12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.0 PAINTING ON EQUIPMENTS/PIPING/STRUCTURAL STEEL ETC.a) EQUIPMENTSI) For columns, vessels, reactors, exchangers, furnaces, ejectors etc.measurement shall be on square meter basis taken over the painted surface.II) For pumps, motors and <strong>com</strong>pressors measurement shall be made onnumber basis.b) PAINTING ON PIPING INCLUDING SPECIALS AND FITTINGSI) Payment will be made on linear measurement in 'Metres' corrected tothe nearest centimeter.II) Piping shall be measured along the centre line through all types offittings and flanges.III) Rates for painting of pipes shall be inclusive of painting of all types ofpipe supports, flanges, guides, shoes, saddles, clamps, etc. and alsoall types of fittings except valves (2"" and above) which shall be paidseparately on number basis.IV) There will be no separate measurements of the colour bands/identification signs (line numbering), flow direction etc. on un insulatedpiping, the rates of painting of linear length of piping shall be inclusiveof cost of such items.c) PAINTING ON STEEL STRUCTUREI) Payment for steel structures shall be made on the basis of admissibleweight of structure painted.II) Welds, bolts, nuts, washers etc. shall not be measured and rates forpainting of structure shall be inclusive of painting such items.MH2145-C000-PS-RFQ-0020Page 177 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!