PRICE SCHEDULE (INDIAN BIDDERS)Schedule of Quantities for 18” dia Rewari - Kanpur Cross Country Pipeline ( Part II)INSTALLATION OF CASING PIPE:Cased crossings including installation of cased pipe including transportation of casing pipes from Contractor’s storage point to worksite.Installation of casing pipe by jacking /boring for rail, road or canal crossings wherever required in all types of soils and terrain as per enclosedreference drawing,etc. including supply of all other materials, equipments, consumables, manpower, welding including visual inspection of allweld joints,supply & installation of casing insulators, end seals, fill material inside casing(as per scope of work), back filling and restoration ofthe facility crossed to its original condition and performing all works as per drawings, specifications, conditions of crossing approval andinstructions of Engineer-In-Charge and provisions of Contract document.117Cased Crossings 610 mmAll works for installation of casing pipe of size 610 mm, Material API 5L Gr B/IS:3589, Wall Thickness 7.9 mmLength of cased crossing by jacking/boringAll works for installation of casing pipe of size 168.3 mm for OFC including insertion of 2 nos.HDPE pipes in the same casingLength of cased crossing by jacking/boringPIPELINE INSTALLATION AT MAJOR RIVER BY HDD TECHNIQUEM550118Cased Cross 168.3 HDPEM550Complete works for the Major River crossings by HDD technique including design and detailed engineering of the crossings, mobilization anddemobilization at site(s), supply of all material as per “Scope of Supply” and all consumables equipments, manpower and other resources, andtemporary acquisition of the required land for site preparations and execution of, but not limited to the above works as per specification,drawings and as per provisions of contract document and instructions of Owner/ Engineer-in-Charge .Seperate Installation including transportation of CS conduit for OFC from Contractor’s storage point to worksite. Installation of CS Conduit pipeby HDD for major canal and other crossings wherever required in all types of soils and terrain and all other materials as per enclosed referencedrawing including supply of all other materials, equipments, consumables, manpower, welding including visual inspection of all weld joints,installation of casing insulators, end seals, back fillings and restoration as original of the facility crossed and performing all works as perdrawings, specifications and instructions of Engineer-In-Charge and provisions of Contract document .Note: For HDD works, the measurement shall be considered as per Drawing No: MH2145-C000-PL-DST-0020 & paid as per SOR Item. Forrest of the portion of the Pipeline it shall be measured and paid as per Pipeline works.Note:1. Rates quoted shall be applicable for various crossing at different locations.2. Contractor shall be paid based on distance between tie-in points at two ends of crossing on string length basis and not for the distancebetween points of entry & exit.Pipe OD : 457mmPipe OD : 168.3mm119 P/L INST MJR RIVER HDD457 For all works under River crossing, refer Crossing List. (No of River - 5 nos) M 900120P/L INST MJR RIVER HDD168For all works under River crossing,( no. of River -5 nos) (for Pipe OD: 168.3mm) including insertion of 2 Nos HDPE pipe in the casing M 900PIPELINE INSTALLATION AT MAJOR CANALS / OTHER CROSSINGS BY HDD TECHNIQUEComplete works for the major canals/State Highways/National Highways/other crossings; if any by HDD technique including design anddetailed engineering of the crossings, mobilization and demobilization at site(s), supply of all material as per “Scope of Supply” and allconsumables equipments, manpower and other resources, and temporary acquisition of the required land for site preparations and executionof, but not limited to the above works as per specification, drawings and as per provisions of contract document and instructions of Owner/Engineer-in-Charge .Installation including transportation of CS conduit for OFC from Contractor’s storage point to worksite. Installation of CS Conduit pipe by HDDfor major canal and other crossings wherever required in all types of soils and terrain and all other materials as per enclosed reference drawingincluding supply of all other materials, equipments, consumables, manpower, welding including visual inspection of all weld joints, installationof casing insulators, end seals, back fillings and restoration as original of the facility crossed and performing all works as per drawings,specifications and instructions of Engineer-In-Charge and provisions of Contract document .Note: For HDD works, the measurement shall be considered as per Drawing No: MH2145-C000-PL-DST-0020 & paid as per SOR Item. Forrest of the portion of the Pipeline it shall be measured and paid as per Pipeline works.Note:1. Rates quoted shall be applicable for crossing at different locations.2. Contractor shall be paid based on distance between tie-in points at two ends of crossing on string length basis and not for the distancebetween points of entry & exit.Pipe OD : 457 mmPipe OD : 168.3 mmAll works mentioned above for Major Canal/State highway/National highway crossings as per the Crossing List and any other crossing as perthe directions of Engineer-In-Charge for Pipe OD: 457mm121CROSS MJR CAN/SH/NH 457M 1000122CROSS MJR CAN/SH/NH 168For all works mentioned above for Major Canal/State highway/National highway crossing as per the Crossing List and any othre crossing asper the directions of Engineer-in-charge for casing Pipe OD: 168.3mm including insertion of 2 nos. HDPE pipes in the same casingINSTALLATION OF VALVES/SCRAPER TRAPS/EQUIPMENTS/ABOVE GROUND PIPELINE AND OTHER FACILITY AT DISPATCHAND RECEIVING STATION AND SV STATIONS:Receiving and taking over of all Owner supplied materials, equipments from Owner’s designated place(s) of issue, transportation includingloading, unloading, handling from Owner designated place(s) of issue to Contractor’s own stock yard(s)/work shop(s) including arranging allnecessary intermediate storage areas(s) thereof, as required; Installation of all materials, equipment, consumables as defined in Contractor’sscope of supply and its transportation to the work site(s); Installations of above ground piping, valves, bar tees, IJs, equipments includingwelding, testing (destructive and non-destructive), Painting (as per specification), supply and fixing of gaskets, bolts, studs, nuts as required,leveling, aligning, installation and assembly of accessories including accessories for actuators, if any, by bolting /threading or welding of pipesat all elevations as per drawings, specification, other provisions of Contract and directions of the Engineer-in-Charge.M 1000Installation of Scraper Launcher including jib crane and PIG trolley, PIG signallers, as per detailed Scope of WorkINST VALVE LAUNCH Sayyadpur (Major Barrel Size-24 INCH, Minor Barrel Size-18 INCH, Rating-600#) forSet123 1Saiyyadpur PranInstallation of Scraper Receiver including PIG trolley, PIG Signallers as per detailed Scope of Work:(Major Barrel Size-24 INCH, Minor Barrel Size-18 INCH, Rating-600#)124 Saiyyadpur Pran Set 1INST VALVE Reciever Sayyadpur125 Kanpur Set 1INST VALVE Reciver KanpurInstallation of aboveground 18” pipeline between Scrapper Launcher / Revciever, Barred Tee, IJ , Station by-pass line Check Valve, StationInlet / Outlet Valve) including installation of Barred Tees, IJs as per detailed Scope of Work126 INST VLV RECIEVER Bharatp Saiyyadpur Pran Mtrs 150127 INST VLV RECIEVER MATHURA Kanpur Receipt Station Mtrs 20128Installation of aboveground 18” 600# Check-Valve (flanged) in Station By-pass lines at Saiyyadpur Pran including supply of all necessary boltsNo 1INST Abv grd scr/rec REWAR / studs & nuts, gaskets etc. all <strong>com</strong>plete as per detailed Scope of work.129Installation of buried Long stem Sectionalizing Valves (SVs),Station Limit Valves (SLVs), Scrapper Launcher / Reciever Isolation Valves,No 17INST Abv grd scr/rec Bhart Station by-pass Valves, Station Inlet / Outlet Valves as per the Scope of Work.Transportation of valves to the work site of installation of valves, including supply and fixing of gaskets, bolts, studs, nuts, wherever required,leveling, aligning, installation and assembly of accessories including accessories for actuators, if any by bolting/threading or welding of pipes atall elevations, testing, <strong>com</strong>pleting all work in all respects as per drawings, specifications, other provisions of contact and direction of theengineer-in-charge130Installation of above ground Flanged Valves (Ball / Plug / Check / Globe and Double Block and Bleed Valves) as per details given below: SizeNOS 81INST Abv grd scr/rec Mathu 4 INCH and below , Rating 150,600 & 800131Installation of above ground Flanged Valves (Ball / Plug / Check / Globe and Double Block and Bleed Valves) as per details given below: SizeNOS 5INST 18" check valve6 INCH and above , Rating 600132Installation of above ground Flanged Valves (Ball / Plug / Check / Globe and Double Block and Bleed Valves) as per details given below: SizeNOS 30INST 18" Long Steam SV vlv 2 INCH and below , Rating 600PERMANENT MARKERSupply, fabrication and Installation including assembling of following types of permanent markers along the route including all associated civilworks such as excavation in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approvedcolour