12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRICE SCHEDULE (FOREIGN BIDDERS)Schedule of Quantities for 18” dia Rewari - Kanpur Cross Country Pipeline ( Part I)o. Short description Item Description Unit QuantityUnit Price inclusive of all cost towards Air/Rail fare, lodging,boarding, Traveling ,medical , localtransport, all insurances, in<strong>com</strong>e/corporate(as may be applicable) ,incidental chargesand all other expenses, taxes Itduties etc. but excluding service taxService Tax including cessapplicable onUnit Price(@ 12.36%)Total Price inclusive of all costtowards Air/ Rail fare, lodging,boarding, Traveling,medical , local transport, allinsurances, in<strong>com</strong>e/corporate (as maybe applicable),incidental charges and all otherexpenses , taxes It duties etc.including service tax(7) = (5 + 6) x 4PIPELINE INSTALLATION AT MAJOR RIVER BY HDD TECHNIQUEComplete works for the Major River crossings by HDD technique including design and detailed engineering of the crossings, mobilizationand demobilization at site(s), supply of all material as per “Scope of Supply” and all consumables equipments, manpower and otherresources, and temporary acquisition of the required land for site preparations and execution of, but not limited to the above works as perspecification, drawings and as per provisions of contract document and instructions of Owner/ Engineer-in-Charge .Seperate Installation including transportation of CS conduit for OFC from Contractor’s storage point to worksite. Installation of CS Conduitpipe by HDD for major canal and other crossings wherever required in all types of soils and terrain and all other materials as per enclosedreference drawing including supply of all other materials, equipments, consumables, manpower, welding including visual inspection of allweld joints, installation of casing insulators, end seals, back fillings and restoration as original of the facility crossed and performing all worksas per drawings, specifications, conditions of crossing approval, instructions of Engineer-In-Charge and provisions of Contract document .Note: For HDD works, the measurement shall be considered as per Drawing No: MH2145-C000-PL-DST-0020 & paid as per SOR Item.For rest of the portion of the Pipeline it shall be measured and paid as per Pipeline works.Note:1. Rates quoted shall be applicable for various crossing at different locations.2. Contractor shall be paid based on distance between tie-in points at two ends of crossing on string length basis and not for the distancebetween points of entry & exit.Pipe OD : 457mmPipe OD : 168.3mmP/L INST MJR RIVER HDD457 For all works under River crossing,( no. of River -3 nos) (for Pipe OD: 457mm) M 700For all works under River crossing,( no. of River -3 nos) (for Pipe OD: 168.3mm) including insertion of 2 nos.HDPE pipes in the sameP/L INST MJR RIVER HDD168Mcasing700PIPELINE INSTALLATION AT MAJOR CANALS / STATE HIGHWAY / NATIONAL HIGHWAY / OTHER CROSSINGS BY HDDTECHNIQUEComplete works for the major canals/State Highways/National Highways/other crossings; if any by HDD technique including design anddetailed engineering of the crossings, mobilization and demobilization at site(s), supply of all material as per “Scope of Supply” and allconsumables equipments, manpower and other resources, and temporary acquisition of the required land for site preparations andexecution of, but not limited to the above works as per specification, drawings and as per provisions of contract document and instructionsof Owner/ Engineer-in-Charge .Installation including transportation of CS conduit for OFC from Contractor’s storage point to worksite. Installation of CS Conduit pipe byHDD for major canal and other crossings wherever required in all types of soils and terrain and all other materials as per enclosed referencedrawing including supply of all other materials, equipments, consumables, manpower, welding including visual inspection of all weld joints,installation of casing insulators, end seals, back fillings and restoration as original of the facility crossed and performing all works as perdrawings, specifications, conditions of crossing approval, instructions of Engineer-In-Charge and provisions of Contract document .Note: For HDD works, the measurement shall be considered as per Drawing No: MH2145-C000-PL-DST-0020 & paid as per SOR Item.For rest of the portion of the Pipeline it shall be measured and paid as per Pipeline works.Note:1. Rates quoted shall be applicable for crossing at different locations.2. Contractor shall be paid based on distance between tie-in points at two ends of crossing on string length basis and not for the distancebetween points of entry & exit.Pipe OD : 457 mmPipe OD : 168.3mmAll works mentioned above for Major Canal/State highway/National highway