12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contractor shall carry out the necessary rectifications to the foundations within his quoted price.68.2 The Contractor shall also be responsible for checking with templates, wherever necessary, thedisposition of foundation bolts with the corresponding bases of structure and shall effectrectifications, as directed, within his quoted rate.69.0 STORAGE FACILITIES69.1 The Contractor shall maintain wherever required an air-conditioned room for the storage of theinstruments as well as for calibration and testing of the instruments at his own cost. Thecontractor shall provide these facilities within the quoted price.70.0 WORK PERMIT70.1 When Contractor is working in HPCL's Licensed Premises ( as per Explosives Dept),Contractor tonote that in HPCL's RKPL Project, Contractor would be required to obtain applicable hot work/ coldwork permits on daily basis from the <strong>com</strong>petent authority. Contractor shall also <strong>com</strong>ply with all theconditions on the work permit / entry permits at no extra cost to owner at all the works locations.Contractor shall be required to obtain police verification for obtaining of work/entry permits to workinside the HPCL premises for all the employees and workers employed for the job.70.2 The CONTRACTOR shall be given approved identity cards to all his workers, which will have to beproduced by the CONTRACTORs' workmen as and when demanded by the HPCL'srepresentatives or Security men.70.3 Action where there is no specificationIn case of any class of work over which there is no specification mentioned, the same shall becarried out in accordance with the latest edition of Indian Standard Specifications subject to theapproval of the Consultants and Client.70.4. Typographical or Clerical ErrorsThe HPCL / WORLEYPARSONSs clarifications regarding partially omitted particulars ortypographical or clerical errors shall be final and binding on the CONTRACTOR.71.0 DELETED72. GOVT. ACTS/ REGULATIONSAny reference to the Govt. Acts / Regulations etc. in the Bid Document is only indicative, and it is entirelyfor the Bidder to ascertain the applicable Acts / Regulations.73. SUBSTITUTION, WRONG SUPPLIES AND SHORT SUPPLIESUnauthorized substitution or materials delivered in error, other than those mentioned in theMH2145-C000-PS-RFQ-0020Page 151 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!