) DG Set may not be installed.Environmental friendly petroleumproducts be used. In unethical situation, gas generators beinstalled & approval be obtained.Rajasthan State Pollution Control BoardMH2145-C000-PS-RFQ-0020Page 264 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!