12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

y them / Vendors shall be provided along with every RA Bill.82.11 In case of final bill, contractor shall be required to submit NOC from all agencies engaged by themabout receipt of full payment from the contractor.82.12 Substitute / Equivalent equipment shall not be acceptable for equipment listed in Annexure-VIII-Bto SCC. However for other equipment listed in Annexure-VIIIB to SCC, equivalent/substituteequipment may be accepted, as decided by Engineer-in- Charge.83.0 SPECIFIC REQUIREMENTSFor Specific requirements, bidder shall refer to the Material Requisition enclosed in the tender.Status of all clearances required for the job shall be provided to the successful bidders,should there be any other requirement for execution of job, shall be obtained by thecontractor at his own cost and statutory payments shall be reimbursed by HPCL based ondocumentary evidence.83.1 Deleted.83.2 Deleted.83.3 Deleted.83.4 The pipeline laying job in each Part is planned to be carried out in two fronts. Hence, it may benoted that contractor mobilization shall be in line with the same and it shall be the responsibilityof the contractor to ensure that no front is left open for a period of more than two months fromthe date of opening.i. Deleted.ii.Contractor is required to coordinate with forest/ highway/local authorities, etc. for smoothexecution of work. In cases of delays in obtaining ROU clearance, contractor shall not beentitled to any <strong>com</strong>pensation thereof. Contractor shall obtain clearances from Localauthorities to continue the works.In social forestry areas, contractor shall liaise and obtain permission from authorities as perrelevant Rules & Acts.iii.Bidder to note that after <strong>com</strong>pletion of work, ROU shall be restored by Contractor to itsoriginal condition. Contractor shall submit ROU restoration certificate, signed by plot owner,patwari/concerned village officer, contractor, to Competent Authority of the Project forrespective States who will review and accept restoration of ROU. The activity shall beconsidered for measurement purpose only after acceptance of restoration by C.A.iv. Security arrangements for all installations/facilities being carried out by Contractor, up toPage 158 of 334MH2145-C000-PS-RFQ-0020

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!