and quality of primer and paint, stencil letter cutting for numbers, direction, chainage etc. restoration of area to original condition andperforming all works as per drawings, specifications and instructions of Engineer-in-Charge.Note: The painting of all markers shall conform to Normal Corrosive Environment of spec.513-MH2145-PL-SPC-0019 irrespective of whatevershown on respective standards.133 PM : Navigable Water sign Navigable Water Sign NOS 4134 PM: KM posts Kilometer Posts NOS 161135 PM: Warning signs Pipeline Warning Signs NOS 286136 PM : Boundary marker Right of use Boundary Markers NOS 2067137 PM: Arial marker Aerial Markers NOS 53138 PM: Direction Marker Direction Markers NOS 351139 PM: OFC joint pit marker OFC joint identification markers. NOS 100LEAKS/BURSTS (ATTRIBUTABLE TO OWNER)MAJOR LEAK (DETECTED BY VISUAL METHOD):All works for locating major leak/burst (occurred during hydrostatic testing) including necessary repairing/replacing defective pipe length,including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of welds and re-beveledarea, repair and re-testing of defective welds, coating of welded joints, clean-up retesting the pipeline including providing all necessaryequipments, labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings,specifications enclosed with the Contract and directions of Engineer-in-charge.Note: This rate is applicable for manufacturing defects in Company supplied material only.Major Leak (detected by visual method)(Pipeline Size-18 INCH)MINOR LEAK (DETECTED BY SECTIONALISING):MAJOR LEAK (VISUAL METHOD)140NOS 1All works for locating leak by sectionalizing or any other methods which cannot be located by visual means, including necessary repairing/replacing defective pipe length, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline,NDT of welds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline includingproviding all necessary equipments, labour, materials, consumables and inputs other than Owner supplied materials and performing all worksas per drawings, specifications enclosed with the Contract and directions of Engineer-in-ChargeNote: This rate is applicable for manufacturing defects in Company supplied material onlyMinor Leak (detected by sectionalizing)(Pipeline Size-18 INCH)IDLE TIME PRESERVATION OF PIPELINEPreservation of <strong>com</strong>plete pipeline and associated facilities and its maintenance including supply of all consumables, all equipment, man-poweretc. <strong>com</strong>plete as per the requirements of specifications of Engineer-in-ChargeMINOR LEAK SECTIONALISING141NOS1Page 4 of 9
PRICE SCHEDULE (INDIAN BIDDERS)Schedule of Quantities for 18” dia Rewari - Kanpur Cross Country Pipeline ( Part II)By filling and pressurizing with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor to maintain142the effectiveness of the inhibitor water for the following details:LS 1Preserve fill&prss.CI 6 M(Pipeline Size-457 mm, Pressure in bar(g) - 0.5, Specified period - 6 Months)By filling and pressurizing with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor to maintain143 Preserve fill&prss.CI 12 Mthe effectiveness of the inhibitor water for the following details:LS 1(Pipeline Size-457 mm, Pressure in bar(g) - 0.5, Specified period - 12 Months)Carrying out pre-<strong>com</strong>missioning checks and making the entire pipeline (including above ground and underground facility) ready for<strong>com</strong>missioning including supply of all equipment, manpower, consumables (including all types of PIGs and required materials), materials forall temporary works and performing all associated works, <strong>com</strong>plete as per the relevant specifications, other provisions of Contract documentand instructions of Engineer-in-Charge.144 Dewatering of entire p/l All works as per above for dewatering of entire pipeline. LS 1145 Swapping/flushing P/l All works as per above for swabbing/flushing as applicable of entire pipeline. LS 1146 Commisioning asst. RKPL All works as per above related to <strong>com</strong>missioning assistance during <strong>com</strong>missioning of Rewari-Kanpur Pipeline LS 1147Transportation of surplus bare/coated line pipes from the dump sites to Company’s designated storage areas For Haryana-Rewari, forRajasthan-Bharatpur, for Uttar Pradesh-Mathura & Kanpur Terminal including loading/ unloading /handling and carrying out all associatedworks like arranging for cranes, manpower, trailers, loading and unloading equipment; preparation of storage area at unloading point including M 7650providing all consumables, sand ridges, wooden sleepers, plastic sheets etc., preparation of material reconciliation statement all <strong>com</strong>plete asper