- Page 1 and 2: Hindustan Petroleum Corporation Ltd
- Page 3 and 4: CHAPTER 1REQUEST FOR QUOTATION (RFQ
- Page 5 and 6: Local ConditionsIt will be imperati
- Page 7: The tender details including EMD, B
- Page 10 and 11: his bid shall not be considered for
- Page 12 and 13: 5) This prime member shall be solel
- Page 14 and 15: Note:1. All the information require
- Page 16 and 17: EMD submitted by the bidder for sub
- Page 18 and 19: however, bids in hard copies shall
- Page 20 and 21: 7.0 A firm which is not a PSU or an
- Page 22 and 23: We are unable to bid for the reason
- Page 24 and 25: CUT-OUT SLIPDO NOT OPEN- THIS IS A
- Page 26 and 27: CUT-OUT SLIPDO NOT OPEN- THIS IS A
- Page 28 and 29: QUOTATION AGAINST TENDERENQUIRY (En
- Page 30 and 31: INDEXSR. NO.ARTICLE DESCRIPTION1.0
- Page 34 and 35: sealed and pasted with the enclosed
- Page 36 and 37: l. Declaration with the bid qualifi
- Page 38 and 39: Fax:91-22-67818080 in the presence
- Page 40 and 41: for Part-II. In case such bidder is
- Page 42 and 43: In case if the bidder quotes the ra
- Page 44 and 45: xv)xvi)xvii)Non Submission of decla
- Page 46 and 47: (c)When it is not possible to ascer
- Page 48 and 49: 14.7.2 To offset Central Sales Tax
- Page 50 and 51: Where based on workability assessme
- Page 52 and 53: tender terms not in deviation sheet
- Page 54 and 55: INDEXSr. No. Article Description1.
- Page 56 and 57: GENERAL TERMS & CONDITIONS OF CONTR
- Page 58 and 59: 2. 8 The "Drawings" shall include m
- Page 60 and 61: 3.6 The quantities indicated in the
- Page 62 and 63: wherever required in the tender pap
- Page 64 and 65: For working on Sundays/Holidays, th
- Page 66 and 67: 5.b COMMENCEMENT OF WORKThe contrac
- Page 68 and 69: Contractor or the BG (if LD is full
- Page 70 and 71: manufacture or fabrication or on th
- Page 72 and 73: a. defects, if any, to be rectified
- Page 74 and 75: payment of wages, salaries or other
- Page 76 and 77: 6.e.INSURANCE AND LABOURContractor
- Page 78 and 79: iv. The contractor shall ensure tha
- Page 80 and 81: 7. PAYMENT OF CONTRACTOR'S BILLS7.
- Page 82 and 83:
shall be final and binding on the C
- Page 84 and 85:
7.e.4.Manufacturer's certificate sh
- Page 86 and 87:
accordance with the contract, the C
- Page 88 and 89:
12.0 TERMINATION OF CONTRACT12.1 Th
- Page 90 and 91:
Contractor to complete the job with
- Page 92 and 93:
shall be entitled at any time to in
- Page 94 and 95:
INDEX1. DEFINITION2. REFERENCE FOR
- Page 96 and 97:
and scope of work (technical), GPC
- Page 98 and 99:
In order to facilitate over-all exe
- Page 100 and 101:
Dimensions :For every order and eve
- Page 102 and 103:
26. CHANGESThe Owner has the option
- Page 104 and 105:
34. TECHNICAL INFORMATIONDrawings,
- Page 106 and 107:
Chapter: 4SPECIAL CONDITIONSOFCONTR
- Page 108 and 109:
44.0 DRAWINGS AND DOCUMENTS45.0 HOU
- Page 110 and 111:
viii) General Terms & Conditions of
- Page 112 and 113:
duties levied by statutory authorit
- Page 114 and 115:
stipulations including obtaining re
- Page 116 and 117:
4.1.3 Unless otherwise stated the t
- Page 118 and 119:
4.2.6 No Interest charges for delay
- Page 120 and 121:
9.0 PROVIDENT FUND, LABOUR, LABOUR
- Page 122 and 123:
not carried out work according to g
- Page 124 and 125:
16.a7 The Arbitrator may give a com
- Page 126 and 127:
19.0 Mobilization Advance19.1 Contr
- Page 128 and 129:
persons/persons or bodies/companies
- Page 130 and 131:
CONTRACTOR shall take all precautio
- Page 132 and 133:
Employer/Consultant shall not provi
- Page 134 and 135:
and return to the Contractor the st
- Page 136 and 137:
the work as per standards and all c
- Page 138 and 139:
42.0 COORDINATION WITH OTHER AGENCI
- Page 140 and 141:
pipelines, cables etc., during cons
- Page 142 and 143:
Engineer-in-charge during execution
- Page 144 and 145:
56.2 All the tests either on the fi
- Page 146 and 147:
The information to possible extent
- Page 148 and 149:
in part or in full.e) Functional Sc
- Page 150 and 151:
OWNER.66.4.4 Progress reports shall
- Page 152 and 153:
Order, or material of sub-standard
- Page 154 and 155:
75.11 Co-ordination with appropriat
- Page 156 and 157:
81.2 Contractor shall develop and s
- Page 158 and 159:
y them / Vendors shall be provided
- Page 160 and 161:
Contractor to note that it is their
- Page 162 and 163:
3.0 APPENDICES TO SCCMH2145-C000-PS
- Page 164 and 165:
SCOPE OF WORK & SUPPLY(APPENDIX-I t
- Page 166 and 167:
MATHURARKPL Project OfficeHPCL Depo
- Page 168 and 169:
12. Compensatory Afforestation as p
- Page 170 and 171:
TIME SCHEDULESr No Description Comp
- Page 172 and 173:
MEASUREMENT OF WORK(APPENDIX-III to
- Page 174 and 175:
The contractor shall submit the bil
- Page 176 and 177:
5.0 ELECTRICAL WORKS5.1 Cables5.1.1
- Page 178 and 179:
TERMS OF PAYMENT(APPENDIX-IV to SCC
- Page 180 and 181:
B) 5% on completion of all works in
- Page 182 and 183:
6.2.2 85% against completion of fou
- Page 184 and 185:
GENERAL NOTEBefore start of work, t
- Page 186 and 187:
3.1.4 The bidder shall submit, alon
- Page 188 and 189:
methodologies which he is going to
- Page 190 and 191:
Bidder’s Quality PlanPO/ Contact
- Page 192 and 193:
23Check for excessive temperature r
- Page 194 and 195:
LT MOTORSSlNo. ACTIVITY CONTRACTOR
- Page 196 and 197:
MLDB, LP AND PDBsSlNo. ACTIVITY CON
- Page 198 and 199:
PRELIMINARY CHECKS1 Check that cabl
- Page 200 and 201:
1.0 INTRODUCTION2.0 SCOPEThis docum
- Page 202 and 203:
4.4 TESTINGPrior to shop prefabrica
- Page 204 and 205:
6.0 ATTACHMENT (WAIVER/DEVIATION PE
- Page 206 and 207:
TO BE COMPLETED BY CUSTOMER ‘TECH
- Page 208 and 209:
APPENDIX -VI TO SCCHSE MANAGEMENT P
- Page 210 and 211:
INDEX1. CONDITIONS FOR ISSUE OF MAT
- Page 212 and 213:
NOTE :1)Landed Rate shall be arrive
- Page 214 and 215:
own cost to Owner's stores. In case
- Page 216 and 217:
MINIMUM NO. OF SKILLED MANPOWER (AT
- Page 218 and 219:
NOTE :-(1) The details of estimated
- Page 220 and 221:
MINIMUM EQUIPMENT DEPLOYMENT PART W
- Page 222 and 223:
22 Sand/Grit Blasting Cleaning M/c.
- Page 224 and 225:
45 GPS /GIS M/c for taking the co-o
- Page 226 and 227:
8 Excavator / Back Hoe (Ex 280/ 300
- Page 228 and 229:
31 Dead Weight Tester(Ravika 0-400k
- Page 230 and 231:
(2) Meeting the requirement of depl
- Page 232 and 233:
EXPERIENCE CRITERIA FOR KEY PERSONN
- Page 234 and 235:
1011LEAD WELDING /NDTENGINEERWAREHO
- Page 236 and 237:
1. The Labour rates are "all inclus
- Page 238 and 239:
EQUIPMENT HIRING/RECOVERY RATES(APP
- Page 240 and 241:
31. Pipe Trailers (FB / Semi Low Be
- Page 242 and 243:
INSTRUMENTS1. ELECTRONICS TRANSMITT
- Page 244 and 245:
16. SOLENOID VALVESA. AVCON CONTROL
- Page 246 and 247:
1. CENTRIFUGAL PUMPS VERTICAL - GEN
- Page 248 and 249:
G. UNIQUE INDUSTRIAL PACKINGSH. VIR
- Page 250 and 251:
K. TORMENE GAS TECHNOLOGY SPA, ITAL
- Page 252 and 253:
21. VALVE GLOBE FORGEDA. ASSOCIATED
- Page 254 and 255:
2. CABLES-CONTROL - PVCA. CCIB. FIN
- Page 256 and 257:
E. BHARTIA CUTLER HAMMER.F. CONTROL
- Page 258 and 259:
33. PERMANENT REFERENCE ELECTRODESA
- Page 260 and 261:
B. H & R JOHNSONC. BELL CERAMICSD.
- Page 262 and 263:
HINDUSTAN PETROLEUM CORPORATION LIM
- Page 264 and 265:
SR.No.A1234567BParticularsF13707 /C
- Page 266 and 267:
1 RJ/15/568 (P5322) - 24/12/2012234
- Page 268 and 269:
3NCR/GAS-O&M/DM(O&M)-152/2012/216 -
- Page 270 and 271:
2 34091/05/12-IA/728 - 3/5/2012G12H
- Page 272 and 273:
18192021222324252627282930313233342
- Page 274 and 275:
CHAPTER-5BRIEF SUMMARY OFAGREED TER
- Page 276 and 277:
(ix) Confirm acceptance of Liquidat
- Page 278 and 279:
1. Annexure-A Bid Security FormCHAP
- Page 280 and 281:
ANNEXURE-ABID SECURITY FORMBANK GUA
- Page 282 and 283:
COMPOSITE BANK GUARANTEE FOR SECURI
- Page 284 and 285:
writing.8. We, ....................
- Page 286 and 287:
ANNEXURE--DDECLARATION (NOT BANNED)
- Page 288 and 289:
ANNEXURE-FQUALIFICATION FORMAT - FO
- Page 290 and 291:
ANNEXURE-GIntegrity Pact[KK1]MH2145
- Page 292 and 293:
form part of this contract / supply
- Page 294 and 295:
INTEGRITY PACTBetweenHindustan Petr
- Page 296 and 297:
caused by him and has installed a s
- Page 298 and 299:
Section 9 — Pact DurationThis Pac
- Page 300 and 301:
MH2145-C000-PS-RFQ-0020Page 300 of
- Page 302 and 303:
MH2145-C000-PS-RFQ-0020Page 302 of
- Page 304 and 305:
Note:1. The message should be in Co
- Page 306 and 307:
3 . We ............................
- Page 308 and 309:
ANNEXURE-JBANK GUARANTEE FOR MOBILI
- Page 310 and 311:
10. "The Bank" has power to issue t
- Page 312 and 313:
servants and/or agents whatsoever t
- Page 314 and 315:
UNDERTAKING (CORPORATE/ NON-CORPORA
- Page 316 and 317:
ANNEXURE-NUNDERTAKING OF ADEQUATE C
- Page 318 and 319:
2 This Guarantee/Undertaking shall
- Page 320 and 321:
Annexure-PNAME OF SUPPLY : ……
- Page 322 and 323:
ANNEXURE - Q.1Business Rules for fi
- Page 324 and 325:
v. After the completion of English
- Page 326 and 327:
Annexure - Q.IIN.B.Terms & Conditio
- Page 328 and 329:
Annexure- Q.IIIProcess Compliance F
- Page 330 and 331:
Annexure Q.VCONTACT INFORMATION....
- Page 332 and 333:
Annexure -SCERTIFICATE OF NON-INVOL
- Page 334 and 335:
CHAPTER NO.8PRICE BID FORMATMH2145-
- Page 336 and 337:
PRICE SCHEDULE (INDIAN BIDDERS)Sche
- Page 338 and 339:
PRICE SCHEDULE (INDIAN BIDDERS)Sche
- Page 340 and 341:
PRICE SCHEDULE (INDIAN BIDDERS)Sche
- Page 342 and 343:
Item No. Item Description Unit Quan
- Page 344 and 345:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 346 and 347:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 348 and 349:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 350 and 351:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 352 and 353:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 354 and 355:
PRICE SCHEDULE (INDIAN BIDDERS)Sche
- Page 356 and 357:
m No. Short description Item Descri
- Page 358 and 359:
m No. Short description Item Descri
- Page 360 and 361:
m No. Short description Item Descri
- Page 362 and 363:
m No. Short description Item Descri
- Page 364 and 365:
Item No. Item Description Unit Quan
- Page 366 and 367:
UN PRICE SCHEDULE (INDIAN BIDDERS)S
- Page 368 and 369:
UN PRICE SCHEDULE (INDIAN BIDDERS)S
- Page 370 and 371:
UN PRICE SCHEDULE (INDIAN BIDDERS)S
- Page 372 and 373:
Item No.PRICE SCHEDULE (FOREIGN BID
- Page 374 and 375:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 376 and 377:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 378 and 379:
PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 380 and 381:
UN PRICE SCHEDULE (FOREIGN BIDDERS)