Contractor to note that it is their responsibility during tendency of contract or otherwise tocoordinate with Forest department and <strong>com</strong>plete all the works pertaining to the aboveexercise of a forestation.vii.After Award of Job, Contractor to submit the network / work breakdown structure forall activities involved in the CP System say award of sub contract, Schedule & List ofDeliverables, expected review / approval cycle to ensure smooth / seamless releaseof the documents / Materials for TCP & PCP. The Contractor shall ensure that underno circumstances the TCP/PCP work is affected due to lack of Cash Flow betweenthe contractor and agency engaged by them in the event of work getting hampereddue to Cash Flow between the contractor and their agency, <strong>WorleyParsons</strong> / HPCLreserves the right to get the jobs done either through the same or other agencies atthe risk and cost of the Contractor.83.5 Contractors to strictly implement the HSE Management plan of WORLEYPARSONS aswell as HPCL’s Plan along with its related QA/ QC elements & Prices quoted should takecare of such elements. No Extra shall be paid for implementation of these clauses.Some of the major aspects are presented here-under for Execution:-i. Flow of 3Ms (Man/Material/Machinery) needed to be deployed to be ensured.ii. Status of 3Ms (Man/Material/Machinery) shall be reviewed during daily review meets toensure their consistent availability to meet the <strong>com</strong>pletion schedule.iii. Further argumentation of 3Ms (Man/Material/Machinery) meeting contractual scheduleshall be arrived based on earned value and contractor shall mobilise resourcesaccordingly. Predefined penalty shall be levied in case of non-<strong>com</strong>pliance.iv. Consistent irregularity/ failure in adherence to HSE requirements may also lead tohiring/ deployment of 3Ms (Man/Material/Machinery) at the risk and cost of thecontractor.v. There shall be HSE related meeting of about 10- 20 minutes every day before the startof job at site. This is to ensure deployment of healthy tools and tackles/ equipment/manpower etc. for consistent productivity. A clear record of the same is required to bemaintained.vi. Every activity to <strong>com</strong>mence only after <strong>com</strong>pliance of QA/ QC requirements. Well trained/ right QA /QC people to be deployed at site.vii. Non-<strong>com</strong>pliance / non-adherence to HSE clauses/ requirements shall lead to stoppage/ delay of work which shall be totally attributable to the contractor and no request fortime extension shall be entertained on this account.viii. Only on <strong>com</strong>pliance of all the relevant HSE requirements, construction activity shall<strong>com</strong>mence.ix. A minimum of 150 welding joints/ day / part is envisaged by opening 2 fronts/Spreadson each part. Each front/Spread to produce 75 welding joint. Contractor to draw up hisresources to plans accordingly.x. A separate crew/ set of equipment shall be deployed for all backlog works.MH2145-C000-PS-RFQ-0020Page 160 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!