the scope of work, provisions of contract document and directions of Engineer-in-chargeTransport surplus linepipe148GEO TEXTILE BAGS FOR ANTI-BUOYANCYUnit rate for additional works over and above for design, manufacture and supply of non-biodegradable geo-textile bags (made of polypropylenefabric) materials and installation of geo-textile bags duly filled with gravel/stone ballast on pipelines of all wall thickness for anti-buoyancy as M 1500GEO TEXTILE BAGS Anti- Bouper specification no 513-MH2145-PL-SPC-0023, drawings and instructions of Engineer-in-Charge and other provisions of the Contractdocument.REPAIR OF DEFECTES IN LINE PIPE (ATTRIBUTABLE TO COMPANY)149Repair defect upto 25mmRepair of defects not attributable to Contractor on Company supplied bare line pipes, noted and recorded at the time of “Receiving and takingover” by Contractor, in the presence of Company Representative including performing all works as per Scope of Work document 513-MH2145-PL-SOW-0001 specifications and instructions of Company representative in respect of the following :Cutting and re-beveling of defects due to lamination up to 25 mm for following pipe sizes457 mm (18”) OD x 6.4/ 7.1/ 7.9/ 8.7 mm thk. HSAW / LSAW / EW line pipesREPAIR OF DEFECTS IN LINE PIPE (ATTRIBUTABLE TO COMPANY)All works for the following :Cutting and re-bevelling (Defects beyond 25mm) from pipe ends due to lamination and carrying out ultrasonicinspection after repairing as per Scope of Work document 513-MH2145-PL-SOW-0001 for following pipe sizes:457 mm (18”) OD x 6.4 /7.1 /7.9 /8.7 mm thk. HSAW / LSAW / EW line pipesREPAIR OF DEFECTS IN LINE PIPE (ATTRIBUTABLE TO COMPANY)NO 10150Repair defect above 25mmNO 10All works for the following :Cutting and re-bevelling defects due to lamination after welding from pipe ends / body and carrying out ultrasonic151 Repair defect & reweldingNO 20inspection after repairing and rewelding as per Scope of work document 513-MH2145-PL-SOW-0001 for following pipe sizes:457 mm (18”) OD x 6.4 /7.1 /7.9 /8.7 mm thk. HSAW / LSAW / EW line pipesREPAIR OF COATING DEFECTES IN SURPLUS LINE PIPE FROM COMPANY X-STOCK (ATTRIBUTABLE TO COMPANY)152 Repair coating defectsRepair of coating defects not attributable to Contractor on Company supplied surplus bare line pipes, noted and recorded at the time of“Receiving and taking over” by Contractor, in the presence of Company representative including performing all works as per Scope of workdocument 513-MH2145-PL-SOW-0001 specifications and instructions of Company representative in respect of the following:M 10457 mm (18”) OD x 6.4/ 7.1/ 7.9/ 8.7 mm thk. HSAW / LSAW / EW line pipesInspection and testing of available coated line pipe at the Owner’s storage point indicated below, identification of line pipe good for the service(any repair to be carried out in coating or pipe bevel shall be recorded jointly with the owner while taking over the custody and the same shallbe carried out by the contactor and payment shall be made as per applicable SOR items) as required, and lifting of line pipe good for theservice and its transportation to Dump yard near Bahadurgarh including loading/ unloading /handling and carrying out all associated works likearranging for cranes, manpower, trailers, loading and unloading equipment; testing and inspection equipments, preparation of storage area atunloading point including providing all consumables, sand ridges, wooden sleepers plastic sheets, etc; preparation of material receiptstatement.Note - The line pipe tested and accepted by Contractor at the Owner’s storage point (with/without repair) shall be considered good for theservice and any further repairs before laying or repairs required during any stage of laying/ testing /pre-<strong>com</strong>missioning / <strong>com</strong>missioning shallbe done by the contractor at no extra cost to Owner. This line pipe shall be considered issued to the pipeline laying contractor from Dumpyard for further transportation to Pipeline route for laying purpose.153 Insp & Testing of pipe 6.4 18" Dia x 6.4mm THK coated line pipe from Bahadurgarh & Ramanmandi Terminal M 5000154 Insp & Testing of pipe 7.1 18" Dia x 7.1mm THK coated line pipe from Bahadurgarh & Ramanmandi Terminal M 430155 Insp & Testing of pipe 7.9 18" Dia x 7.9mm THK coated line pipe from Bahadurgarh & Ramanmandi Terminal M 2200156 Insp & Testing of pipe 8.7 18" Dia x 8.7mm THK coated line pipe from Ramanmandi Terminal M 25157 Insp&Testing uncoatpipe8.7 18" Dia x 8.7mm THK Uncoated from Bahadurgarh Terminal M 25LONG RADIUS BENDS158Fabrication of Long Radius (R=6D) Bends including coating from free issue Bare line pipe of Size 18” dia, thickness 8.7 mm, API 5L Gr. X-65,PSL2 as specified in