12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

least two (2) weeks in advance to enable the Owner to arrange handing over of the 6(1) Gazettenotification & list of land owners of the ROU/site on the date requested. Should contractor fail insuch notification, the Owner shall not be liable for any claim by Contractor, of whatsoever nature,for delay in the availability of a ROU site.75.5 The Owner shall endeavour to procure the right-of-use for the entire pipeline in advance of the<strong>com</strong>mencement of the work by the Contractor for the construction of the pipeline. Should,however, this not be possible, the Contractor shall <strong>com</strong>mence work in respect of the section orsections of the pipelines for which the right-of-use has, for the time being, been acquired. Ifnecessary, because of any problem or difficulty concerning the right-of-use, or the procurementthereof in any section or sections due to the existence of any unforeseen or force majeureconditions covering at any location/section or sections of the pipeline right-of-use, the Contractorshall within the scope of the work and without entitlement to additional <strong>com</strong>pensation thereforeforthwith proceed to the next possible point of its continuance, in respect of which right-of-useexists and/or in which the construction work can be continued, and shall move in the oppositedirection, if necessary.75.6 The owner shall likewise endeavour to procure the permits/licenses required to be procured by theOwner under the contract sufficiently in advance to enable the contractor to continue movement ofthe Part in the same direction. Should, however, for any cause such permission/license not beavailable in time to match the progress of the work, the Contractor shall forthwith within the scopeof work and without entitlement to additional <strong>com</strong>pensation therefore forthwith proceed with thework at the next possible point of its continuance, including movement of the Part/ spread in theopposite direction, if necessary.75.7 The work should be executed in a phased manner as directed by forest authorities along theproposed length by putting suitable barriers to prevent accidental entry of wild animal in the worksite. The Contractor will take all precautions to prevent any accident involving wild animals andensure observance of all provisions of Wildlife (Protection) Act, 1972 as amended up to date andrelevant rules made there under by the workers and staff on work site.75.8 All expenditure and logistic support to Forest staff deputed during the execution of works will beprovided by the Contractor without any extension of time and additional cost to Owner.75.9 Acquisition of land for CP/SV/IP stations, Anode bed locations including all necessary liasoningwith government authorities is in the scope of the contractor.75.10 Owner shall provide Gazetted 6 (1) notification for the identified ROU along with list of Landowners.However, it will be the responsibility of contractor to take over the possession of the land for<strong>com</strong>mencement of Pipeline laying activity. Owner shall arrange to deposit Land and applicablecrop <strong>com</strong>pensation as awarded by the Competent Authority appointed for the project for respectiveStates.All necessary co-ordination with any government / regulatory / any other agencies for smooth / uninterruptedprogress of the job thereafter shall be the responsibility of the contractor. No requestfor additional <strong>com</strong>pensation on account of the above other than the contracted rates of serviceswill be entertained.MH2145-C000-PS-RFQ-0020Page 153 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!