12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

connection with the Order, the same shall be subject to the following and such other terms and conditionas may be imposed by HPCL. Such use or occupations shall not confer any right of tenancy of the landto the CONTRACTOR. The contractor shall submit fortnightly report covering all major activitiesindicating schedule / actual progress, slippages & its reasons and catch up plan.26.7 The CONTRACTOR shall have no right to put up any construction of his own of any nature or typeon HPCL's land except temporary constructions for storage of equipment's for the work under the Orderor as a resting place for the labourers employed by him for the work provided that he obtain the requisiteprevious permission in writing from HPCL / WORLEYPARSONS. In accordance with the HPCLprocedure with permission they would be entitled to refuse in their absolute discretion. Such constructionwill be erected at the CONTRACTORs own cost. The CONTRACTOR shall at his own cost demolish allsuch constructions and remove the debris thereof. As also all his materials and equipment's and cleanand level the site thereof before handing over the <strong>com</strong>pleted work to the HPCL.26.8 The CONTRACTOR shall provide if necessary or if required for the site all temporary access thereofand shall alter adapt and maintain the same as required from time to time and shall take up and clearthem away as and when no longer required and as and when ordered by HPCL / WORLEYPARSONSand make good all damages done to the site. The CONTRACTOR shall note that the final bill willnot be certified for payment till the action as above is <strong>com</strong>pleted by the CONTRACTOR to theentire satisfaction of HPCL / WORLEYPARSONS.26.9 All drawings, tracings, photo prints and writing (except letter) shall be the sole property of HPCL andmust be returned to them on <strong>com</strong>pletion of work. The drawings maintained on the site are to be carefullymounted on boards of appropriate size. They are to be protected from ravages from termites, ants,silverfish and other insects.26.10 The <strong>com</strong>pletion of the work may entitle working in the monsoon also. The CONTRACTOR mustmaintain labour force as may be required for the job and plan and execute the construction anderection according to the prescribed schedule No extra rate will be considered for such work inmonsoon. The Time schedule includes monsoon window period also. Hence request for timeExtension due to monsoon may not be entertained by HPCL.26.11 During the execution of the work CONTRACTOR must check his work with his drawings. TheCONTRACTOR shall be responsible for all the errors in this connection and shall have to rectifyall defects and / or error at his own cost failing which HPCL reserves the rights to get the samerectified at the risk and cost of the CONTRACTOR.26.12 During inclement weather the CONTRACTOR shall suspend concreting and plastering for suchtime as HPCL / WORLEYPARSONS may direct and shall protect from injury all works in thecourse of erection.26.13 Should the work be suspended by reason of rain, strike, lockouts or other cause theMH2145-C000-PS-RFQ-0020Page 129 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!