scope of work, drawings and specifications for different TPs and terminals, stations from 18 to 90 degrees all <strong>com</strong>plete Nos 95LONG RADIOUS BENDS r=6D as per the provisions of the contract and directions of Engineer-in-charge.ELCTRONIC GEOMETRIC PIGGING OF PIPELINESCarrying out all works related to Magnetic Cleaning & Electronic Geometric Pigging (EGP) (inlcuding necessary runs of Magnetic Pig, EGP) ofpipeline including defect verification at a max. of 2 locations for each identified segment of pipeline including preparation of site reports, dataanalysis, preparation & submissison of final report (6 sets), inlcuding supply of material, euipment , manpower etc.as required.This item isinclusive of Mobilization/Demobilization of pigging tools, tackles, consumables, <strong>com</strong>pressors, pumps, accessories and personnel byCONTRACTOR at WORK SITE.as per specification and provisions of the bid document for 18” diameter Rewari-Kanpur Pipeline as per thesections listed below:(defect verification shall preferably be made for defects not attributable to pipeline laying contractor)159 EGP : Mathura- sayyadpur 18", 600# Pipeline between Mathura to Saiyyadpur Pran M 118300160 EGP : sayyadpur -Kanpur 18", 600# Pipeline between Saiyyadpur Pran to Kanpur M 162818162Repair of defect identified in EGP not attributable to the pipeline laying contractor inlcuding all necessary works for defect repair like cutting, rebevelling,welding (as required) including all material, manpower, consumables etc. all <strong>com</strong>plete as per the specifications & provisions of bid M 36EGP: repair of defectdocument.163P/l Mapper data gatheringPIPELINE DEFECT MAPPERData to be gathered throughout the strech of pipeline by using pipeline defect mapper, GPS co-ordinates along with depth of the pipleine shallbe captured in 10 m intervals along the length of the pipeline including generation & submission of recordFABRICATION, WELDING, ERECTION, INSTALLATION & TESTING OF ABOVE GROUND PIPING : Receiving and Taking over of all(Owner and contractor supplied) materials from Owner's designated place(s) of issue, transportation including loading, unloading, handlingfrom Owner' designated place(s) of issue to Contractor's own stock yard(s)/ work site(s)/ work shop(s) including arranging all necessaryintermediate storage area(s) thereof, as required; supply of all materials (except those specified subsequently in SOR), equipment,consumables as defined in Contractor's scope of supply and their transportation to the work site(s); performing all above ground/buried pipingfabrication works including cutting, edge preparation (inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matchingedges of uneven/different thickness wherever required),fit up, pre-heating wherever required, welding, threading etc,; erection of pipes of alltypes and thickness over sleepers, overhead on racks and at all elevations, hook-up with equipment nozzles; installation of all type of valves upto size of 1.5" NB, all types of inline and online instrumentsKm 228Such as pressure/thermal safety valves(other than those covered separately), fittings of all sizes i.e, elbows, reducers, tees, 'o' lets, flanges,blind flanges, spectacle blinds, tappings for pressure gauges, thermo wells, hoses and hose couplings of all sizes, if applicable, sampleconnections, flame arrestors as applicable, vents and drains required for process and hydro-testing purposes etc. including fixing of all types ofgaskets (including gaskets for RTJ flanges), bolts, studs and nuts of all sizes; fabrication of strainers of sizes up to 1.5" , carrying out nondestructivetesting (excluding radiography covered subsequently in SOR) such as magnetic particle/ liquid penetration etc. as required; hookupwith existing piping/pipeline installed by others as per drawings wherever required; cleaning and flushing by water / <strong>com</strong>pressed air,carrying out hydrostatic test, pneumatic test, valve functional test and any other type of testing as specified, de-pressurizing, dewatering,drying by <strong>com</strong>pressed air if applicable; cutting/ re beveling as required, dewatering, drying by <strong>com</strong>pressed airand providing <strong>com</strong>missioning assistance to Commissioning Contractor / Agency for process piping and <strong>com</strong>missioning of non-process pipingif applicable; clean - up and restoration of site, preparation of as built drawings, documents and project records; transportation of surplus freeissue materials to Owner's designated place(s); <strong>com</strong>pleting all works in all respects as per the AFC drawings, specifications , standards andother provisions of Contract and instruction