crossings as per the Crossing List and any other crossing asCROSS MJR CAN/SH/NH 457Mper the directions of Engineer-In-Charge for Pipe OD: 457mm1400For all works mentioned above for Major Canal/State highway/National highway crossing as per the Crossing List and any othre crossingCROSS MJR CAN/SH/NH 168Mas per the directions of Engineer-in-charge for casing Pipe OD: 168.3mm including insertion of 2 nos. HDPE pipes in the same casing1400INSTALLATION OF VALVES/SCRAPER TRAPS/EQUIPMENTS/ABOVE GROUND PIPELINE AND OTHER FACILITY ATDISPATCH AND RECEIVING STATION AND SV STATIONS:Receiving and taking over of all Owner supplied materials, equipments from Owner’s designated place(s) of issue, transportation includingloading, unloading, handling from Owner designated place(s) of issue to Contractor’s own stock yard(s)/work shop(s) including arranging allnecessary intermediate storage areas(s) thereof, as required; Installation of all materials, equipment, consumables as defined inContractor’s scope of supply and its transportation to the work site(s); Installations of above ground piping, valves, bar tees, IJs, equipmentsincluding welding, testing (destructive and non-destructive), Painting (as per specification), supply and fixing of gaskets, bolts, studs, nutsas required, leveling, aligning, installation and assembly of accessories including accessories for actuators, if any, by bolting /threading orwelding of pipes at all elevations as per drawings, specification, other provisions of Contract and directions of the Engineer-in-Charge.Installation of Scraper Launcher including jib crane and PIG trolley, PIG signallers, as per detailed Scope of Work(Major Barrel Size-24 INCH, Minor Barrel Size-18 INCH, Rating-600#) forINST VALVE LAUNCH REWARI Rewari Set 1INST VALVE LAUNCH Bharatp Baharatpur Set 1INST VALVE LAUNCH Mathura Mathura Set 1Installation of Scraper Receiver including PIG trolley, PIG Signallers as per detailed Scope of Work:(Major Barrel Size-24 INCH, Minor Barrel Size-18 INCH, Rating-600#)INST VLV RECIEVER Bharatp Bharatpur set 1INST VLV RECIEVER MATHURA Mathura set 1Installation of aboveground 18” pipeline between Scrapper Launcher / Revciever, Barred Tee, IJ , Station by-pass line Check Valve, StationInlet / Outlet Valve) including installation of Barred Tees, IJs as per detailed Scope of WorkINST Abv grd scr/rec REWAR Rewari Despatch station Mtrs 20INST Abv grd scr/rec Bhart Bharatpur Intermediate Station Mtrs 40INST Abv grd scr/rec Mathu Mathura Intermediate Station Mtrs 40Installation of aboveground 18” 600# Check-Valve (flanged) in Station By-pass lines at Mathura & Bharatpur including supply of allINST 18" check valveNos.necessary bolts / studs & nuts, gaskets etc. all <strong>com</strong>plete as per detailed Scope of work.2Installation of 18" 600# buried Long stem Sectionalizing Valves (SVs),Station Limit Valves (SLVs), Scrapper Launcher / Reciever IsolationINST 18" Long Steam SV vlvNos.Valves, Station by-pass Valves, Station Inlet / Outlet Valves as per the Scope of Work.22Transp. Of valves to siteTransportation of valves to the work site of installation of valves, including supply and fixing of gaskets, bolts, studs, nuts, whereverrequired, leveling, aligning, installation and assembly of accessories including accessories for actuators, if any by bolting/threading orwelding of pipes at all elevations, testing, <strong>com</strong>pleting all work in all respects as per drawings, specifications, other provisions of contact anddirection of the Engineer-in-chargeInstallation of above ground Flanged Valves (Ball / Plug / Check / Globe and Double Block and Bleed Valves) as per details given below:Size 2 INCH and below , Rating 600 #PERMANENT MARKERSupply, fabrication and Installation including assembling of following types of permanent markers along the route including all associatedcivil works such as excavation in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application ofapproved colour and quality of primer and paint, stencil letter cutting for numbers, direction, chainage etc. restoration of area to originalcondition and performing all works as per drawings, specifications and instructions of Engineer-in-Charge.Note: The painting of all markers shall conform to Normal Corrosive Environment of spec.513-MH2145-PL-SPC-0019 irrespective ofwhatever shown on respective standards.Supply and Erection ofNos. 36PM : Navigable Water sign Navigable Water Sign NOS 3PM: KM posts Kilometer Posts NOS 183PM: Warning signs Pipeline Warning Signs NOS 263PM : Boundary marker Right of use Boundary Markers NOS 2223PM: Arial marker Aerial Markers NOS 45PM: Direction Marker Direction Markers NOS 399PM: OFC joint pit marker OFC joint identification markers. NOS 100Page 4 of 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!