inspection.57.5 Where facilities for testing do not exist in the Contractor's/ sub-contractor's laboratories, samplesand test pieces shall be drawn by the Contractor/ Sub-Contractor in presence of InspectionEngineer of a Employer/Consultant and duly sealed by the later and sent for testing inGovernment approved Test House or any other testing laboratories approved by the InspectionEngineer at the Contractor's cost.58.0 FINAL INSPECTION FOR WORKSAfter <strong>com</strong>pletion of all tests as per specification the whole work will be subject to a finalinspection to ensure that job has been <strong>com</strong>pleted as per requirement. If any defects noticed in thework attributable to Contractor, the Contractor at his own cost shall attend these, as and when theEmployer/Consultant brings them to his notice. The Employer/Consultant shall have the right tohave these defects rectified at the risk and cost of the contractor if he fails to attend to thesedefects immediately59.0 TEMPORARY WORKSAll Temporary and ancillary works including enabling works connected with the work shall beresponsibility of the Contractor and the price quoted by them shall be deemed to have includedthe cost of such works which shall be removed by the contractor at his cost, immediately after<strong>com</strong>pletion of his work.60.0 DISTINCTION BETWEEN FOUNDATION AND SUPERSTRUCTURE60.1 To distinguish between work in foundations and superstructures, the following criteria shall apply:60.1.1 For all Equipment pedestals, pipe racks, other foundation and R.C.C. Structures, work done upto300 mm level above finished grade level will be taken as work in foundations and work above thislevel will be treated as work in superstructures and payments would be made accordingly.60.1.2 For Buildings only, all works upto level corresponding to finished floor level shall be treated as'Work in foundation' and all works above the finished floor level shall be treated as "Work insuperstructure".60.1.3 Irrespective of what has been stated above, all pavements, R.C.C. Retaining wall, all pipesleepers and any similar item would be taken as work done in foundations irrespective oflocations, nomenclature and levels given anywhere.60.1.4 Where not specifically pointed out all works in Cellars/ sumps, Tank Pads, Cable trenches, orsuch similar item would be taken as work in foundation.61.0 UNDERGROUND AND OVERHEAD STRUCTURESMH2145-C000-PS-RFQ-0020Page 145 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!