of Engineer-in-Charge. Note :- Installation of items such as valves (2" and above), flow meters,strainers of size 2" NB and above, equipments will be paid separately as per rates covered in appropriate items. Radiography of weld jointswould be measured and paid for separately as per separate schedule item.Installation of above ground Carbon Steel Process Piping as per details given below: Size ¾ INCH , Thk / Sch 80 , Material ASTM A106 Gr.164M 29Fabr,weld inst AbvGrd pipe 3/4" B , SeamlessInstallation of above ground Carbon Steel Process Piping as per details given below: Size 1 INCH , Thk/Sch 80 , Material ASTM A106 Gr. B165M 75Fabr,weld inst AbvGrd pipe 1" , SeamlessInstallation of above ground Carbon Steel Process Piping as per details given below: Size 2 INCH , Thk/Sch 40 , Material ASTM A106 Gr. B166M 51Fabr,weld inst AbvGrd pipe 2" 40 , SeamlessInstallation of above ground Carbon Steel Process Piping as per details given below: Size 2 INCH , Thk/Sch 80 , Material ASTM A106 Gr. B167M 38Fabr,weld inst AbvGrd pipe 2" 80 , SeamlessInstallation of above ground Carbon Steel Process Piping as per details given below: Size 4 INCH , Thk/Sch 40 , Material ASTM A106 Gr. B168M 106Fabr,weld inst AbvGrd pipe 4" 40 / API 5L GR. B, SeamlessInstallation of above ground Carbon Steel Process Piping as per details given below: Size 4 INCH , Thk/Sch 80 , Material ASTM A106 Gr. B169M 58Fabr,weld inst AbvGrd pipe 4" 80 / API 5L GR. B, SeamlessInstallation of above ground Carbon Steel Process Piping as per details given below: Size 8 INCH , Thk/Sch 80 , Material ASTM A106 Gr. B170M 55Fabr,weld inst AbvGrd pipe 8" 80 B / API 5L GR. B, SeamlessInstallation of above ground Carbon Steel Process Piping as per details given below: Size 16 INCH , Thk/Sch 80 , Material API 5L GR. X52,171M 157Fabr,weld inst AbvGrd pipe 8" 80 LSAWRADIOGRAPHYRadiography of weld joints of piping ( using gama or x-ray), including the cost of supply of all material, equipment and manpower required fordeveloping the films, review by ASNT qualified personnel, carrying out defect, repair, re-shoot etc. all <strong>com</strong>plete as per specifications and asdirected by the Engineer-in-charge. The radiography work shall be carried out <strong>com</strong>plying with all the statutory and safety requirements.Measurement will be done for each weld joint of respective size of piping. In case of any repair, re-shoot, re takes, the same shall not bemeasured again for payment.172 RADIOGRAPHY DIN20 DN 50 NOS 365173 RADIOGRAPHY DIN100 DN 100 NOS 185174 RADIOGRAPHY DIN200 DN 200 NOS 70175 RADIOGRAPHY DIN400 DN 400 NOS 106Page 5 of 9
- Page 1 and 2:
Hindustan Petroleum Corporation Ltd
- Page 3 and 4:
CHAPTER 1REQUEST FOR QUOTATION (RFQ
- Page 5 and 6:
Local ConditionsIt will be imperati
- Page 7:
The tender details including EMD, B
- Page 10 and 11:
his bid shall not be considered for
- Page 12 and 13:
5) This prime member shall be solel
- Page 14 and 15:
Note:1. All the information require
- Page 16 and 17:
EMD submitted by the bidder for sub
- Page 18 and 19:
however, bids in hard copies shall
- Page 20 and 21:
7.0 A firm which is not a PSU or an
- Page 22 and 23:
We are unable to bid for the reason
- Page 24 and 25:
CUT-OUT SLIPDO NOT OPEN- THIS IS A
- Page 26 and 27:
CUT-OUT SLIPDO NOT OPEN- THIS IS A
- Page 28 and 29:
QUOTATION AGAINST TENDERENQUIRY (En
- Page 30 and 31:
INDEXSR. NO.ARTICLE DESCRIPTION1.0
- Page 32 and 33:
modify the Bid Document. The amendm
- Page 34 and 35:
sealed and pasted with the enclosed
- Page 36 and 37:
l. Declaration with the bid qualifi
- Page 38 and 39:
Fax:91-22-67818080 in the presence
- Page 40 and 41:
for Part-II. In case such bidder is
- Page 42 and 43:
In case if the bidder quotes the ra
- Page 44 and 45:
xv)xvi)xvii)Non Submission of decla
- Page 46 and 47:
(c)When it is not possible to ascer
- Page 48 and 49:
14.7.2 To offset Central Sales Tax
- Page 50 and 51:
Where based on workability assessme
- Page 52 and 53:
tender terms not in deviation sheet
- Page 54 and 55:
INDEXSr. No. Article Description1.
- Page 56 and 57:
GENERAL TERMS & CONDITIONS OF CONTR
- Page 58 and 59:
2. 8 The "Drawings" shall include m
- Page 60 and 61:
3.6 The quantities indicated in the
- Page 62 and 63:
wherever required in the tender pap
- Page 64 and 65:
For working on Sundays/Holidays, th
- Page 66 and 67:
5.b COMMENCEMENT OF WORKThe contrac
- Page 68 and 69:
Contractor or the BG (if LD is full
- Page 70 and 71:
manufacture or fabrication or on th
- Page 72 and 73:
a. defects, if any, to be rectified
- Page 74 and 75:
payment of wages, salaries or other
- Page 76 and 77:
6.e.INSURANCE AND LABOURContractor
- Page 78 and 79:
iv. The contractor shall ensure tha
- Page 80 and 81:
