12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.0 INTRODUCTIONThis specification establishes the Quality Assurance requirements to be met byContractors (including turnkey contractors) and vendors.In case of any conflict between this specification and other provisions of thecontract/purchase order, the same shall be brought to the notice ofWORLEYPARSONS,at the stage of bidding and shall be resolved withWORLEYPARSONS, prior to the placement of order.2.0 DEFINITION2.1 BidderFor the purpose of this specification, the word "Bidder" means the person(s), firm,<strong>com</strong>pany or organization who is under the process of being contracted byWORLEYPARSONS /HPCL for delivery of some products (including service). Theword is considered synonymous to supplier, contractor or vendor.2.2 CorrectionAction taken to eliminate the detected non-conformity. Refers to repair, rework oradjustment and relates to the disposition of an existing non-conformity.2.3 Corrective ActionAction taken to eliminate the causes of an existing nonconformity, defect or otherundesirable situation in order to prevent recurrence.2.4 Preventive ActionAction taken to eliminate the causes of a potential nonconformity, defect or otherundesirable situation in order to prevent occurrence.2.5 ProcessSet of inter-related resources and activities which transform inputs into outputs.2.6 Special ProcessProcesses requiring pre-qualification of their process capability.3.0 SCOPE OF WORK BY CONTRACTOR3.1 Prior to award of contract3.1.1 The bidder shall understand scope of work, drawings, specifications and standardsetc., attached to the tender/enquiry document, before he makes an offer.3.1.2 The bidder shall submit milestone chart showing the time required for each milestoneactivity and linkages between different milestone activities along with overall timeperiod required to <strong>com</strong>plete the entire scope of work.3.1.3 The bidder shall develop and submit manpower and resource deployment chart.MH2145-C000-PS-RFQ-0020Page 185 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!