7. PAYMENT OF CONTRACTOR'S BILLS7.
- Page 82 and 83:
shall be final and binding on the C
- Page 84 and 85:
7.e.4.Manufacturer's certificate sh
- Page 86 and 87:
accordance with the contract, the C
- Page 88 and 89:
12.0 TERMINATION OF CONTRACT12.1 Th
- Page 90 and 91:
Contractor to complete the job with
- Page 92 and 93:
shall be entitled at any time to in
- Page 94 and 95:
INDEX1. DEFINITION2. REFERENCE FOR
- Page 96 and 97:
and scope of work (technical), GPC
- Page 98 and 99:
In order to facilitate over-all exe
- Page 100 and 101:
Dimensions :For every order and eve
- Page 102 and 103:
26. CHANGESThe Owner has the option
- Page 104 and 105:
34. TECHNICAL INFORMATIONDrawings,
- Page 106 and 107:
Chapter: 4SPECIAL CONDITIONSOFCONTR
- Page 108 and 109:
44.0 DRAWINGS AND DOCUMENTS45.0 HOU
- Page 110 and 111:
viii) General Terms & Conditions of
- Page 112 and 113:
duties levied by statutory authorit
- Page 114 and 115:
stipulations including obtaining re
- Page 116 and 117:
4.1.3 Unless otherwise stated the t
- Page 118 and 119:
4.2.6 No Interest charges for delay
- Page 120 and 121:
9.0 PROVIDENT FUND, LABOUR, LABOUR
- Page 122 and 123:
not carried out work according to g
- Page 124 and 125:
16.a7 The Arbitrator may give a com
- Page 126 and 127:
19.0 Mobilization Advance19.1 Contr
- Page 128 and 129:
persons/persons or bodies/companies
- Page 130 and 131:
CONTRACTOR shall take all precautio
- Page 132 and 133:
Employer/Consultant shall not provi
- Page 134 and 135:
and return to the Contractor the st
- Page 136 and 137:
the work as per standards and all c
- Page 138 and 139:
42.0 COORDINATION WITH OTHER AGENCI
- Page 140 and 141:
pipelines, cables etc., during cons
- Page 142 and 143:
Engineer-in-charge during execution
- Page 144 and 145:
56.2 All the tests either on the fi
- Page 146 and 147:
The information to possible extent
- Page 148 and 149:
in part or in full.e) Functional Sc
- Page 150 and 151:
OWNER.66.4.4 Progress reports shall
- Page 152 and 153:
Order, or material of sub-standard
- Page 154 and 155:
75.11 Co-ordination with appropriat
- Page 156 and 157:
81.2 Contractor shall develop and s
- Page 158 and 159:
y them / Vendors shall be provided
- Page 160 and 161:
Contractor to note that it is their
- Page 162 and 163:
3.0 APPENDICES TO SCCMH2145-C000-PS
- Page 164 and 165:
SCOPE OF WORK & SUPPLY(APPENDIX-I t
- Page 166 and 167:
MATHURARKPL Project OfficeHPCL Depo
- Page 168 and 169:
12. Compensatory Afforestation as p
- Page 170 and 171:
TIME SCHEDULESr No Description Comp
- Page 172 and 173:
MEASUREMENT OF WORK(APPENDIX-III to
- Page 174 and 175:
The contractor shall submit the bil
- Page 176 and 177:
5.0 ELECTRICAL WORKS5.1 Cables5.1.1
- Page 178 and 179:
TERMS OF PAYMENT(APPENDIX-IV to SCC
- Page 180 and 181:
B) 5% on completion of all works in
- Page 182 and 183:
6.2.2 85% against completion of fou
- Page 184 and 185:
GENERAL NOTEBefore start of work, t
- Page 186 and 187:
3.1.4 The bidder shall submit, alon
- Page 188 and 189:
methodologies which he is going to
- Page 190 and 191:
Bidder’s Quality PlanPO/ Contact
- Page 192 and 193:
23Check for excessive temperature r
- Page 194 and 195:
LT MOTORSSlNo. ACTIVITY CONTRACTOR
- Page 196 and 197:
MLDB, LP AND PDBsSlNo. ACTIVITY CON
- Page 198 and 199:
PRELIMINARY CHECKS1 Check that cabl
- Page 200 and 201:
1.0 INTRODUCTION2.0 SCOPEThis docum
- Page 202 and 203:
4.4 TESTINGPrior to shop prefabrica
- Page 204 and 205:
6.0 ATTACHMENT (WAIVER/DEVIATION PE
- Page 206 and 207:
TO BE COMPLETED BY CUSTOMER ‘TECH
- Page 208 and 209:
APPENDIX -VI TO SCCHSE MANAGEMENT P
- Page 210 and 211:
INDEX1. CONDITIONS FOR ISSUE OF MAT
- Page 212 and 213:
NOTE :1)Landed Rate shall be arrive
- Page 214 and 215:
own cost to Owner's stores. In case
- Page 216 and 217:
MINIMUM NO. OF SKILLED MANPOWER (AT
- Page 218 and 219:
NOTE :-(1) The details of estimated
- Page 220 and 221:
MINIMUM EQUIPMENT DEPLOYMENT PART W
- Page 222 and 223:
22 Sand/Grit Blasting Cleaning M/c.
- Page 224 and 225:
45 GPS /GIS M/c for taking the co-o
- Page 226 and 227:
8 Excavator / Back Hoe (Ex 280/ 300
- Page 228 and 229:
31 Dead Weight Tester(Ravika 0-400k
- Page 230 and 231:
(2) Meeting the requirement of depl
- Page 232 and 233:
EXPERIENCE CRITERIA FOR KEY PERSONN
- Page 234 and 235:
1011LEAD WELDING /NDTENGINEERWAREHO
- Page 236 and 237:
1. The Labour rates are "all inclus
- Page 238 and 239:
EQUIPMENT HIRING/RECOVERY RATES(APP
- Page 240 and 241:
31. Pipe Trailers (FB / Semi Low Be
- Page 242 and 243:
INSTRUMENTS1. ELECTRONICS TRANSMITT
- Page 244 and 245:
16. SOLENOID VALVESA. AVCON CONTROL
- Page 246 and 247:
1. CENTRIFUGAL PUMPS VERTICAL - GEN
- Page 248 and 249:
G. UNIQUE INDUSTRIAL PACKINGSH. VIR
- Page 250 and 251:
K. TORMENE GAS TECHNOLOGY SPA, ITAL
- Page 252 and 253:
21. VALVE GLOBE FORGEDA. ASSOCIATED
- Page 254 and 255:
2. CABLES-CONTROL - PVCA. CCIB. FIN
- Page 256 and 257:
E. BHARTIA CUTLER HAMMER.F. CONTROL
- Page 258 and 259:
33. PERMANENT REFERENCE ELECTRODESA
- Page 260 and 261:
B. H & R JOHNSONC. BELL CERAMICSD.
- Page 262 and 263:
HINDUSTAN PETROLEUM CORPORATION LIM
- Page 264 and 265:
SR.No.A1234567BParticularsF13707 /C
- Page 266 and 267:
1 RJ/15/568 (P5322) - 24/12/2012234
- Page 268 and 269:
3NCR/GAS-O&M/DM(O&M)-152/2012/216 -
- Page 270 and 271:
2 34091/05/12-IA/728 - 3/5/2012G12H
- Page 272 and 273:
18192021222324252627282930313233342
- Page 274 and 275:
CHAPTER-5BRIEF SUMMARY OFAGREED TER
- Page 276 and 277:
(ix) Confirm acceptance of Liquidat
- Page 278 and 279:
1. Annexure-A Bid Security FormCHAP
- Page 280 and 281:
ANNEXURE-ABID SECURITY FORMBANK GUA
- Page 282 and 283:
COMPOSITE BANK GUARANTEE FOR SECURI
- Page 284 and 285:
writing.8. We, ....................
- Page 286 and 287:
ANNEXURE--DDECLARATION (NOT BANNED)
- Page 288 and 289: ANNEXURE-FQUALIFICATION FORMAT - FO
- Page 290 and 291: ANNEXURE-GIntegrity Pact[KK1]MH2145
- Page 292 and 293: form part of this contract / supply
- Page 294 and 295: INTEGRITY PACTBetweenHindustan Petr
- Page 296 and 297: caused by him and has installed a s
- Page 298 and 299: Section 9 — Pact DurationThis Pac
- Page 300 and 301: MH2145-C000-PS-RFQ-0020Page 300 of
- Page 302 and 303: MH2145-C000-PS-RFQ-0020Page 302 of
- Page 304 and 305: Note:1. The message should be in Co
- Page 306 and 307: 3 . We ............................
- Page 308 and 309: ANNEXURE-JBANK GUARANTEE FOR MOBILI
- Page 310 and 311: 10. "The Bank" has power to issue t
- Page 312 and 313: servants and/or agents whatsoever t
- Page 314 and 315: UNDERTAKING (CORPORATE/ NON-CORPORA
- Page 316 and 317: ANNEXURE-NUNDERTAKING OF ADEQUATE C
- Page 318 and 319: 2 This Guarantee/Undertaking shall
- Page 320 and 321: Annexure-PNAME OF SUPPLY : ……
- Page 322 and 323: ANNEXURE - Q.1Business Rules for fi
- Page 324 and 325: v. After the completion of English
- Page 326 and 327: Annexure - Q.IIN.B.Terms & Conditio
- Page 328 and 329: Annexure- Q.IIIProcess Compliance F
- Page 330 and 331: Annexure Q.VCONTACT INFORMATION....
- Page 332 and 333: Annexure -SCERTIFICATE OF NON-INVOL
- Page 334 and 335: CHAPTER NO.8PRICE BID FORMATMH2145-
- Page 336 and 337: PRICE SCHEDULE (INDIAN BIDDERS)Sche
- Page 340 and 341: PRICE SCHEDULE (INDIAN BIDDERS)Sche
- Page 342 and 343: Item No. Item Description Unit Quan
- Page 344 and 345: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 346 and 347: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 348 and 349: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 350 and 351: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 352 and 353: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 354 and 355: PRICE SCHEDULE (INDIAN BIDDERS)Sche
- Page 356 and 357: m No. Short description Item Descri
- Page 358 and 359: m No. Short description Item Descri
- Page 360 and 361: m No. Short description Item Descri
- Page 362 and 363: m No. Short description Item Descri
- Page 364 and 365: Item No. Item Description Unit Quan
- Page 366 and 367: UN PRICE SCHEDULE (INDIAN BIDDERS)S
- Page 368 and 369: UN PRICE SCHEDULE (INDIAN BIDDERS)S
- Page 370 and 371: UN PRICE SCHEDULE (INDIAN BIDDERS)S
- Page 372 and 373: Item No.PRICE SCHEDULE (FOREIGN BID
- Page 374 and 375: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 376 and 377: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 378 and 379: PRICE SCHEDULE (FOREIGN BIDDERS)Sch
- Page 380 and 381: UN PRICE SCHEDULE (FOREIGN BIDDERS)